General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Brad Foster, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2024-03
Part 1 Widening of Cleveland Ave between Elmore Ave and Melrose Ave, signal modifications at Huy Rd and Elmore Ave, construction of concrete medians between Huy Rd and Cooke Rd including crosswalks and RRFB's, lane modifications, resurfacing, and lighting improvements on Cleveland Ave from Huy Rd. to Cooke Rd, and resurfacing on Innis Rd. for 400 feet with a proposed concrete median to control access. Part 2 Provide crosswalk improvements at Cleveland Ave at Dunedin Rd and Cleveland Ave at Piedmont Rd/Dunbar Dr. Crosswalk improvements will include installation of mast arm mounted, overhead Pedestrian Crossing Warning Signs with solar powered Rectangular Rapid Flashing Beacons (RRFB’s), and pedestrian refuge islands. DBE Percentage = 8% Engineer's Estimate = $4,607,522.54
07/02/2024 02:00 PM UTC
2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 - Re-Bid DBE Goal: 10% Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road. Engineer's Estimate: $14,420,295.53 Revised Substantial Completion Date: October 31, 2026 Revised Final Completion Date: November 30, 2026
05/28/2024 02:00 PM UTC
2024-02
Alkire Road at Demorest Road Storm Sewer Replacement EBE Goal = 10% Remove and replace approximately 500 feet of existing storm sewer pipe (structures are to remain in place) at the intersection of Alkire Road and Demorest Road, including all associated pavement restoration. Improve roundabout center island landscaping by placing river stone and sandstone blocks. Engineer's Estimate = $374,668.29
05/21/2024 06:00 PM UTC
2024-09
Norwich Township Safety Services Building Pavement Improvement. EBE Goal 8% The project includes removal and replacement of a portion of the concrete parking lot and driveway at the Norwich Township Safety Services Building. Engineer's Estimate = $300,000
05/14/2024 06:00 PM UTC
2024-10
Franklin County Township Resurfacing Program DBE Goal 8% Upgrading various sections of Franklin County Township roadways, detailed within; with asphalt resurfacing and aggregate berm material. Engineer's Estimate $6,527,880.15
05/02/2024 06:00 PM UTC
2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 - DBE Goal: 10% Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road. Engineer's Estimate: $12,094,232.06
04/30/2024 02:00 PM UTC
2024-01
Clouse Road Drainage Improvement (Plain Township) The project includes drainage improvements within the public right of way on Clouse Road in Plain Township, Franklin County, Ohio. These improvements include the installation of 1,100 feet of new storm sewer conduit and structures, ditch grading, and miscellaneous drainage improvements that are tributary to Blacklick Creek. Engineer's Estimate = $444,909.00. EBE Goal = 8%.
04/16/2024 06:00 PM UTC
2024-07
Upgrading 5.104 miles of various sections of Franklin County roadways with asphalt resurfacing and aggregate berm material.
03/19/2024 06:00 PM UTC
2024-05
Alton & Darby Creek Road 1.88 over Clover Groff Ditch (FRA-CR272-1.88) - Construct a complete bridge replacement of the existing Alton & Darby Creek Road over Clover Groff Ditch structure to accommodate future pedestrian mobility improvements. Widening of Alton & Darby Creek Road to extend a southbound left turn lane and widening Feder Road to add a westbound right turn lane. EBE Goal = 6%
03/12/2024 02:00 PM UTC
2023-05
Elmore Avenue Sidewalk Improvements, EBE Goal = 6% Construction of 3, 615 feet of concrete sidewalk along the south side of Elmore Avenue, between Karl Road and Cleveland Avenue, along with associated work. Engineer's Estimate = $519,805.65
07/18/2023 02:00 PM UTC
1 - 10 of 92 Solicitations
← Previous 1 3 4 5 6 7 8 9 10