Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Adam W. Fowler, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2025-15
East Cooke Road (Karl Road to Cleveland Avenue) FRA-CR80-2.67 - PID 115411 This project includes the full depth reconstruction of 1.02 miles of East Cooke Road, from Karl Road to Cleveland Avenue. This project will also construct curb and gutter, a 10' wide asphalt shared-use path, a 5' wide concrete sidewalk, storm sewer improvements, and highway lighting from Walford Street to Cleveland Avenue. ENGINEER'S ESTIMATE = $6,902,079.47 THERE IS NO DBE GOAL ON THIS PROJECT IN ACCORDANCE WITH NEW FEDERAL REQUIREMENTS.
11/18/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2020-11
REBID of Smothers Road at Harlem Road BMP Redesign. Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road. ENG ESTIMATE $128,438.98
07/14/2020 02:00 PM UTC
2020-09
Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $2,487,943.25
07/07/2020 06:30 PM UTC
2020-08
Mann Rd 0.50 over Tributary of Rocky Fork Creek (JEF-TR107-0.50) - Replacement of the existing concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work. ENG ESTIMATE - $542,650.62
06/30/2020 06:00 PM UTC
2020-04
Smothers at Harlem BMP Improvement Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road ENG ESTIMATE $112,827.48
06/23/2020 02:00 PM UTC
2020-06
Upgrading 11.140 miles of various sections of Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $ 2,379,923.89 ENG ESTIMATE W/ALTERNATE $ 2,691,250.29
05/19/2020 06:30 PM UTC
2020-05
Ridpath Rd 0.69 over Stanford Smith Ditch (JAC-TR270-0.69) - This project consists of upgrading 0.05 miles of Ridpath Road by replacing the existing bridge over Stanford Smith Ditch, providing new drainage structures, and minimal roadway approach improvements. ENGINEER ESTIMATE - $276,561.15
05/19/2020 06:00 PM UTC
2019-14
Reynoldsburg-New Albany Road at Clark State Road Improvements: Upgrading 0.34 miles of Reynoldsburg-New Albany Road and 0.19 miles of Clark State Road by constructing a modern roundabout at the intersection of Reynoldsburg-New Albany Road and Clark State Road. The project also includes the installation of a closed storm sewer system, waterline, street lighting, sidewalks, and various other improvements. ENG ESTIMATE $2,845,999.20
05/12/2020 02:00 PM UTC
2020-05
Ridpath Rd 0.69 over Stanford Smith Ditch (JAC-TR270-0.69) - This project consists of upgrading 0.05 miles of Ridpath Road by replacing the existing bridge over Stanford Smith Ditch, providing new drainage structures, and minimal roadway approach improvements. ENGINEER ESTIMATE - $237,810
04/28/2020 06:00 PM UTC
2019-18
Dublin-Granville Road over Rocky Fork Creek (FRA-CR546-12.90) Replacement and widening of the existing bridge over Rocky Fork Creek including the addition of a shared use path over the bridge and approximately 270 feet of shared use path along the south side of Dublin-Granville Road. ENG ESTIMATE - $1,196,999.83
04/07/2020 06:00 PM UTC
2019-15
Alum Creek Drive & Rohr Road Improvements: This project consists of the addition of right and left turn lanes at the intersection of Alum Creek Drive and Rohr Road, the addition of a second eastbound lane on Rohr Road from Alum Creek Drive to Port Road, a new signal installation at Alum Creek Drive at Rohr Road , pavement resurfacing, storm sewer and necessary traffic control devices. ENGINEER'S ESTIMATE: $3,358,178.56
03/31/2020 02:00 PM UTC
81 - 90 of 113 Solicitations