General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Adam W. Fowler, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2020-10
2020-21 General Drainage Maintenance Assist the Franklin County Drainage Engineer and the Franklin County Engineer with work to excavate, repair, replace and upgrade various on road and off road stormwater drainage systems in Franklin County. ENG ESTIMATE: $1,199,999.00
07/23/2020 06:00 PM UTC
2020-11
REBID of Smothers Road at Harlem Road BMP Redesign. Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road. ENG ESTIMATE $128,438.98
07/14/2020 02:00 PM UTC
2020-09
Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $2,487,943.25
07/07/2020 06:30 PM UTC
2020-08
Mann Rd 0.50 over Tributary of Rocky Fork Creek (JEF-TR107-0.50) - Replacement of the existing concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work. ENG ESTIMATE - $542,650.62
06/30/2020 06:00 PM UTC
2020-04
Smothers at Harlem BMP Improvement Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road ENG ESTIMATE $112,827.48
06/23/2020 02:00 PM UTC
2020-06
Upgrading 11.140 miles of various sections of Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $ 2,379,923.89 ENG ESTIMATE W/ALTERNATE $ 2,691,250.29
05/19/2020 06:30 PM UTC
2020-05
Ridpath Rd 0.69 over Stanford Smith Ditch (JAC-TR270-0.69) - This project consists of upgrading 0.05 miles of Ridpath Road by replacing the existing bridge over Stanford Smith Ditch, providing new drainage structures, and minimal roadway approach improvements. ENGINEER ESTIMATE - $276,561.15
05/19/2020 06:00 PM UTC
2019-14
Reynoldsburg-New Albany Road at Clark State Road Improvements: Upgrading 0.34 miles of Reynoldsburg-New Albany Road and 0.19 miles of Clark State Road by constructing a modern roundabout at the intersection of Reynoldsburg-New Albany Road and Clark State Road. The project also includes the installation of a closed storm sewer system, waterline, street lighting, sidewalks, and various other improvements. ENG ESTIMATE $2,845,999.20
05/12/2020 02:00 PM UTC
2020-05
Ridpath Rd 0.69 over Stanford Smith Ditch (JAC-TR270-0.69) - This project consists of upgrading 0.05 miles of Ridpath Road by replacing the existing bridge over Stanford Smith Ditch, providing new drainage structures, and minimal roadway approach improvements. ENGINEER ESTIMATE - $237,810
04/28/2020 06:00 PM UTC
2019-18
Dublin-Granville Road over Rocky Fork Creek (FRA-CR546-12.90) Replacement and widening of the existing bridge over Rocky Fork Creek including the addition of a shared use path over the bridge and approximately 270 feet of shared use path along the south side of Dublin-Granville Road. ENG ESTIMATE - $1,196,999.83
04/07/2020 06:00 PM UTC
81 - 90 of 114 Solicitations
1 2 3 4 5 6 7 9 11 12