2025-09
Safe Routes To School 2022 (FRA-S. Western & Worthington), PID 117476 DBE Goal = 6% This project will add sidewalks and curb ramps with crosswalks to provide safer pedestrian access to Brookside Elementary, Franklin Heights High School, Stiles Elementary, and Worthington Elementary. Engineer's Estimate: $545,970.76
05/06/2025 02:00 PM UTC
2025-05
Harrisburg-Georgesville Rd. 2.83 over Big Darby Creek (FRA-CR3-2.83), PID 113471 DBE GOAL = 10% Rehabilitation of the Harrisburg-Georgesville Road bridge over Big Darby Creek between Opossum Run Road and London-Groveport Road by replacing the deck and arch fill and repairing the arches and spandrel walls. The rehabilitated structure will include the original decorative bridge railing detail and other incidentals necessary to complete the work. ENG ESTIMATE = $3,090,920.25
05/06/2025 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2021-08
Eureka Avenue, Valley View Drive, Highland Avenue & Harper Road Paved Shoulder Improvement Providing paved shoulder improvements for 0.05 miles along Eureka Avenue (CR65A), 0.19 miles along Valley View Drive (CR65), and 0.08 miles along Highland Avenue (CR65). An ADA shared use path crossing will be provided on both sides of Eureka Avenue at the Camp Chase Railroad. Additionally, the project includes drainage improvements and resurfacing. ENG ESTIMATE = $548,375.00
06/08/2021 02:00 PM UTC
2021-05
Borror Rd 0.11 over Tributary of Strader Ditch (JAC-TR266-0.11) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work. ENG ESTIMATE = $222,534.63 EBE Goal = 5%
05/20/2021 06:00 PM UTC
2021-10
2021 Franklin County Resurfacing program for upgrading 18.430 miles of various Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material ENG ESTIIMATE: $3,354,528.25
05/06/2021 06:00 PM UTC
2020-15
Ormond Avenue Drainage Improvement Part II - Rebuild drainage system along the south side of Ormond Avenue between Walford Street and Cleveland Avenue. Improve pedestrian access by adding sidewalk to provide a contiguous path between Walford Street and Cleveland Avenue. This project is the second part of drainage improvements which began with reconstruction of the north side in 2018. This project is funded through the Ohio Public Works Commission (OPWC) and matching fund participation from Clinton Township. ENGINEER'S ESTIMATE: $394,341.00
05/04/2021 06:00 PM UTC
2021-07
Toy Road, Swisher Road, Saltzgaber Road and Groveport Road Improvement Part 1 & 2 Groveport Road and Saltzgaber Road Improvements Part 1: The project involves a roadway widening plan for Groveport Road for approximately 0.34 miles and Saltzgaber Road for approximately 0.48 miles. The typical section for Saltzgaber Road will be 3 lanes with a two-way left turn lane along the majority of the alignment. Groveport Road widening includes an eastbound left and eastbound right turn lane along with a westbound left turn lane. The project will also improve drainage. Improvements of Toy Road, Swisher Road & Saltzgaber Road Part 2: Improve Toy Road with dual cul-de-sac east of the intersection of Centerpoint Parkway. Resurface the remaining Toy Road and Swisher Road and part of Saltzgaber Road with 1.5” asphalt overlay. Improve drainage and install traffic control items. ADD ENG ESTIMATE $2,739,346.17
04/06/2021 02:00 PM UTC
2020-16
Olentangy River Road Storm Sewer Improvement - This project consists of the installation of a storm sewer trunk that will alleviate drainage issues along the west side of Olentangy River Road, south of Crestway Drive and north of the existing culvert at Turkey Run. ENG ESTIMATE = $269,430.20
03/09/2021 07:00 PM UTC
2020-07
Refugee Rd 5.99 over Big Walnut Creek (MAD-C14-5.99) - Rehabilitation of the Refugee Rd over Big Walnut Creek Bridge by providing a new concrete sidewalk, new concrete barriers, and new exterior beams. Construction of 0.40 miles of shared use path and walk on a new alignment, including associated grading, drainage, and drive approaches. ENG ESTIMATE = $2,785,652.79 EBE Goal: 12%
01/20/2021 07:00 PM UTC
2020-12
Clark State Road and Longstreth Park Place Drainage Improvements Upgrading the storm sewer system within Longstreth Subdivision. $528,141.00
09/15/2020 06:00 PM UTC
2020-13
Murnan Road Drainage Improvement Drainage Improvements along Murnan Road from the intersection with Kuhlwein Road to approximately 1,900 feet south of the intersection. Improvements include minor grading to enhance roadside ditches to allow stormwater to drain to the approximately 5,200 linear feet of new storm sewer. $1,184,655.00
08/18/2020 06:30 PM UTC
2020-10
2020-21 General Drainage Maintenance Assist the Franklin County Drainage Engineer and the Franklin County Engineer with work to excavate, repair, replace and upgrade various on road and off road stormwater drainage systems in Franklin County. ENG ESTIMATE: $1,199,999.00
07/23/2020 06:00 PM UTC