General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Brad Foster, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2025-09
Safe Routes To School 2022 (FRA-S. Western & Worthington), PID 117476 DBE Goal = 6% This project will add sidewalks and curb ramps with crosswalks to provide safer pedestrian access to Brookside Elementary, Franklin Heights High School, Stiles Elementary, and Worthington Elementary. Engineer's Estimate: $545,970.76
05/06/2025 02:00 PM UTC
2025-05
Harrisburg-Georgesville Rd. 2.83 over Big Darby Creek (FRA-CR3-2.83), PID 113471 DBE GOAL = 10% Rehabilitation of the Harrisburg-Georgesville Road bridge over Big Darby Creek between Opossum Run Road and London-Groveport Road by replacing the deck and arch fill and repairing the arches and spandrel walls. The rehabilitated structure will include the original decorative bridge railing detail and other incidentals necessary to complete the work. ENG ESTIMATE = $3,090,920.25
05/06/2025 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2023-05
Elmore Avenue Sidewalk Improvements, EBE Goal = 6% Construction of 3, 615 feet of concrete sidewalk along the south side of Elmore Avenue, between Karl Road and Cleveland Avenue, along with associated work. Engineer's Estimate = $519,805.65
07/18/2023 02:00 PM UTC
2023-07
Plain Township Fire Station No. 121 Site Improvements This project includes the rehabilitation of the driveways, parking lots, and minor drainage improvements at the Plain Township Fire Station No. 121. The project is located at 9500 Johnstown Road, New Albany, Ohio 43054. ENGINEER'S ESTIMATE (BASE BID + HIGHEST ESTIMATED ALTERNATE) = $662,825.00 EBE Goal = 3%
07/12/2023 02:00 PM UTC
2023-08
Hayden Run Road 6.74 over Scioto River (NOR-CR32-6.74) - Resurfacing of the Hayden Run Road Bridge over the Scioto River. Includes the rehabilitation of the north parapet, extensions of downspouts, light pole replacement, and lane width reductions to accommodate the addition of a shared-use path. EBE Goal = 6% ENG ESTIMATE = $2,777,518.80
05/24/2023 02:00 PM UTC
2023-04
Reese Road 0.23 over Big Walnut Creek - PID 117472 Replacement of the existing bridge on Reese Road over Big Walnut Creek in Franklin County with a two-span prestressed I-beam bridge on semi-integral abutments. Project includes minor approach work on Reese Road consisting of grading, traffic control, drive apron replacement, and guardrail installation. Total project length is 350 feet. ENG EST = $2,755,352 DBE Goal = 10%
05/16/2023 02:00 PM UTC
2023-06
Upgrading various sections of Franklin County Township roadways, detailed within; with asphalt resurfacing and aggregate berm material. Engineer's Estimate $4,040,172.35
05/11/2023 02:00 PM UTC
2023-02
2023 - 2025 Guardrail Repair and Upgrade Program ENG ESTIMATE $467,626.50
04/18/2023 02:00 PM UTC
2023-03
2023 General Bridge Maintenance Contract: Substructure rehab and deck replacement on Grove City Road 2.98 over Hellbranch Run. Expansion joint repair on King Avenue 1.85 and Third Avenue 2.12 over Olentangy River and Gardner Road 3.55 over Big Darby Creek. Improvement of various other bridges. ENG ESTIMATE = $590,900
04/12/2023 02:00 PM UTC
2020-14 B
Cook Tri-County Ditch Drainage Improvement Project, Franklin County, Delaware County, Licking County. The purpose of this project is to replace the existing Cook Tile as part of a Ditch Petition. It includes constructing a closed storm sewer system along Fancher Road and installation of perforated drain tile through private agricultural fields. Additionally, the existing ditch from Johnstown Road will require rehabilitation. ENGINEER'S ESTIMATE = $376,751.72 *MAXIMUM ACCEPTABLE BID = $376,751.72
04/11/2023 06:00 PM UTC
2023-03
2023 General Bridge Maintenance Contract: Furnish and set box culverts on Pontius Road 2.26 over Muddy Run. Substructure rehab and deck replacement on Grove City Road 2.98 over Hellbranch Run. Expansion joint repair on King Avenue 1.85 and Third Avenue 2.12 over Olentangy River and Gardner Road 3.55 over Big Darby Creek. Improvement of various other bridges. ENG ESTIMATE = $590,900
03/23/2023 06:00 PM UTC
2020-14
Cook Tri-County Ditch Drainage Improvement Project, Franklin County, Delaware County, Licking County. The purpose of this project is to replace the existing Cook Tile as part of a Ditch Petition. It includes constructing a closed storm sewer system along Fancher Road and installation of perforated drain tile through private agricultural fields. Additionally, the existing ditch from Johnstown Road will require rehabilitation. ENGINEER'S ESTIMATE = $380,874.72 *MAXIMUM ACCEPTABLE BID = $380,874.72
03/07/2023 07:00 PM UTC
21 - 30 of 103 Solicitations
1 3 5 6 7 8 9 10 11