2025-09
Safe Routes To School 2022 (FRA-S. Western & Worthington), PID 117476 DBE Goal = 6% This project will add sidewalks and curb ramps with crosswalks to provide safer pedestrian access to Brookside Elementary, Franklin Heights High School, Stiles Elementary, and Worthington Elementary. Engineer's Estimate: $545,970.76
05/06/2025 02:00 PM UTC
2025-05
Harrisburg-Georgesville Rd. 2.83 over Big Darby Creek (FRA-CR3-2.83), PID 113471 DBE GOAL = 10% Rehabilitation of the Harrisburg-Georgesville Road bridge over Big Darby Creek between Opossum Run Road and London-Groveport Road by replacing the deck and arch fill and repairing the arches and spandrel walls. The rehabilitated structure will include the original decorative bridge railing detail and other incidentals necessary to complete the work. ENG ESTIMATE = $3,090,920.25
05/06/2025 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2022-10
2022 Franklin County Resurfacing Program upgrading 16.388 miles of various Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $5,392,059.95
05/12/2022 06:00 PM UTC
2022-03
Amlin Area Infrastructure Parts 1 & 2. EBE Goal 10%. Part 1: Improving 0.20 miles of Rings Road from Cosgray Road to the CSX Railroad tracks by installing new storm sewer, asphalt resurfacing, and sidewalk on the north side of the roadway. Part 2: Improving 0.28 miles of Rings Road from the CSX Railroad tracks to Churchman Road roundabout by installing new storm sewer, full depth asphalt, curb and gutter, sidewalks, street lighting, and street trees. New drainage and alley reconstruction is provided on the north side of Rings Road. The project will also replace the CSX at-grade railroad crossing to accommodate vehicles and pedestrians. ENGINEER'S ESTIMATE : $2,978,854.00
04/26/2022 02:00 PM UTC
2021-18
Elliott Road & Hayden Run Road Drainage Improvement Project Drainage improvements along Hayden Run Road and Elliott Road, including repairing and replacing failed drainage systems along the existing Joseph Carr Ditch (JCARR), and building 2.95 miles of new storm sewer and ditch on a new alignment. EBE GOAL: 8% ENG ESTIMATE: $3,346,843.80
04/05/2022 05:00 PM UTC
2022-06
Clark State Road Curve Improvement. EBE Goal: 6%. Improving 0.13 miles of Clark State Road by installing an outlet for existing roadside drainage, constructing a full depth pavement repair, and performing resurfacing and shoulder reconditioning. ENGINEER'S ESTIMATE: $171,210.00
04/05/2022 02:30 PM UTC
2022-01
Improvements of Fisher Road. EBE Goal: 7%. Milling/Resurfacing and widening of 0.16 miles of Fisher Road to add an eastbound right-turn lane and westbound left-turn lane for the Franklin County Correctional Facility. Work also includes curb and sidewalk. ENGINEER'S ESTIMATE $1,373,567.00
04/05/2022 02:00 PM UTC
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), Full Closure, PID 105741 - DBE Goal: 10% Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail). ENG ESTIMATE = $6,665,759.58
03/29/2022 06:00 PM UTC
2021-19
Winchester Pike 0.87 over Georges Creek (FRA-CR376-0.87), PID 105761, DBE Goal: 10% - Upgrading 0.04 miles of C.R. 376 (Winchester Pike) by replacement of an existing non-composite box beam bridge over Georges Creek with a continuously reinforced concrete slab bridge and minimal roadway approach work. ENG ESTIMATE = $1,486,838.36
03/15/2022 06:00 PM UTC
2021-21
Commerce Street, Vause Road, Canal Road Improvements: Improve Vause Road by installing a truck turnaround between the Norfolk Southern Railroad bridge and the CSX Railroad bridge. Improve the intersection of Vause Road and Canal Road with a widened pavement truck turnaround. EBE Goal 8% ENGINEER'S ESTIMATE: $453,442.00
02/08/2022 03:30 PM UTC
2021-24
Lockbourne Road & London-Groveport Road (SR 317) Roundabout: Upgrading 0.17 miles of London-Groveport Road (SR 317) and 0.17 miles of Lockbourne Road by constructing a single-lane roundabout. The project will improve drainage, pavement, signing, pavement markings and street lighting at the intersection. ENGINEER'S ESTIMATE: $2,050,518.00
02/08/2022 03:00 PM UTC
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), PID 105741 - DBE Goal: 10% Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail). ENG ESTIMATE = $5,429,368.46
01/06/2022 07:00 PM UTC