2021-16
Morse Road at Babbitt Road Roundabout Improvement: FRA-CR 17-11.80 PID 109494 DBE Goal 8% This project consists of the construction of a single lane modern roundabout at the intersection of Morse Road and Babbitt Road. The project will replace the existing bridge over Swisher County Ditch with a box culvert, enclosing Swisher County Ditch within the project limits. The project will also provide a new enclosed storm sewer system, new pedestrian facilities, new 16" waterline and new street lighting. ENG ESTIMATE: $4,105,826.26
11/30/2021 03:00 PM UTC
2021-11
This project will provide potable water to the Franklin County Engineer’s Office East Maintenance Facility at 4801 Hendron Road, Groveport, Ohio. This project will replace an existing well that currently services the site.
09/07/2021 06:00 PM UTC
FCTID-BID
The following is a notification of a project bidding on the Franklin County Transportation Improvement District Bid Express site. Please see attachment below and add notifications for upcoming FCTID projects. The project currently bidding on FCTID Bid Express site is: 2021-23 50 E. Mound Street Surface Parking Lot Engineer's Estimate: $691,457.85
08/05/2021 06:30 PM UTC
2021-20
Olentangy River Rd 11.40 over Carhart Ditch (SHA-CR9-11.40) & Olentangy River Rd 11.62 over Linworth Run (SHA-CR9-11.62) - At Carhart Ditch, upgrading 450 feet of Olentangy River Road buy providing the replacement of the existing bridge over Carhart Ditch (SHA-CR9-11.40), north of S.R. 161. At Linworth Run, replacement of the existing 3-sided culvert carrying Linworth Run under Olentangy River Road (SHA-CR9-11.62) just north of Whieldon Lane. The project includes additional roadway resurfacing quantities on either end of the project. ENG ESTIMATE = $1,409,587.72 EBE Goal = 8%
07/20/2021 06:00 PM UTC
2021-22
Combined Schleppi Road Drainage Improvement and Schleppi Road Bridge Replacement - Upgrading approximately 575' of storm sewer and replacing two drive culverts along Franklin County Road No. 191 (Schleppi Rd.) and the other incidentals necessary to complete the work. Replacement of the existing Schleppi 0.97 concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work. ENG ESTIMATE: $585,190.55 EBE Goal: 6%
07/13/2021 07:00 PM UTC
2021-04
Hoover Rd 2.04 over Tributary of Grant Run (JAC-CR262-2.04) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work. ENG ESTIMATE = $359,443.90 EBE Goal = 6%
07/13/2021 06:30 PM UTC
2021-15
Precast Box Culverts & Wingwalls for Olentangy 11.40 over Carhart Ditch and Olentangy 11.62 over Linworth Run - This bid consists of the fabrication and delivery of 36 linear feet of 12’x6’ precast concrete boxes and 126 linear feet of 12’x8’ precast concrete boxes. This bid also consists of the fabrication and delivery of precast wingwalls and headwalls for one of the culverts. All necessary materials to properly install the prefabricated systems shall be included. ENG ESTIMATE = $176,300
06/15/2021 06:00 PM UTC
2021-14
2021 Franklin County Township Resurfacing Program Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material. ENG. ESTIMATE $3,320,129.98
06/10/2021 06:00 PM UTC
2021-05
Borror Rd 0.11 over Tributary of Strader Ditch (JAC-TR266-0.11) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work. ENG ESTIMATE = $233,670 EBE Goal = 5%
06/08/2021 06:00 PM UTC
2021-08
Eureka Avenue, Valley View Drive, Highland Avenue & Harper Road Paved Shoulder Improvement Providing paved shoulder improvements for 0.05 miles along Eureka Avenue (CR65A), 0.19 miles along Valley View Drive (CR65), and 0.08 miles along Highland Avenue (CR65). An ADA shared use path crossing will be provided on both sides of Eureka Avenue at the Camp Chase Railroad. Additionally, the project includes drainage improvements and resurfacing. ENG ESTIMATE = $548,375.00
06/08/2021 02:00 PM UTC
41 - 50 of 92 Solicitations