Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Adam W. Fowler, P.E., P.S.
Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Adam W. Fowler, P.E., P.S.
Franklin County Engineer
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
2026-04
CDBG 2023 Chambers Rd and Westbrook Subdivision Improvements
Construction of 900 feet of concrete sidewalk along the north and south sides of Chambers Road, along with associated work. Construction of 4,100 feet of concrete sidewalk along both sides of the road within the western section of the Westbrook Subdivision, along with associated work.
ENG ESTIMATE = $1,334,493.75
A Pre-Bid conference will be held virtually via Microsoft Teams on Wednesday March 4, 2026, at 10:00 a.m. Meeting ID: 271 507 721 661 8 Passcode: rw7mv6JW
The plans, profiles, specifications, and estimates of quantities for doing this work are available through the www.bidexpress.com webservice for inspection by interested parties.
| 03/17/2026 02:00 PM UTC |
| Number | Deadline |
|---|---|
|
2022-14
Mobility Traffic Signals - Installing new signal installation at three intersections: Hilliard & Rome Road at Beacon Hill Road, Gantz Road at Dyer Road, and Pontius Road at Rohr Road.
EBE Goal 12%
ENGINEER'S ESTIMATE: $678,189.50
| 08/02/2022 02:30 PM UTC |
|
2022-04
Ferris Road at Walford Street Mini-Roundabout,
FRA-CR172-0.75, PID 113730,
DBE Goal 7%,
Upgrading 0.06 miles of Ferris Rd. and 0.06 miles of Walford St. by constructing a mini-roundabout that includes improved drainage, pedestrian facilities, and street lighting.
Engineer's Estimate = $636,532.00
| 06/16/2022 02:00 PM UTC |
|
2022-11
2022 Franklin County Township Resurfacing Program - upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material.
DBE Goal 6%
Engineer's Estimate $3,640,573.90
| 06/02/2022 06:00 PM UTC |
|
2022-08
Sunbury Rd 0.02 over Argyle-Woodland Run (MIF-CR8-0.02) - EBE goal 8%
Improvement of 0.03 miles of Sunbury Rd and rehabilitation of the existing bridge by replacement and widening of the existing concrete slab over a sandstone arch (to remain). The project will provide additional width for roadway and a future sidewalk along Sunbury Road and Woodward Avenue. Work also includes construction of a retaining wall, full depth pavement replacement, curb & gutter, and guardrail.
ENG ESTIMATE = $1,288,409.70
| 05/31/2022 06:00 PM UTC |
|
2022-10
2022 Franklin County Resurfacing Program upgrading 16.388 miles of various Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material.
ENG ESTIMATE $5,392,059.95
| 05/12/2022 06:00 PM UTC |
|
2022-03
Amlin Area Infrastructure Parts 1 & 2. EBE Goal 10%.
Part 1: Improving 0.20 miles of Rings Road from Cosgray Road to the CSX Railroad tracks by installing new storm sewer, asphalt resurfacing, and sidewalk on the north side of the roadway.
Part 2: Improving 0.28 miles of Rings Road from the CSX Railroad tracks to Churchman Road roundabout by installing new storm sewer, full depth asphalt, curb and gutter, sidewalks, street lighting, and street trees. New drainage and alley reconstruction is provided on the north side of Rings Road. The project will also replace the CSX at-grade railroad crossing to accommodate vehicles and pedestrians.
ENGINEER'S ESTIMATE : $2,978,854.00
| 04/26/2022 02:00 PM UTC |
|
2021-18
Elliott Road & Hayden Run Road Drainage Improvement Project
Drainage improvements along Hayden Run Road and Elliott Road, including repairing and replacing failed drainage systems along the existing Joseph Carr Ditch (JCARR), and building 2.95 miles of new storm sewer and ditch on a new alignment.
EBE GOAL: 8%
ENG ESTIMATE: $3,346,843.80
| 04/05/2022 05:00 PM UTC |
|
2022-06
Clark State Road Curve Improvement. EBE Goal: 6%.
Improving 0.13 miles of Clark State Road by installing an outlet for existing roadside drainage, constructing a full depth pavement repair, and performing resurfacing and shoulder reconditioning.
ENGINEER'S ESTIMATE: $171,210.00
| 04/05/2022 02:30 PM UTC |
|
2022-01
Improvements of Fisher Road. EBE Goal: 7%.
Milling/Resurfacing and widening of 0.16 miles of Fisher Road to add an eastbound right-turn lane and westbound left-turn lane for the Franklin County Correctional Facility. Work also includes curb and sidewalk.
ENGINEER'S ESTIMATE $1,373,567.00
| 04/05/2022 02:00 PM UTC |
|
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), Full Closure, PID 105741 -
DBE Goal: 10%
Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail).
ENG ESTIMATE = $6,665,759.58
| 03/29/2022 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.