The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-210336, Evans Lab - 3021/3023 Grad Rooms
Renovate approximately 752 SF of the third floor of Evans Lab, at 88 West 18th Avenue, Columbus, OH. The project scope includes the following Rooms on the Third Floor: 3021 and 3023. The scope of the project is to convert existing lab spaces into office areas to accommodate graduate student workspaces. The renovation will upgrade finishes, plumbing for a new coffee station with sink, minor alterations to HVAC throughout the project area, provide new lighting, and additional power as required to accommodate workstations. Alternate G-1 to provide and install new flooring, remove existing window coverings and provide and install new roller shades. Alternate H-1 to remove existing sheet metal cover and provide and install new finned tube cover.
| 11/22/2021 07:00 PM UTC |
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
| 11/17/2021 07:00 PM UTC |
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
| 11/10/2021 07:00 PM UTC |
OSU-210040, BSH - Thoracic Team Room
The project will consist of the construction of thoracic exam rooms, team rooms, general offices, CTPL lab space and associated fire protection, HVAC, plumbing and electrical work; located on the ground and second floors of the brain and spine hospital. Locations of work include the renovation of suite 214 for the new thoracic team room with a breakroom. Relocated phone triage in 049. Renovations of suite 234 to include (5) new exam rooms. Relocate the CPTL lab to the existing storage room in room 022 on the ground floor. Relocation of the CTO research staff offices to the existing conference room 087.
| 11/09/2021 07:00 PM UTC |
OSU-210254, Ross - 1st Floor Restrooms
Renovation of the existing public restrooms located on the first floor of Ross Heart Hospital, 452 West 10the Avenue in Columbus, Ohio. The project scope includes Rooms H1209T Women’s Restroom (255 SF), H1210T Men’s Restroom (198 SF), as well as the entry space located before each restroom (36 SF each). The scope of the renovations will upgrade finishes in the existing spaces identified above. Alternate G-1 is to replace the existing drinking fountain with new, along with panel screens so that it complies with ADA.
| 11/01/2021 06:00 PM UTC |
OSU-200234, Parks Hall - Suite 531 Renovation
OSU Main Campus: The Ohio State University, Parks Hall – Suite 531 Renovation. Work can be characterized best as “laboratory” renovations.
| 10/25/2021 06:00 PM UTC |
OSU-200104
OSU HVAC Replacements FY 2020
This project will renovate and update building HVAC systems in buildings constructed after 1999.
| 10/20/2021 06:00 PM UTC |
OSU-200666, Riffe-6th Floor Labs Renovation
OSU Main Campus - Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
| 10/13/2021 06:00 PM UTC |
OSU-210030, Outpatient Gahanna - Neurology Renovation
Renovation of approximately 2,470 square feet of tenant space of the Neurology Suite located at Outpatient Gahanna. The renovation is the conversion of an existing infusion space into exam rooms, team rooms, and support space.
| 10/12/2021 06:00 PM UTC |
OSU-210360, Sisson Domestic Water Loop
The Project consists of the installation of an 8-inch domestic cold waterline in the Sisson Hall parking lot that cross connects with the 20-inch OSU domestic cold waterline on the east side of Olentangy River Road. The line will be installed via a jack and bore method and will be connected to the existing OSU 20-inch OSU main domestic cold water line using a tapping sleeve per OSU BDS Division 33.
| 09/30/2021 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.