General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSU-210176. Arps Hall 168T, 178T and 180T Improvements
Renovate approximately 455 SF of toilet rooms on the first floor of Arps Hall located at 1945 N. High Street in Columbus, Ohio. The project scope includes Rooms 168T, and a combination of 178T and 180T. The scope of the renovations will reconfigure the existing toilet rooms identified above: to transform the current Women’s toilet room 168T into a new ADA compliant Multi-User Men’s Toilet Room and to combined Rooms of 178T a current Women’s toilet room and 180T a current Men’s toilet room into a new ADA compliant Multi-User Women’s Toilet Room. The existing janitor’s closet, Room 180J, will also be modified.
06/29/2021 06:00 PM UTC
OSU-200437, Howlett Hoop House Replacements (REBID)
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated June 3, 2021.
06/22/2021 06:00 PM UTC
OSU-200685, Wooster - Pathways & Civic Infrastructure Improvements
OSU Wooster: This project encompasses 3 individual sites that help to connect the CFAES Wooster campus to the Ohio Agricultural Research and Development Center and Agricultural Technical Institute. A proposed 5-foot concrete walk will connect the Skou parking lot to the ATI administration building (site 1) and will include grading, pavement removal, extension of existing storm pipe, addition of ADA ramps and landscape. A proposed 10-foot asphalt multi-use path will connect the residential area to both the Skou lot (site 2) and the new science building (site 3), this work will include pavement removal, grading, addition of a catch basin, addition of ADA ramps, and landscape.
06/09/2021 06:00 PM UTC
OSU-200279, CBEC - NMR Lab Safety Shield
The work consists of Enabling work for the installation of a 1.2 GHz NMR (magnet) in the existing basement NMR Lab, including: • Temporary removal of portions of the existing suspended ACT ceiling and light fixtures above the future NMR. • Installation of electromagnetic shielding on Unistrut above the future NMR. • Installation of a secondary lower layer of Unistrut to support relocated electrical conduit, junction boxes and ACT ceiling below the shielding. • Temporary removal of 2 doors and an overhead coiling door to allow for delivery and installation of the magnet (NMR) by others. • Installation of an access platform around the existing magnet once it is installed by others.
06/07/2021 06:00 PM UTC
OSU-200437, Howlett Hoop House Replacements
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated March 31, 2021.
05/11/2021 06:00 PM UTC
OSU-200518, Doan-Exterior Brick Repair
OSU Main Campus: The project includes repairs to the exterior brick masonry façade at the east end of the north elevation of Doan Hall. The masonry repairs include the replacement of the through-wall flashing at shelf angles/lintels, isolated shelf angle replacement, brick masonry replacement at isolated distress, installation of brick masonry infill at former air conditioning units, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent. Additionally, the project includes installation of new storm windows at operable portions of the existing windows. The work is divided into 2 phases presented as follows: Base Bid – Phase 1: West Alternate 1 – Phase 2: Central
04/27/2021 06:00 PM UTC
OSU-200604, Wooster - Selby Hall Elevator Replacement (Rebid)
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
04/21/2021 06:00 PM UTC
OSU-200548, MMP Tower HVAC Plan - REBID
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
04/15/2021 06:00 PM UTC
OSU-200104 HVAC Replacements FY 2020
RPAC/PEAS/McCorkle: Update Siemens Controls Knowlton Hall: Update Siemens Controls Davis Heart and Lung: Delta Controls Replacements Parker Food Science and Technology: Delta Controls Replacements Veterinary Med Academic: Delta Controls Replacements Scott Laboratory: Delta Laboratory Controls Replacement
04/09/2021 05:00 PM UTC
OSU-200548, MMP Tower HVAC Plan
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
03/26/2021 06:00 PM UTC
221 - 230 of 552 Solicitations
1 2 19 20 21 23 25 26 27 55 56