General Info

Business Logo

City of Hilliard, Ohio

3800 Municipal Way, Hilliard, OH 43026
(614) 876-7361

As an important part of the growing Columbus Region, the City of Hilliard balances friendly, small-town living and big-city opportunities. With a population of nearly 38,000, Hilliard’s median household income is $97,485. There are approximately 1,100 companies in Hilliard that employ an estimated 17,000 people and contribute to more than one billion dollars in estimated annual sales.

Rated number one for job, population, wage and GDP growth in the Midwest, the Columbus Region offers access to a growing potential workforce of one million people and unique opportunities for any developing company. Hilliard is conveniently located along I-270 with easy access to I-70 and I-71, and is only 20 miles to the John Glenn International Airport.

No matter the industry, developing in Hilliard promises strong economic value, a rich work life balance and — most of all — an excellent place to call home.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2024 Sanitary Sewer Cleaning and CCTV Program (CIP S-33)
**Notice: Addendum No. 2 was issued on 11/5/2024. ** **Notice: Addendum No. 1 was issued on 11/1/2024. ** The 2024 Sanitary Sewer Cleaning and CCTV Program (CIP S-33) (the “Project”) consists of a Base Bid for cleaning and televising 31,673 LF of sanitary sewer in the City of Hilliard, Ohio ranging from 8-inch to 15-inch diameter. These sewers are located in the residential neighborhoods of Brookfield Village and Hyde Park, and were constructed between 1986 and 1999. Sanitary sewers are located predominantly in rear yard easements, with some sewers located along public street right of way. Heavy cleaning may be required in approximately 20-percent of the sewers. Traffic control may be required to perform work in some areas. The Engineer's Estimate for the Base Bid is $207,900.00. No bid will be awarded if it exceeds the Engineer’s Estimate for the Base Bid by more than ten percent (10%). THE PROJECT WILL BE AWARDED BASED UPON THE BASE BID AMOUNT. THIS PROJECT IS EXEMPT FROM PREVAILING WAGE REQUIREMENTS. The Substantial Completion Date is May 30, 2025. The Final Completion Date is June 27, 2025. Please review the "Information for Bidders" in the Attachment List for additional information.
11/08/2024 07:00 PM UTC
CIP S-37 2024 Sanitary Sewer CIPP Lining Project
**Notice: Addendum No. 1 was issued on 11/1/2024. ** The 2024 Sanitary Sewer CIPP Lining Project (CIP S-37) consists of cleaning, televising, and CIPP lining of 8-inch and 10-inch sanitary sewer. The Base Bid includes approximately 933 linear feet of 8-inch sewer along Columbia Street and an alley in the Old Hilliard area of the City, as well as 1,571 linear feel of 10-inch sewer located along Norwich Street in Old Hilliard. The sewer in Alternate #1 includes approximately 381 linear feet of sewer located in Old Hilliard along Columbia Street. By-pass pumping will be required to install the liner. Traffic control will be required to maintain traffic, particularly along Norwich Street. The original as-built plans for the sanitary sewers to be lined in both the Base Bid and Alternate #1 are included as pages from plan P-0001 in the Construction Drawings in the Attachment List. The Engineer's Estimate for the Base Bid is $162,500. No bid will be accepted if it exceeds the City Engineer’s estimate on the Base Bid by more than ten percent (10%). THE PROJECT WILL BE AWARDED ON THE BASE BID AMOUNT. The Substantial Completion Date is May 2, 2025. The Final Completion Date is May 30, 2025. Please review the "Information for Bidders" in the Attachment List for additional information.
11/07/2024 07:00 PM UTC
Schirtzinger Road Sidewalk Improvements (T-133)
This project consists of adding a 5' sidewalk along the west side of Schirtzinger Road, a crossing at the intersection of Schirtzinger Road and Dayspring Drive, and a crossing at the intersection of Schirtzinger Road and River Crossing Drive. The Engineer's Estimate for this Bid is $138,000.00. No bid will be accepted if it exceeds the City Engineer’s estimate on the bid by more than ten percent (10%). The Final Completion Date is May 31, 2025. This project is being funded through local funds. State prevailing wage applies to this project. There is no DBE goal. Please review the "Information for Bidders" in the Attachment List for additional information.
10/31/2024 07:00 PM UTC
City of Hilliard, Safety Services Building Locker Room Renovation Rebid
The Engineer's Estimate for this Bid is $330,000. No bid will be accepted if it exceeds the City Engineer's estimate on the base bid by more than ten percent (10%). An award of the Project will be based solely on the base bid, without consideration of the Alternates, which the City may or may not award. The Substantial Completion Date is 4/30/2025. The Final Completion Date is 5/23/2025. Please review the "Information for Bidders" in the Attached List for Additional information.
08/27/2024 05:00 PM UTC
2024 Hilliard Trail Maintenance Program (CIP T-161)
2024 Hilliard Trail Maintenance Program (CIP-T-161) consists of performing maintenance on various trails throughout the City of Hilliard including crack sealing, sealcoating, and spot pavement repairs. The Engineer's Estimate for this Bid is $159,300.00. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). The Final Completion Date is May 2, 2025. Please review the "Information for Bidders" in the Attachment List for additional information.
08/15/2024 07:00 PM UTC
RFQ 311
Brief Description of Project: The City of Hilliard is currently seeking to replace or upgrade its current Asset Management System (AMS) and acquire the following primary functionality: Assets, Work Orders, Reporting, Mobility, Inventory, Service Request. Project Scope Proposals are being sought through this RFQ for a project that includes acquisition of: • Inventory Capabilities (i.e., Inventory Tracking, Inventory Quantity, Low Inventory Alerts, Inventory Calculation, Smart Inventory Counts, Barcoding, Reporting) • Work Order Capabilities (i.e., Work Order Process and Forms, Job Assignment, Labor Rates, Materials Used, Work Order Calculations) • Asset Management Capabilities (i.e., Ownership, Economic Value, Reporting, Asset Tracking, Processing, GIS) • Integrated and Robust Online Customer Service Request Capabilities • Mobile Work Order Software (Apple compatible) • System Integration Services • Interfaces to Certain City Systems • Workflow mapping • Training, including organizational change management, robust ongoing training. • Maintenance Services. NOTE COMPLETE RFQ IN ATTACHMENTS Responses are due ____08/08/2024 03:00 PM_______.
08/08/2024 07:00 PM UTC
City of Hilliard, Safety Services Building
Enter Description of Project. The Engineer's Estimate for this Bid is $_____208,000______. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). An award of the Project will be based solely on the base bid, without consideration of the Alternates, which the City may or may not award. The Substantial Completion Date is ____1/6/2025______. The Final Completion Date is ____2/3/2025_______. Please review the "Information for Bidders" in the Attachment List for additional information.
06/19/2024 05:00 PM UTC
Hilliard Traffic Signal Maintenance Projects 2024 (CIP T-154)
***NOTICE: Addendum No. 1 was issued on 6/6/2024*** This project consists of traffic signal maintenance activities at four intersections in the City of Hilliard. The locations and scope of work are summarized below. Detailed plans and specifications of work are provided in the attachment list below. Cemetery Road/Britton Parkway and Cemetery Road/Lyman Drive: Signal re-wiring (vehicle heads, ped heads and ped pushbuttons), removal of un-used loop detector lead-in and radar detection wiring, installation of three (3) new vehicle signal heads, and signal phasing changes. See sheets 1 – 4 of the Plans & Specifications. Cemetery Road/Leap Road: Signal re-wiring (vehicle heads only), removal of un-used loop detector lead-in and radar detection wiring, and installation of twelve (12) new vehicle signal heads. See sheet 5 of the Plans & Specifications. Dublin Road/Davidson Road: Signal re-wiring (vehicle heads, ped heads and ped pushbuttons), installation of seven (7) new vehicle head (provided by the City), installation of new pedestrian signal heads and APS push buttons, and installation of a new pole-mounted traffic signal cabinet. See sheets 6 – 7 of the Plans & Specifications. Bidders shall note the MOT requirements for each intersection included in the plans and specifications. The Engineer's Estimate for this Bid is $153,000. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). The Final Completion Date is November 15, 2024. Extension of this completion date may be approved in the event of a documented supply chain material delay, and the extension will be granted only for the work items related to the material delay. Please review the "Information for Bidders" in the Attachment List for additional information. Prevailing Wage requirements apply for this Project.
06/18/2024 06:00 PM UTC
2024 Hilliard Sidewalk Maintenance Program (CIP T-160)
The 2024 Hilliard Sidewalk Maintenance Program consists of the removal and replacement of various sidewalk panels to meet ADA requirements and City Code. Base bid -Items 1-10 Alternate Bid #1 Items 11-17 Alternate Bid #2 Items 18-24 The Engineer's Estimate for this Bid is $945,450.00. This estimate does not include the alternate bids. No bid will be accepted if it exceeds the City Engineer’s estimate on the base bid by more than ten percent (10%). An award of the Project will be based solely on the base bid, without consideration of the Alternates, which the city may or may not award. The Final Completion Date is October 4, 2024. Please review the "Information for Bidders" in the Attachment List for additional information.
03/08/2024 08:00 PM UTC
2024 Hilliard Street Maintenance & Rehabilitation Program (CIP T-121)
***NOTICE: Addendum No. 1 was issued on 1/22/2024*** The 2024 City of Hilliard Street Maintenance & Rehabilitation Program (SMRP) consists of mill and asphalt concrete overlay, microsurfacing, pavement repairs (partial and full depth), pavement marking, curb and gutter repair, sidewalk repair, and ADA-compliant curb ramps. A Location Map is provided showing the location and scope of work. Items 1-46 in the Bid Schedule relate to the pavement maintenance work. Also included as part of this bid: 1. Davidson Road Crosswalk Improvements which include adding pedestrian crossings, improvements to existing crossings, microsurfacing, pavement markings and ADA curb ramp repairs. Items 47-92 in the Bid Schedule relate to the crosswalk improvements. 2. Britton Parkway/Davidson Road Roundabout Improvements which includes constructing an island protected crosswalk, modifications to splitter islands and existing crosswalks, planing and resurfacing, installation of raised crosswalks and pavement marking. Items 93-141 in the Bid Schedule relate to the roundabout improvements. Final plans will be distributed at the pre-construction meeting. 3. Municipal Park Paving Project which consists of milling and resurfacing parking lots and trails, pavement markings, and signs & parking blocks. Items 142- 163. Alternate Bid - Items 164-191 The Engineer's Estimate for this combined bid is $3,855,000. This estimate does not include the alternate bid. No bid will be accepted if it exceeds the City Engineer’s estimate by more than ten percent (10%). The Substantial Completion Date for work located with a school zone is August 14, 2024. The Final Completion Date is October 25, 2024. Please review the "Information for Bidders" in the Attachment List for additional information.
01/26/2024 06:00 PM UTC
21 - 30 of 78 Solicitations
1 3 5 6 7 8