St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
| 11/05/2025 08:00 PM UTC |
|
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
| 11/12/2025 08:00 PM UTC |
|
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads:
- Cours Carson St, Mandeville, LA;
- Debellvue Pl, Mandeville, LA;
- Joans St, Mandeville, LA;
-Kramer Ct, Mandeville, LA;
-Pecan Pass, Mandeville, LA; and
- Rosedown Way, Mandeville, LA.
| 11/13/2025 08:00 PM UTC |
|
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
| 11/18/2025 08:00 PM UTC |
|
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
| 11/20/2025 08:00 PM UTC |
|
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
| 11/20/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041);
Mandeville, Louisiana, 70448.
| 06/25/2025 07:00 PM UTC |
|
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
| 06/24/2025 07:00 PM UTC |
|
25-37-1
DPW Fritchie Barn Door Replacement 2025------The Parish requires a Contractor to remove and replace two steel roll up doors located at Fritchie Barn at 63119 Highway 1090 in Pearl River, Louisiana.
| 06/17/2025 07:00 PM UTC |
|
25-38-1
Shady Oaks Dr Drainage---------------The Parish requests a Contractor to improve and restore drainage by removing and replacing storm drain pipes and removing and replacing driveways and ditches along Shady Oaks Dr, Covington, LA., as required in the specifications.
| 06/17/2025 07:00 PM UTC |
|
25-35-1
Area 3 Concrete Maintenance-----------------The Parish requests a Contractor to improve roadways by removing/replacing concrete panels and concrete barriers/rollover curbs as specified in the specifications on Devonshire Dr. (R08V039), Slidell, LA; Hampton Ln. (R08V042), Slidell, LA; Maple Cir. (R08I044) Slidel,l LA; Tiffany St. (R08V024) Slidell, LA.
| 06/11/2025 07:00 PM UTC |
|
25-17-2
2025 District 1,2,3,5 Road Improvements-----------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified at the various locations:
- Crater Lake Dr. (R01E006), Covington;
- Shady Lake Dr. (R01E016), Covington;
- B St. (R03L039), Covington;
- Edna St. (R03K072), Covington;
- N 3rd St. (R03K017), Covington;
- Progress St. (R10D017), Covington;
- Booth Rd. Ph. 2 (R02J006), Folsom;
- Boyd Rd. Ph 2. (R01B002), Covington;
- Rolling Hills Blvd. (R02H015), Folsom ;
- Stoney Ct. (R02J006), Folsom;
- Valley Ct. (R02K023), Folsom; and
- Henry E Meiners Rd. (R04E079), Mandeville.
| 06/10/2025 07:00 PM UTC |
|
25-34-1
Chess Dr Drainage--------------The Parish requests a Contractor to improve drainage by removing/replacing catch basin and removing/replacing concrete sidewalk as specified along Chess Dr. (R08I070) Slidell LA as required in the specifications.
| 06/10/2025 07:00 PM UTC |
|
25-36-1
Barrymore St & Stanton Ln Drainage-------The Parish requires a qualified contractor to perform drainage improvements along Barrymore Street (R08V037) and Stanton Lane (R09A030) in Slidell, Louisiana. The work will include the removal and replacement of concrete panels and driveways, resealing catch basins, and cleaning, repairing, and resealing pipe joints. All work will be conducted in accordance with the project
specifications.
| 06/05/2025 07:00 PM UTC |
|
25-15-2
Safe Haven Cardinal Cove Cabin Renovations - Phase 1------ This work includes selective demolition of buildings and walkways, hazardous materials abatement, roof and siding replacement, and structural repairs to walkway and Living Unit roof structures.
| 06/04/2025 07:00 PM UTC |
|
25-29-1
Southdown Tallow Creek Subdivisions Sinkhole Repair-----The Parish requests a Contractor to improve drainage by cleaning, sealing pipe joints and catch basins on Cole Ct. (R01C033); Southdown Ln. (R01K017); Silverthorne Ln. (R01K020) and Tallow Creek Blvd. (R01C027) located in Covington, Louisiana.
| 06/03/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.