General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-16-2
Rosedown Way Drainage Phase 2-------------- The Contractor shall provide all labor, equipment, tools, testing, and materials necessary to complete drainage improvements in accordance with the construction plans and specifications for the Rosedown Subdivision, located in Mandeville, Louisiana, 70471. The work includes replacement of existing drainage infrastructure along Camden Court, construction of a new concrete-lined channel to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all incidental work, such as replacement of concrete street panels, sidewalks, and driveways, utility relocations, installation of sewer and water conflict boxes, and placement of rip rap at the outfall.
04/14/2026 07:00 PM UTC
26-18-2
2026 District 7 Road Improvements------------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
04/14/2026 07:00 PM UTC
26-19-2
2026 District 2, 3 Road Improvements---------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
04/14/2026 07:00 PM UTC
26-22-2
Emergency Fuel Services-------------------------- The St. Tammany Parish Government (Parish) is seeking a qualified vendor to establish a standby contract for emergency fuel supply and distribution services to be utilized during declared emergency events.
04/21/2026 07:00 PM UTC
26-21-2
2026 District 6, 8, 9 Road Improvements------ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along various District 6, 8, and 9 Parish roads.
04/28/2026 07:00 PM UTC
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
05/05/2026 07:00 PM UTC
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
05/14/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
25-29-1
Southdown Tallow Creek Subdivisions Sinkhole Repair-----The Parish requests a Contractor to improve drainage by cleaning, sealing pipe joints and catch basins on Cole Ct. (R01C033); Southdown Ln. (R01K017); Silverthorne Ln. (R01K020) and Tallow Creek Blvd. (R01C027) located in Covington, Louisiana.
06/03/2025 07:00 PM UTC
25-31-1
Cross Gates Blvd Repair-----The Parish requests a Contractor to improve roadway by milling and overlaying, and patching various sections of road surface along Cross Gates Blvd, Slidell, LA as required in the specifications.
06/03/2025 07:00 PM UTC
25-33-1
Amber St. Drainage----The Parish requires a contractor to perform drainage improvements by cleaning, repairing, and resealing pipe joints, rebuilding and resealing catch basins along Amber St (R08L007), Slidell, LA, as required in the specifications.
06/03/2025 07:00 PM UTC
25-25-1
Pearl River Diversion Canal Stabilization----The purpose of this project is to install erosion control measures within an area at the end of the Pearl River Diversion Canal that was disturbed from previous dredging operations. These measures include hydroseeding, erosion control matting, and tree planting.
05/29/2025 07:00 PM UTC
25-32-1
Blue Crane No 1 Dr Drainage----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvements by removing and replacing drainage culverts and resealing catch basins as specified along Blue Crane No. 1 Dr (R08N040), Slidell, LA. The time period for completion of the project is thirty (30) calendar days.
05/29/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/28/2025 07:00 PM UTC
25-30-1
Electrical Services- Trace Loop and Koop Drive--------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to provide electrical service at 21454 Koop Dr, Mandeville, LA 70471.
05/28/2025 07:00 PM UTC
25-14-2
Official Journal ----The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/06/2025 07:00 PM UTC
25-26-1
Lake Erie Dr Drainage -------The Parish requests a contractor to repair/replace/reseal existing structure(s) to restore area drainage by repair/replace/reseal drain pipe, catch basin, and sod, as specified along Lake Erie Dr (R08L056); located in Slidell, Louisiana.
05/06/2025 07:00 PM UTC
25-5-2
Pinnacle Parkway------------------------------------------------The work specified in this project will require the contractor to provide the labor, equipment, and materials necessary to improve the roadway surface along Pinnacle Parkway (R01D020) Section 47, Township 7S Range 11E, Mandeville, LA.
04/30/2025 07:00 PM UTC
81 - 90 of 955 Solicitations
1 2 5 6 7 9 11 12 13 95 96