General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-30-2
2026 Parishwide Striping--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to provide and install thermoplastic striping as specified along the following Parish roads: • Palm Blvd (R03I003) in Covington ; • Branch Crossing Dr (R03H018) in Covington ; • Dogwood Ln (R03I012) in Covington ; • Lake Ramsey Rd (R03D012) in Covington ; • Viola St (R04E070) in Mandeville ; • Lacombe Harbor Rd (R07H028) in Lacombe ; • E. Violet St (R07C112) in Lacombe ; • Rapatel St (R04E025) in Mandeville ; • Lonesome Rd (R04D032) in Mandeville ; • Pleasant Dr (R09C019) in Slidell ; • Camp Villere Rd (R09D012) in Slidell ; • Dixie Ranch Rd (R09C033) in Slidell ; • Garden Dr (R09G051) in Slidell ; • Liberty Dr (R09G047) in Slidell ; • Brookter St (R08V008) in Slidell ; • N. 3rd Ave (R08J006) in Slidell ; • Lake Village Blvd (R08L026) in Slidell ; and • Tammany Trace (R11A001) various locations.
06/17/2026 07:00 PM UTC
26-17-1
Tammany Trace Solar Pedestrian Activation System Replacement----------St. Tammany Parish Government is requesting a Contractor to provide and install the LightGuard Solar System or an approved equal. The Contractor shall provide all labor, materials, and equipment necessary to remove existing solar pedestrian crossing systems and install new solar-powered pedestrian activation systems at designated locations along the Tammany Trace.
06/17/2026 07:00 PM UTC
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
25-40-2
Sodium Bisulfite Bulk Delivery---- St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking a Vendor for the supply and delivery of Sodium Bisulfite NaHSO3 (Liquid 40% Solution-Dechlorination) for multiple Wastewater Treatment Facilities located throughout St. Tammany Parish. The awarded contract is on a unit price "as needed" basis according to the specifications provided. DU reserves the right to order Sodium Bisulfite NaHSO3 (Liquid 40% Solution-Dechlorination) at any time during the year and in any quantity, with no minimum order. Each facility has been issued a Louisiana Pollutant Discharge Elimination System (LPDES) permit by the Louisiana Department of Environmental Quality (LDEQ). DU is required to monitor and comply in accordance with these permits.
01/28/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/21/2026 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/15/2026 08:00 PM UTC
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-66-1
Chris Kennedy Rd Drainage/Murray Rd Loop ----------------------------------The Parish requests a contractor to improve drainage by removing and replacing driveway culverts and subsurface drainage along Murray Rd Loop in Pearl River, LA, benefiting the Chris Kennedy Lateral, as specified in the project documents.
12/09/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
41 - 50 of 976 Solicitations