General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-21-1
Woodridge Blvd Drainage ------------The Parish requests a contractor to improve drainage by installing catch basins into sub-surface located on Woodridge Blvd (R04C004); in Mandeville, Louisiana.
04/02/2025 07:00 PM UTC
25-8-2
Berry Todd Rd & N Dixie Ranch Rd----The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surfaces by milling and overlaying approximately 21,500 total feet of asphaltic concrete and installing roadway striping, as specified along Berry Todd Rd (R07C002) Section 19/43/39/29/28, Township 8S, Range 13E, and N Dixie Ranch Rd (R07B004) Section 16-17, Township 8S, Range 13E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is forty-five (45) days from issuance of Notice to Proceed by the Parish.
04/01/2025 07:00 PM UTC
25-9-2
2025 District Panel Replacements---------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along Maison Dr (R01K015) Covington ; Bluefield Dr (R08I061)Slidell ; Kelly Dr (R08I005) Slidell ; Kris Dr (R08I006) Slidell ; Northwood Dr (R08I030) Slidell ; Timbers Dr (R08I043) Slidell ; Autumn Wind Ln (R04F063) Mandeville ; Brandon Dr (R08P030) Slidell ; West End Blvd (R09J110) Slidell.
04/01/2025 07:00 PM UTC
25-18-1
Sycamore Dr Turn Radius----The parish requests a contractor to improve the turning radius at the first part of the s-curve by installing subsurface drainage, catch basins, patching and shoulder material as specified
03/13/2025 07:00 PM UTC
25-19-1
Huntwyck Village Sidewalks------The Parish requests a contractor to improve sidewalks at various locations as specified along Drury Ln (R09G037) Slidell; Holmes Dr (R09G040) Slidell; Portsmouth Dr (R09G039) Slidell; Queen Anne Dr (R09G038) Slidell; Raleigh Dr (R09G036) Slidell; Westminster Dr (R09G033) Slidell ; Louisiana.
03/13/2025 07:00 PM UTC
25-20-1
7th St. Road Improvement-------------------------------The Parish requests a contractor to improve road surfaces by patching and overlay on 7th St., Mandeville, LA.,
03/13/2025 07:00 PM UTC
25-14-1
Adele Ln Sinkhole Repairs -----------The Parish requests a contractor to improve drainage by re-grouting catch basin, wrap pipe joint, remove/replace concrete driveway apron located on Adele Ln (R09A028); in Slidell, Louisiana.
03/12/2025 07:00 PM UTC
25-10-2
Excavator-----------------------The Parish extends this MATERIAL ONLY bid request to procure an Excavator. This equipment shall be a new piece of equipment. The Excavator will be procured for the Public Works Department.
03/12/2025 07:00 PM UTC
25-15-1
Browns Village Rd---------------------------------------------------------------------------The Parish requests a Contractor to improve the roadway by installing subsurface and patching road surface as specified on Browns Village Rd, in Slidell, LA.
03/12/2025 07:00 PM UTC
25-4-2
2025 District 7,9,12,13 Road Improvements ---- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: • Alberu Dr (R09G060) Slidell; • Bar St (R08M055) Slidell; • Buck Dr (R06H033) Pearl River; • Clara Dr (R09J006) Slidell; • Dogwood Dr (R07C067) Lacombe; • E Ruth Rd (R07H103) Lacombe; • Hemlock Dr (R06G021) Pearl River; • Jacqueline Dr (R09J003) Slidell; • LA Industries Pit Rd (R06F003) Pearl River; • Tulip Dr (R08F124) Section 30 Township 8S Range 15E Slidell; and • Yaupon Dr (R08M033) Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
03/11/2025 07:00 PM UTC
71 - 80 of 932 Solicitations
1 2 3 4 5 6 8 10 11 12 93 94