Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
24-34-1
Lenel Rd Drainage------------------------------------------------------------The Parish requests a contractor to improve drainage located on Lenel Rd (R010C007) Section 17 Township 6S Range 12E; in Bush, Louisiana.
| 08/14/2024 07:00 PM UTC |
24-32-1
E. Cherrywood Ln Drainage-------------------------------------------------The Parish requests a contractor to remove/replace storm drain pipe/catch basin/concrete driveway, to improve area drainage at locations identified on E Cherrywood Ln (R08A053) Section 14 Township 8S Range 14E, in Pearl River, Louisiana, 70452
| 08/14/2024 07:00 PM UTC |
24-37-1
Arrow Wood Pond Drainage ---- The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to install pond valves, backfill and fencing at the Arrow Wood Pond lateral (D03LW01154) Section 1 Township 7S Range 11E located in Abita Springs, LA, as per the specifications.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is twenty-one (21) calendar days from the issuance of the Notice to Proceed (NTP) issued by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 08/14/2024 07:00 PM UTC |
24-29-2
Davis Canal Restoration----------------------------------------------------Dredging and sheet pile installation at the Davis Landing Canal at the intersection
of the West Pearl River in Pearl River, Louisiana.
| 08/13/2024 07:00 PM UTC |
24-30-1
Snead Dr Panels------------------------------------------------------------The Parish requests a contractor to remove, replace and/or repair concrete panels and concrete rollover/barrier curbs, along Snead Dr (R06O017) Section 25 Township 6S Range 12E; Abita Springs, Louisiana.
| 08/13/2024 07:00 PM UTC |
24-26-1
Steele Rd Drainage------ The Parish requires a Contractor to install new subsurface pipe to improve drainage, on Steele Rd (D08NW01012; S38-T9S-R15E) located in Slidell, Louisiana.
| 08/13/2024 07:00 PM UTC |
24-31-1
Toulouse St. - The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to repair sinkholes and eroded pipe, along Toulouse St (R08H016) Section 36 Township 8S Range 14E Slidell, Louisiana.
| 08/07/2024 07:00 PM UTC |
24-33-1
River Rd Drainage ------ The Parish requests a contractor to improve drainage by installing a catch basin and sub-surface drainage located at River Rd (R03H001) Section 17 Township 6S Range 11E; Covington, Louisiana.
| 08/07/2024 07:00 PM UTC |
24-25-2
24-26-2 - Moonraker Dr Drainage --------- All labor and materials necessary to line existing 18” and 24”culverts with Cured in Place Pipe (CIPP). Work shall occur at the locations noted on the attached drawings. All work shall be done in accordance with the manufacturer’s installation procedures and recommendations. All debris shall be removed at no direct pay
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of work is one hundred twenty (120) calendar days from the issuance of Notice to Proceed (NTP) by the Parish.
| 08/06/2024 07:00 PM UTC |
24-24-1
Library People Counter Devices - Provide and install Library people counter devices in 12 locations to eliminate the need for manual counts.