General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-6-2
2026 District 12, 13, 14 Road Improvements-----------------The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along various Parish roads.
03/10/2026 07:00 PM UTC
26-12-2
2026 District 1, 4 Road Improvements----------------------------- The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying and patching road surfaces as specified along various Parish roads.
03/10/2026 07:00 PM UTC
26-15-2
Emergency Fuel Services
03/17/2026 07:00 PM UTC
26-11-2
Tammany Trace Bridge #24--------------------------------------------------The work to be included under this contract shall consist of furnishing all labor, materials, equipment, tools, supervision, and incidentals necessary for the removal and replacement of the existing bridge structure, earthwork and path base, relocation of existing drainage ditches, installation of concrete and asphalt paving, fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
03/24/2026 07:00 PM UTC
26-14-2
2026 District Panel Replacements-----------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and/or replacing concrete panels, concrete barriers, rollover curbs, curbs, and gutters as specified along the following Parish roads: - Kepler Lake Ct (R08L055) Slidell, LA; -Lake Michigan Dr (R08L050) Slidell, LA; - Lake Village Blvd (R08L026) Slidell, LA; - W Forest Dr (R08I034) Slidell, LA; - Willow Cir (R08I045) Slidell, LA; - Greenleaves Blvd (R04O060) Mandeville, LA; - Alisa Dr (R09A033) Slidell, LA; - Clearpoint Dr (R09A024) Slidell, LA; - Madeline Ln (R09A063) Slidell, LA; - MCH Rd (R04F064) Mandeville, LA; - Willow Wood Dr (R08M060) Slidell, LA; - Silverwood Dr (R08M062) Slidell, LA; - Goldenwood Dr (R08M061) Slidell, LA; - Larchwood Dr (R08M073) Slidell, LA; - Elizabeth Dr (R09G044) Slidell, LA; - Queen Anne Dr (R09G038) Slidell, LA; - Westminster Dr (R09G033) Slidell, LA; - Trafalgar St (R08V029) Slidell, LA; - Tumblebrook St (R08V025) Slidell, LA; - Foxcroft St (R08V019) Slidell, LA; - Almond Creek Rd (R08V021) Slidell, LA; and - Brookter St (R08V108) Slidell, LA.
03/24/2026 07:00 PM UTC
26-16-2
Rosedown Way Drainage Phase 2-------------- The Contractor shall provide all labor, equipment, tools, testing, and materials necessary to complete drainage improvements in accordance with the construction plans and specifications for the Rosedown Subdivision, located in Mandeville, Louisiana, 70471. The work includes replacement of existing drainage infrastructure along Camden Court, construction of a new concrete-lined channel to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all incidental work, such as replacement of concrete street panels, sidewalks, and driveways, utility relocations, installation of sewer and water conflict boxes, and placement of rip rap at the outfall.
03/31/2026 07:00 PM UTC
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
04/01/2026 07:00 PM UTC
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
04/08/2026 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
305-00-16-10-2
2015 District 5 Road Improvements
04/04/2016 07:00 PM UTC
404-40-16-11-2
Statewide Generator Program
03/29/2016 07:00 PM UTC
306-00-16-06-2
2015 District 6 Road Improvements
03/23/2016 07:00 PM UTC
306-00-16-07-2
2016 District 6 Road Improvements
03/22/2016 07:00 PM UTC
010-07-16-12-2
Annual Coffee Services
03/18/2016 07:00 PM UTC
010-95-16-09-2
2016 Airport Fuel
03/10/2016 08:00 PM UTC
502-03-16-08-2
2016 Asphaltic Hot Mix
03/10/2016 08:00 PM UTC
313-00-16-02-2
2015 District 13 Panel Replacements
02/24/2016 08:00 PM UTC
311-00-16-03-2
2015 District 11 Road Improvements
02/24/2016 08:00 PM UTC
622-10-15-35-2
Utility Construction and Maintenance Contract
02/17/2016 08:00 PM UTC
761 - 770 of 945 Solicitations
1 2 73 74 75 77 79 80 81 94 95