General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-012-103509.1R
Tomb Flats - ADA Fishing Access Forest District 12, Tiadaghton State Forest Brown Township, Lycoming County, Pennsylvania The work under this project consists of constructing a new ADA fishing platform, ADA parking, concrete walkways, a concrete boat ramp extension, and other miscellaneous site improvements at Tomb Flats Campground in Tiadaghton State Forest. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/25/2024 06:00 PM UTC
FDC-133-103473.1
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-133-103473.4
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-007-101656.1
Pave District Office Parking Lots, Maintenance HQ's Access Road, Pole Building Access Road Forest District 7, Bald Eagle State Forest Hartley Township, Centre County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
07/11/2024 06:00 PM UTC
FDC-211-07293.1
Structure Replacement, Great Allegheny Passage (GAP) Trail Over UNT to Youghiogheny River Ohiopyle State Park Stewart Township, Fayette County, Pennsylvania Structure Replacement (Bridge) DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-422-7486.1
Replace Boat Rental Docks (CULP) Nockamixon State Park Haycock Township, Bucks County, Pennsylvania. Work included under this project consists of the design of a new dock system using the existing ramps and professional engineer certification SDB Participation Goal: 12% VBE Participation Goal: 3% Engineer's Estimate: $600,000- $1 Million
06/27/2024 06:00 PM UTC
FDC-011-103307.1R
New Structure, Bridge 11-0009 Red Pine Plantation Trail Forest District 11, Pinchot State Forest Thornburst Township Lackawanna County, Pennsylvania Project Description: New Structure Project – Bridge No. 35-7935-5111-0009 a. Construction of the Red Pine Plantation Trail alignment from Station 11+00.00 to Station 15+50.00. b. Construction of a new prefabricated modular/panel steel truss on reinforced concrete abutments, associated riprap placement, channel grading, and guide rail installation for the Red Pine Plantation Trail crossing over Sand Spring Run SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $500,000-$1 million
06/27/2024 06:00 PM UTC
FDC-422-102768.1
PM Septic Tank Repair/Replacement Nockamixon State Park Haycock Township, Bucks County Project Description: Work includes the complete construction and start-up of a new residential sandmound style septic sewage disposal system at the Nockamixon State Park Deerwood Lane Residence DGS Small Business Certification Required Engineer's Estimate:30,000-60,000
06/27/2024 06:00 PM UTC
FDC-407-103143.1
Stream Assessment/Streambank Stabilization Jacobsburg Environmental Education Center Bushkill Township, Northampton County, Pennsylvania Work includes the complete construction of streambank stabilization and stream restoration measures along a 1,600 linear feet section of Bushkill Creek, located at the Jacobsburg Environmental Education Center. The Contractor will construct all streambank stabilization and stream restoration features in accordance with the plans, cross sections and details. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
06/13/2024 06:00 PM UTC
FDC-012-103509.1
Tomb Flats - ADA Fishing Access Forest District 12, Tiadaghton State Forest Brown Township, Lycoming County Pennsylvania The work under this project consists of constructing a new ADA fishing platform, ADA parking, concrete walkways, a concrete boat ramp extension, and other miscellaneous site improvements at Tomb Flats Campground in Tiadaghton State Forest. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/06/2024 06:00 PM UTC
171 - 180 of 266 Solicitations
1 2 … 14 15 16 18 20 21 22 … 26 27