General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1R
Water Treatment Facility - Forest District Office Forest District 9, Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
07/17/2025 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
FDC-210-103441.1
Force Main Replacement LS7 Moraine State Park Muddy Creek Township, Butler County Work included under this contract consists of the complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/22/2023 06:00 PM UTC
FDC-414-102033.1R
Roadway Rehabilitations Promised Land State Park The work of this project will take place along Pickerel Point Road, North Shore Road and Ridgefield Point Road in Promised Land State Park located in Blooming Grove, Greene and Palmyra Townships, Pike County. Work included under this contract includes the full depth reclamation and repaving of approximately 1.1 miles of Pickerel Point Road, and the replacement of seven (7) existing culvert pipes and restoration of the ditch lines along the side of the road for storm water drainage improvements. Work also includes asphalt base repairs and installation of an asphalt wearing course along approximately 3 miles of North Shore Road and 0.4 miles of Ridgefield Road, and the rehabilitation of the Ridgefield Road over Big Inlet bridge. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
06/08/2023 06:00 PM UTC
FDC-115-103057.1R
General Construction, Install Electric Dam Gate Operators and Generator Lyman Run State Park West Branch Township, Potter County, Pennsylvajia 1. Work included under this contract consists of the complete construction and installation work for the following: a. Structural underwater inspection of water structures consisting of drawdown structure, upstream conduit, control tower, labyrinth spillway weir, and stilling basin. Work will also consist of design and installing a bulkhead in underwater conditions at the inlet structure after inspection of the inlet is completed. b. Remove and replace both upstream and downstream sluice gate stems in the control tower that are a part of the sluice gate system. c. Install two new electric operators and actuators sufficient enough to open the existing 96” sluice gates upstream and downstream in the control tower. d. Provide services of a Rodney Hunt and Rotork representative or approved equal to adjust the wedges of the sluice gate and set up the settings of the operators to run properly using the generator in FDC- 115-103057.4 contract. e. Have the contracted divers remove bulkhead after all work is completed and approved. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-115-103057.4R
Electrical Construction Lyman Run State Park West Branch Township, Potter County, Pennsylvania The work under this project consists of providing a mobile generator system, generator interface kiosk with quick-connect disconnect switch, manual transfer switch, and actuator disconnect switches at Control Tower on the Dam at Lyman Run State Park. Work shall include all wiring and conduit, and utilization and demonstration of the mobile generator system in operating the gate actuators at the end of construction for start-up, training, and commissioning purposes. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-303-103059.1
Stream and Pedestrian Bridge Restoration Caledonia State Park Green and Franklin Townships, Franklin and Adams Counties, Pennsylvania Work included under this contract consists of restoring four (4) pedestrian bridges and restoration activities of two (2) streams. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-428-6503.1
General Construction, Shower House Replacement, Phase 1 and Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Clearing and grubbing of trees, shrubs, and other vegetation. b. Excavation, trenching, backfill, and compaction work required for new general, plumbing, and electrical construction work. c. Rough and finish grading. d. Construction of roadway and parking areas. e. Construction of stone and asphalt spurs, aggregate campsite living areas and tent pads. f. Signage, striping and relocation of wheel stops. g. Subsurface stone basins and rain gardens. h. Storm Sewer piping, domed risers, inlets and outlet structures. i. Domestic Water and Sanitary sewer piping related to exterior improvements. j. Wood fence k. Rock construction fencing, silt socks, and inlet protection. l. Construction of concrete and asphalt sidewalks. m. Seeding, mulching, and landscaping. n. Structure Demolition of Existing Showerhouses 1 and 3. o. Construction of new Showerhouses 1 and 3 including concrete footings and piers; concrete masonry unit (cmu) foundations; ground face cmu walls with insulation fill; reinforced cmu shear walls grouted solid; interior sloping reinforced concrete slab on grade floors; exterior reinforced concrete slab on grade with perimeter turndowns; wood shear wall extension panels; structural steel columns; common wood trusses; and miscellaneous rough carpentry and sheathing. p. Showerhouses 1 and 3 Building Envelope: Fiber cement siding and trim; building insulation and vapor barrier; thin stone veneer with cut stone base and water table; asphalt shingle roof; steel doors and frames; and aluminum windows. q. Showerhouses 1 and 3 Building Finishes, Specialties and Furnishings: Gypsum wall board; PVC panel ceilings, resinous floors; ceramic tile shower walls and floors; interior and exterior painting; solid surface countertops and integral sinks; exterior stainless-steel counters with integrated sinks; toilet and shower partitions; and toilet accessories. r. Department instruction and training. SDB Participation Goal 9% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
05/25/2023 06:00 PM UTC
FDC-428-6503.2
Mechanical Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Space heaters h. Exhaust grilles. i. Exhaust fans and related ductwork and insulation. j. HVAC controls and control systems. k. Miscellaneous earthwork related to the installation of the mechanical contract work. l. Testing, adjusting, and balancing. m. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $100,000
05/25/2023 06:00 PM UTC
FDC-428-6503.3
Plumbing Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Domestic water system piping. b. Water closets, urinals, lavatories, shower heads/controls, hose bibs, and other plumbing fixtures. d. Water heaters. e. Drinking fountain. f. Floor drains and trench drains. g. Sanitary sewer and vent piping. h. Propane gas piping from building to tank. Coordinate with .1 General Construction Contract for trenching and backfill. i. Connection to existing/relocated propane gas tanks. j. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
05/25/2023 06:00 PM UTC
FDC-428-6503.4
Electrical Construction, Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Disconnecting electrical devices and equipment scheduled for removal by .1 Contract. b. Coordination with Utility Company for installation of new transformer. c. Conduit and placement of underground electrical. Coordinate with .1 General Construction Contract for trenching and backfill. d. Electric kiosk, panels, cabinets, and other equipment. e. Complete power and lighting systems, including conduit, wiring, boxes, panels, and fixtures and devices. f. Lighting control system. g. Campsite electric pedestals. h. Connection of power to existing equipment and new equipment installed by others. i. Emergency lighting system. j. Miscellaneous earthwork related to the installation of the electrical contract work. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $400,000 - $1 Million
05/25/2023 06:00 PM UTC
171 - 180 of 194 Solicitations
1 2 12 13 14 15 16 18 20