General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-004-11390.1
Carroll Cabin Rehabilitation, Forbes Forestry District Wharton Township, Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $700,000
04/02/2026 05:00 PM UTC
FDC-004-11390.3
Carroll Cabin Rehabilitation, Forbes Forestry District Wharton Township, Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $28,000 - $30,000
04/02/2026 05:00 PM UTC
FDC-004-11390.4
Carroll Cabin Rehabilitation Forbes Forestry District Wharton Township Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $70,000
04/02/2026 05:00 PM UTC
FDC-007-11123.1
Structure Replacement, Bridge No. 07-0069, Havice Valley Service Road Over Havice Creek Forestry District 07, Bald Eagle State Forest Armaugh Township, Mifflin County, Pennsylvania Demolition of the existing single span structure carrying Havice Valley Service Road over Havice Creek. Demolition also includes the removal of an existing steel road gate at the south/east approach. Proposed structure is a single span non-composite rolled steel I-beam superstructure with transverse nail-laminated timber deck atop cast-in-place reinforced concrete cantilever abutments. Replacement also includes driving surface aggregate, rock lining, construction of bridge railing, guide rail and end treatments and construction of a single locking steel road gate at the south/east approach. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $700,000
04/02/2026 05:00 PM UTC
FDC-018-104124.1
Roof Replacement of RMC Building Weiser State Forest Township of Franklin Columbia County, Pennsylvania The project includes the removal and disposal of the existing metal roofing panels, trims, flashings, underlayment, existing gutters, and downspouts; inspecting the roof deck and replacing any damaged sheathing with 3/4" CDX plywood; installing new synthetic underlayment and ice & water shield; installing new metal roofing panels with all associated trims, flashings, ridge caps, and penetration boots; replacing the existing drip edge and all necessary flashing components; installing new gutters and downspouts complete with all required accessories and connections; and installing a complete, watertight metal roofing and drainage system DGS Small Business Certification Required Engineer's Estimate: $100,000 - $ 400,000
04/16/2026 05:00 PM UTC
FDC-100-11334.4
Install EV Charging Stations State Park Region 1 Ulysses Township Potter County, Pennsylvania The work under this project consists of providing and installing electric vehicle charging stations at the PA Lumber Museum in Park Region 1 (Northcentral PA). DGS Small Business Certification Required Engineer's Estimate: $50,000-$100,000
04/16/2026 05:00 PM UTC
FDC-407-103924.1
Rehab Of Henry Woods Access Road Jacobsburg Environmental Education Center Bushkill Township, Northampton County, Pennsylvania The work for this project will consist of repair, reclamation and repaving work of the sections of the existing paved roadway and other incidental construction of Bushkill Creek Access Road as specified in the plan, within Jacobsburg Environmental Education Center. DGS Small Business Certification Required Engineer's Estimate: $50,000-$100,000
04/16/2026 05:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-461-10174.1R
Project Name: Ida Flood Repairs at Bowmans Hill Wildflower Preserve Washington Crossing Historic Park Solebury and Upper Makefield Township Bucks County, Pennsylvania Project Description: The work for this project will take place within Bowmans Hill Wildflower Preserve located in Washington Crossing Historic Park,Solebury and Upper Makefield Townships, Bucks County, Pennsylvania. The work under this project shall consist of repairs and replacement of fencing, two (2) deer fencing stream crossings, erosion slope repairs, repairs to mill race walls, removal of accumulated sediment within the mill race, and the removal of damaged materials to be replaced. DGS Small Business Certification Required Engineer's Estimate: $50,000-$150,000
07/25/2024 06:00 PM UTC
FDC-012-103509.1R
Tomb Flats - ADA Fishing Access Forest District 12, Tiadaghton State Forest Brown Township, Lycoming County, Pennsylvania The work under this project consists of constructing a new ADA fishing platform, ADA parking, concrete walkways, a concrete boat ramp extension, and other miscellaneous site improvements at Tomb Flats Campground in Tiadaghton State Forest. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/25/2024 06:00 PM UTC
FDC-133-103473.1
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-133-103473.4
Sewage Treatment Plant Rehabilitation Bald Eagle State Park Liberty Township, Centre County, Pennsylvania Work covers the upgrade of the existing wastewater treatment facility owned and operated by Bald Eagle State Park, located in Liberty Township, Centre County. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-007-101656.1
Pave District Office Parking Lots, Maintenance HQ's Access Road, Pole Building Access Road Forest District 7, Bald Eagle State Forest Hartley Township, Centre County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
07/11/2024 06:00 PM UTC
FDC-211-07293.1
Structure Replacement, Great Allegheny Passage (GAP) Trail Over UNT to Youghiogheny River Ohiopyle State Park Stewart Township, Fayette County, Pennsylvania Structure Replacement (Bridge) DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
07/11/2024 06:00 PM UTC
FDC-422-7486.1
Replace Boat Rental Docks (CULP) Nockamixon State Park Haycock Township, Bucks County, Pennsylvania. Work included under this project consists of the design of a new dock system using the existing ramps and professional engineer certification SDB Participation Goal: 12% VBE Participation Goal: 3% Engineer's Estimate: $600,000- $1 Million
06/27/2024 06:00 PM UTC
FDC-011-103307.1R
New Structure, Bridge 11-0009 Red Pine Plantation Trail Forest District 11, Pinchot State Forest Thornburst Township Lackawanna County, Pennsylvania Project Description: New Structure Project – Bridge No. 35-7935-5111-0009 a. Construction of the Red Pine Plantation Trail alignment from Station 11+00.00 to Station 15+50.00. b. Construction of a new prefabricated modular/panel steel truss on reinforced concrete abutments, associated riprap placement, channel grading, and guide rail installation for the Red Pine Plantation Trail crossing over Sand Spring Run SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $500,000-$1 million
06/27/2024 06:00 PM UTC
FDC-422-102768.1
PM Septic Tank Repair/Replacement Nockamixon State Park Haycock Township, Bucks County Project Description: Work includes the complete construction and start-up of a new residential sandmound style septic sewage disposal system at the Nockamixon State Park Deerwood Lane Residence DGS Small Business Certification Required Engineer's Estimate:30,000-60,000
06/27/2024 06:00 PM UTC
FDC-407-103143.1
Stream Assessment/Streambank Stabilization Jacobsburg Environmental Education Center Bushkill Township, Northampton County, Pennsylvania Work includes the complete construction of streambank stabilization and stream restoration measures along a 1,600 linear feet section of Bushkill Creek, located at the Jacobsburg Environmental Education Center. The Contractor will construct all streambank stabilization and stream restoration features in accordance with the plans, cross sections and details. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
06/13/2024 06:00 PM UTC
141 - 150 of 237 Solicitations
1 2 11 12 13 15 17 18 19 23 24