2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year. The ESTIMATED quantities are: Carbon Dioxide (CO2) - 600,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring. The ESTIMATED quantities are: Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
11/16/2026 08:00 PM UTC
2027 Sanitary Sewer Cured-in-Place Pipe (CIPP) Lining Project
The work consists of completing cured-in-place pipe lining (CIPP). Specifications include Traffic Control, TV Inspection, Cleaning, Chemical Grouting, CIPP, Service Connection Liner, Polyurea Manhole Rehabilitation, Temporary Bypass Pumping. Project Location • Between 7th and 8th Street from Grove Street to S. Court Street • Between 5th and 6th Street from Chestnut Street to Poplar Street Pre-Bid Meeting Information (VIRTUAL) Date: November 12, 2026 Time: 1:00 PM https://teams.microsoft.com/meet/2378991686536148?p=jPklmmYPdA3SNmDhbG Meeting ID: 237 899 168 653 614 8 Password: 2dj2rG66
11/20/2026 03:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Bishop Run Drainage Improvements
This project consists of the following: - Installation of two stormwater basins, approximately 500' of 60" storm conduit, 700' of concrete channel, and associated drainage structures - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. - Via Alternate Bids, this work may also contain the installation of approximately 250' of 36" storm conduit and associated structures. Via a separate alternate this work may also contain the replacement of approximately 950' of 24" storm conduit and associated structures
06/17/2022 05:00 PM UTC
Warner Road Utilities, Phase-1
This project entails the extension of sanitary and water along Warner Road. The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road. This project is a re-bid. The new bid opening date is June 10, 2022 at 1:15PM. There is NO pre-bid meeting for this project.
06/10/2022 05:15 PM UTC
Warner Road Utilities, Phase 1
This project entails the extension of sanitary and water along Warner Road. The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road. The date of Substantial Completion and the Engineer's Estimate are now listed in Addendum #1
04/29/2022 05:30 PM UTC
Fourth Street Bridge Replacement
The project will replace the existing reinforced concrete slab structure on 4th street over town run with a 14' x 10' precast reinforced concrete box culvert. The project includes full depth pavement replacement, curb and gutter, concrete sidewalk, building repairs, and other improvements. The total project length is 275 feet. The date of Substantial Completion is November 30, 2022, and the date of readiness for final payment is December 31, 2022. The City's Estimate is $749.500.00
04/06/2022 05:15 PM UTC
2022 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 21,000 LF of roadway. 2) Approximately 6,000 LF of curb, 41 curb ramps, and 5,000 SF of sidewalk. 3) Installation of pavement markings
03/25/2022 06:00 PM UTC
Walnut Street Culvert Replacement
-Installation of a 49' long 16'X7' box culvert under Walnut Street - Necessary restoration (including asphalt and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. City Estimate: $320,000
03/11/2022 06:00 PM UTC
Uptown Alley Improvements
This project consists of: - Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks. - Installation of a dumpster and grease trap enclosure, decorative fencing, trench drain, planter beds, string lighting, and outdoor seating. - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $617,487.50
01/19/2022 06:00 PM UTC
Fladt Rd Booster Pump Station
Project consists of two (2) new 40 hp (800 gpm) horizontal split case pumps, electric valves, instruments, and miscellaneous piping to provide boosted pressure to the south distribution area including the new Jerome Township Elevated Storage Tank. The work is located in the pedestal of the existing Fladt Road Elevated Storage Tank. An optional site visit / pre-bid meeting will be held on Tuesday, December 7th at 10:00 am at the Fladt Road Elevated Storage Tank.
12/16/2021 07:00 PM UTC
2022 Water Treatment Chemicals - Liquid Oxygen (pure)
The work consists of providing Liquid Oxygen for the City of Marysville Water Treatment Facility operations during the 2022 calendar year.
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash for the City of Marysville Water Treatment Facility operations during the 2022 calendar year: The ESTIMATED quantity is 2,500.000 lbs.
11/23/2021 03:01 PM UTC
51 - 60 of 142 Solicitations