City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
Name * | Description | |
---|---|---|
2016 odot construction and material specifications.pdf (6.83 MB) | ||
general plan notes.pdf (18 KB) | ||
public roadway plan notes.pdf (46.2 KB) | ||
sanitary sewer plan notes.pdf (50.5 KB) | ||
storm sewer plan notes.pdf (48.5 KB) | ||
water plan notes.pdf (47.8 KB) | ||
sanitary sewer specifications.pdf (1.1 MB) | ||
water specifications.pdf (9.63 MB) | ||
sanitary sewer standard drawings.pdf (1.66 MB) | ||
stormwater standard drawings.pdf (2.11 MB) | ||
street standard drawings.pdf (3.52 MB) | ||
water standard drawings.pdf (2.37 MB) | ||
marysville supplemental specifcations.pdf (773 KB) | ||
stormwater drainage manual.pdf (2.89 MB) | ||
marysville_2017 w-9.pdf (75.7 KB) | ||
Number | Deadline |
---|---|
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway.
U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 2:00 – 3:00pm
Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation
Wednesday, January 8, 2025 · 2:00 – 3:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/uni-crgj-vnq
Or dial: (US) +1 302-316-4650 PIN: 191 862 263#
More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
| 01/22/2025 06:00 PM UTC |
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications.
Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 1:00 – 2:00pm
Pre-Bid : Coleman's Crossing & Industrial Parkway RAB
Wednesday, January 8, 2025 · 1:00 – 2:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/dao-qicj-iqe
Or dial: (US) +1 650-535-0802 PIN: 961 673 407#
More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
| 01/22/2025 06:00 PM UTC |
Number | Deadline |
---|---|
2023 Paving Program
City of Marysville 2023 Paving Program project with consist of the following:
• Pavement planing and re-surfacing of approximately 9,500 L.F of roadway
• Including curb ramp, curb, and sidewalk replacement
• Pavement planning and re-surfacing with generally two (2) inches
of asphalt concrete surface course
• Installation of pavement markings
| 03/24/2023 05:00 PM UTC |
State Route 31 & Creekview Drive Roundabout
This project includes the construction of a modern roundabout at the intersection of SR 31 and Creekview Drive, curb and gutter, storm sewer, pavement markings, and the necessary traffic control devices.
There will be a Virtual Pre Bid Meeting for this project on
Thursday, March 16 at 9:00am
Join with Google Meet at:
meet.google.com/nhk-gxry-isc
or Join by phone
929-324-6458 PIN: 843 246 286#
| 03/24/2023 03:00 PM UTC |
City of Marysville Police Station Remodel
The project consists of the installation of the following:
● Conversion of the existing conference room to be two offices and conversion of an existing office and adjacent work space to a conference room.
● Associated mechanical and electrical improvements related to the renovation.
● Necessary restoration (including wall patching, painting, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
A Pre-Bid Conference will be held in-person and virtually on March 2, 2023 at 2:00pm. Meeting information will be distributed to plan holders on Bid Express 48 hours prior to the meeting.
| 03/23/2023 08:00 PM UTC |
Marysville MOC Renovation Project
Interior renovation of the existing Maintenance and Operations Center including architectural, electrical, mechanical, and plumbing.
There will be a Pre-Bid Meeting held on site at the Maintenance and Operations Center, 455 North Maple St. Marysville, Ohio on February 21, 2023, at 3:00 p.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities
| 03/06/2023 07:00 PM UTC |
324 N Main St. Demolition and Remediation
This project entails the demolition of three buildings and their foundations, the demolition of a truck scale and its foundation, the removal of concrete pavement, the removal of a gravel drive and parking area, the importation of suitable fill and topsoil, and seeding the site.
There will be a Virtual Pre Bid Meeting on January 31 at 10:30 am.
Join with Google Meet: meet.google.com/amj-kixr-jqu
Join by phone: (US) +1 260-376-3049 PIN: 527 687 926#
| 02/10/2023 07:00 PM UTC |
Brownfield Remediation - Swifty Site
The bid is for removal, transport, and disposal of the UST system including PCS and PWS in its entirety. The project consists of the removal of the existing UST system located at the Property including potential contaminated soil (PCS) and groundwater (PWS). The existing system consists of three 10,000-gallon USTs con-taining gasoline, one 6,000-gallon UST containing kerosene, pump islands, and an overhead canopy; generally located inside the limits of the adjacent sidewalks.
The Project includes BUSTR closure sampling and reporting following the UST closure requirements in OAC 1301-7-9-12. Following the UST system removal, the Property will have all concrete surfacing removed, and UST cavities backfilled with clean aggregate and covered with a minimum of 6-inches of topsoil, seeded, and hydro-mulched.
There will be a Virtual Pre-Bid Meeting on January 31, 2023 at 10:00 a.m.
Join with Google Meet: meet.google.com/ppg-bvbz-oea
Join by phone: (US) +1 601-844-2913 PIN: 398 596 365#
| 02/10/2023 07:00 PM UTC |
2023 Wastewater Treatment Chemicals - Nitrate Solution
The work consists of providing Nitrate Solution for the City of Marysville Wastewater Reclamation Facility operations during the 2023 calendar year. There are nine (9) tanks will require remote monitoring. The ESTIMATED quantity is 100,000 gallons.
| 12/12/2022 07:00 PM UTC |
2023 Wastewater Treatment Chemicals - Ferric Chloride Solution
The work consists of providing Ferric Chloride Solution for the City of Marysville Wastewater Reclamation Facility operations during the 2023 calendar year. The ESTIMATED quantity is 110,000 gallons.
| 12/12/2022 07:00 PM UTC |
2023 Wastewater Treatment Chemicals - Propane
The work consists of providing Propane for the City of Marysville Water Reclamation Facility operations during the 2023 calendar year. The ESTIMATED quantity is 75,000 gallons
| 12/12/2022 07:00 PM UTC |
Reservoir Connector Bridge
This project creates a connection from the Jim Simmons Trail to the City’s Reservoir Park Trail by providing a pedestrian bridge over Mill Creek and a 10 foot wide shared use path.
There will be a Virtual Pre Bid Meeting for this project on
Wednesday, November 23 · 9:00 – 9:30am
Google Meet joining info
Video call link: https://meet.google.com/zci-exsu-sxc
Or dial: (US) +1 701-660-5603 PIN: 159 460 875#
More phone numbers: https://tel.meet/zci-exsu-sxc?pin=3688646067264
| 12/12/2022 07:00 PM UTC |