General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
Colemans Crossing & Honda Marysville Traffic Signal
This project consists of installing a traffic signal, including curb ramp replacement, signage and pavement marking modifications, at the intersection of Colemans Crossing Boulevard and the Honda Marysville/Wal-Mart drive in the City of Marysville, Ohio. There will be a Pre-Bid Meeting held virtually on February 27, 2026 at 10:00 A.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. VIRTUAL Pre-Bid Meeting: Colemans Crossing & Honda Marysville Traffic Signal Friday, February 27 ⋅ 10:00 – 11:00am Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/mnx-qanr-tfy Join by phone: ‪(US) +1 440-652-2236‬ PIN: ‪927 633 336‬#‬‬‬‬
03/13/2026 02:00 PM UTC
2026 Paving Program
The project consists of the following: • Pavement planing and re-surfacing of approximately 8,500 L.F of roadway • Including curb ramp, curb, and sidewalk replacement • Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course • Installation of pavement markings
04/02/2026 05:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2024 Water Chemicals
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Pebble Lime, Bulk Soda Ash, and Ferric Chloride Solution. The bid consists of suppling and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2024 calendar year. This proposal does not require any bidder to submit an "all-or nothing" bid. Bidders may bid on one, two, or all three chemicals. Each chemical will be awarded separately. The City anticipates awards to multiple suppliers. The ESTIMATED quantities are: Pebble Lime - 2,000,000 lbs. Bulk Soda Ash - 1,600,000 lbs. Ferric Chloride Solution - 540,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/17/2023 02:00 PM UTC
SR 31 Traffic Signal Equipment
This contract will provide traffic signal support poles & mast arms along withh video detection equipment to be installed by others for the SR 31 Phase 3 project.
08/11/2023 01:00 PM UTC
CDBG Sidewalk Improvements
Approximately 4,800 SF of concrete sidewalk and approximately 160 SY of non-reinforced concrete driveway approach. Virtual Pre-Bid Meeting Information: Computer: https://meet.google.com/jss-afwu-dqx Phone: (‪US‬)+1 612-314-0800‬ PIN: ‪791 442 524#‬
06/30/2023 01:00 PM UTC
Marysville MOC Renovation Project
Interior renovation of the existing Maintenance and Operations Center including architectural, electrical, mechanical, and plumbing. There will be a Pre-Bid Meeting held on site at the Maintenance and Operations Center, 455 North Maple St. Marysville, Ohio on May 17, 2023, at 11:00 a.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities.
05/31/2023 06:00 PM UTC
Marysville City Hall Parking Lot
This project includes the construction of a parking lot expansion that serves the Marysville City Hall building. Site improvements will include demolition of the existing pavement, proposed pavement, parking striping, lighting, landscaping, and storm sewer. There will be a Virtual Pre Bid Meeting for this project on Wednesday, April 5 at 9:00AM. Join with Google Meet: meet.google.com/rft-dnjy-jwu Join by phone: 302-481-5162‬ PIN: ‪959 735 948‬#
04/27/2023 03:00 PM UTC
Watkins Road Gravity Sanitary Sewer and Force Main
The project consists of constructing gravity sewer and force main improvements associated with the Watkins Road Pump Station and generally consisting of the following aspects: • Approximately 6,800 LF of gravity sewer ranging in size from 12-inch to 36-inch and 4,400 LF of 12-inch nominal inside diameter forcemain that collects sanitary sewer flow from upstream of the Watkins Rd Pump Station and conveys it to the City's 60-inch interceptor sewer which flows to the WWTP. • Two existing pump stations, Square Drive Pump Station and Watkins Glen Pump Station, will be decommissioned and flows will be conveyed to the Watkins Rd Pump Station by the new gravity sewer. • Additionally, approximately 2,100 LF of 48-inch storm sewer and a corresponding Shared Use Path will be constructed along Delaware Ave/US 36. VIRTUAL Pre-bid meeting Tuesday, April 11, 2023 at ⋅2:00 pm Join with Google Meet: meet.google.com/zyc-vycn-kjx Join by phone: (636) 492-2417‬ PIN: ‪667 660 696‬#
04/21/2023 05:15 PM UTC
Elwood Avenue Roadway Reconstruction
This project will include asphalt resurfacing, concrete curb installation, concrete driveway approaches, concrete sidewalks, storm sewer improvements, and street lighting. This project will enhance the look and feel of Elwood Avenue as well as provide better pedestrian accessibility and connectivity along the corridor. There will be a VIRTUAL Pre-Bid Meeting for this project on March 21, 2023 at 10:00 a.m. Join with Google Meet at: meet.google.com/qfe-okdj-uig or Join by phone 385-323-0281‬ PIN: ‪157 184 433‬#
03/31/2023 03:00 PM UTC
2023 Paving Program
City of Marysville 2023 Paving Program project with consist of the following: • Pavement planing and re-surfacing of approximately 9,500 L.F of roadway • Including curb ramp, curb, and sidewalk replacement • Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course • Installation of pavement markings
03/24/2023 05:00 PM UTC
State Route 31 & Creekview Drive Roundabout
This project includes the construction of a modern roundabout at the intersection of SR 31 and Creekview Drive, curb and gutter, storm sewer, pavement markings, and the necessary traffic control devices. There will be a Virtual Pre Bid Meeting for this project on Thursday, March 16 at 9:00am Join with Google Meet at: meet.google.com/nhk-gxry-isc or Join by phone 929-324-6458‬ PIN: ‪843 246 286‬#
03/24/2023 03:00 PM UTC
City of Marysville Police Station Remodel
The project consists of the installation of the following: ● Conversion of the existing conference room to be two offices and conversion of an existing office and adjacent work space to a conference room. ● Associated mechanical and electrical improvements related to the renovation. ● Necessary restoration (including wall patching, painting, etc.) and other miscellaneous items required to restore the area to its original condition, or better. A Pre-Bid Conference will be held in-person and virtually on March 2, 2023 at 2:00pm. Meeting information will be distributed to plan holders on Bid Express 48 hours prior to the meeting.
03/23/2023 08:00 PM UTC
21 - 30 of 136 Solicitations
1 3 5 6 7 8 9 13 14