City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
Name * | Description | |
---|---|---|
2016 odot construction and material specifications.pdf (6.83 MB) | ||
general plan notes.pdf (18 KB) | ||
public roadway plan notes.pdf (46.2 KB) | ||
sanitary sewer plan notes.pdf (50.5 KB) | ||
storm sewer plan notes.pdf (48.5 KB) | ||
water plan notes.pdf (47.8 KB) | ||
sanitary sewer specifications.pdf (1.1 MB) | ||
water specifications.pdf (9.63 MB) | ||
sanitary sewer standard drawings.pdf (1.66 MB) | ||
stormwater standard drawings.pdf (2.11 MB) | ||
street standard drawings.pdf (3.52 MB) | ||
water standard drawings.pdf (2.37 MB) | ||
marysville supplemental specifcations.pdf (773 KB) | ||
stormwater drainage manual.pdf (2.89 MB) | ||
marysville_2017 w-9.pdf (75.7 KB) | ||
Number | Deadline |
---|---|
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway.
U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 2:00 – 3:00pm
Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation
Wednesday, January 8, 2025 · 2:00 – 3:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/uni-crgj-vnq
Or dial: (US) +1 302-316-4650 PIN: 191 862 263#
More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
| 01/22/2025 06:00 PM UTC |
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications.
Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 1:00 – 2:00pm
Pre-Bid : Coleman's Crossing & Industrial Parkway RAB
Wednesday, January 8, 2025 · 1:00 – 2:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/dao-qicj-iqe
Or dial: (US) +1 650-535-0802 PIN: 961 673 407#
More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
| 01/22/2025 06:00 PM UTC |
Number | Deadline |
---|---|
2023 Water Treatment Chemicals - Pebble Lime
The work consists of providing Pebble Lime for the City of Marysville Water Treatment Facility operations during the 2023 calendar year.
| 12/12/2022 07:00 PM UTC |
2022 Water Treatment Chemicals - Ferric Chloride (Bulk)
The work consists of providing Ferric Chloride (Bulk) for the City of Marysville Water Treatment Facility operations during the 2023 calendar year.
| 12/12/2022 07:00 PM UTC |
2023 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash for the City of Marysville Water Treatment Facility operations during the 2023 calendar year.
| 12/12/2022 07:00 PM UTC |
Vine Street Pocket Park
This project is the construction of a new pocket park located on the vacant lot at the corner of 5th Street and Vine Street in Marysville, Ohio.
A Pre Bid meeting will be held at City Hall. 209 South Main Street, Marysville, Ohio 43040 on Wednesday, November 30, 2022 at 2:00 PM
| 12/12/2022 07:00 PM UTC |
33 Innovation Pak, Phase 3
The project consists of the following:
· Public roadway extension (including curb and asphalt multi-use path)
· 8” and 10” Sanitary Sewer and associated appurtenances
· Street lighting system
There will be a Pre-Bid Meeting held at City Hall, 209 South Main Street, Marysville, Ohio on November 30, 2022
at 1:00 p.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and
existing facilities. Bidders are encouraged to attend and participate in the conference.
| 12/12/2022 06:00 PM UTC |
Town Run Culvert Replacement
The project consists of the following:
• Rehabilitation of an existing concrete box culvert located under the former Fraternal Order of Eagles building (227 South Main Street, Marysville, OH 43040)
• An alternate bid will be included for the complete removal and replacement of the box culvert structure
There will be a Pre-Bid Meeting held at City Hall, 209 South Main Street, Marysville, Ohio on October 12, 2022 at 1:30 p.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities.
| 10/27/2022 05:30 PM UTC |
Watkins Road Pump Station
The project consists of building a new sewage pumping station on a site owned by the City and generally
consisting of the following aspects:
A pump building along with a smaller building to house the biofilter. Major equipment associated with the facility include dry-pit submersible pumps, bioxide chemical feed system, biofilter odor control system, standby generator, onsite utilities, site development and paving, landscaping, and related systems.
The engineer’s estimate for construction is $6,950,000.
A pre-bid meeting will be held via teleconference on August 2, 2022 at 9:00 am local time.
Pre-Bid Meeting - Microsoft Teams
Join on your computer or mobile app:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzI4NDE4NWMtMTUwNy00MzUzLTliYTItNDlmN2UwZTliOWM3%40thread.v2/0?context=%7b%22Tid%22%3a%2216ed5ab4-2b59-4e40-806d-8a30bdc9cf26%22%2c%22Oid%22%3a%22f78e6c5d-f43b-4ae2-af4a-496c1ca83d96%22%7d
Meeting ID: 211 972 505 499
Passcode: LB5LJa
Or call in (audio only):
+1 513-818-0118,,929505785# United States, Cincinnati
(877) 286-5733,,929505785# United States (Toll-free)
Phone Conference ID: 929 505 785#
| 08/30/2022 06:00 PM UTC |
Bishop Run Drainage Improvements
This project consists of the following:
- Installation of two stormwater basins, approximately 500' of 60" storm conduit, 700' of concrete channel, and associated drainage structures
- Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
- Via Alternate Bids, this work may also contain the installation of approximately 250' of 36" storm conduit and associated structures. Via a separate alternate this work may also contain the replacement of approximately 950' of 24" storm conduit and associated structures
| 06/17/2022 05:00 PM UTC |
Warner Road Utilities, Phase-1
This project entails the extension of sanitary and water along Warner Road.
The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet.
The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road.
This project is a re-bid. The new bid opening date is June 10, 2022 at 1:15PM.
There is NO pre-bid meeting for this project.
| 06/10/2022 05:15 PM UTC |
Warner Road Utilities, Phase 1
This project entails the extension of sanitary and water along Warner Road.
The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet.
The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road.
The date of Substantial Completion and the Engineer's Estimate are now listed in Addendum #1
| 04/29/2022 05:30 PM UTC |