Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators.
The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register.
Project Contact: Martina Foss Ashworth
Contact Email: mfoss@millerdunwiddie.com
| 04/10/2025 07:00 PM UTC |
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders
inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee
General Mitchell International Airport (MKE).
Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at
Milwaukee Mitchell International Airport (MKE). This project
involves an asphalt mill & overlay, storm sewer structure
replacement and pavement marking.
Additive Alternate: WA0417 MKE Rehabilitate Taxiway F
This project is for the rehabilitation of Taxiway F between
Runways 1L/19R and 7L/25R at Milwaukee Mitchell International
Airport (MKE).
Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract:
Base Bid Only = 137 Calendar Days
Base Bid + Alternate = 137 Calendar Days
The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity.
Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM
Pre-Bid meeting will be done virtually via Teams. To acquire the
meeting link to the pre bid meeting, please contact Kwame
Amegashitsi at kamegashitsi@mitchellairport.com prior to
Monday, March 24, 2025, at 5:00PM. Later requests are not
guaranteed a timely response.
| 04/16/2025 07:00 PM UTC |
Number | Deadline |
---|---|
A263-19001 - MKE Howell Avenue Tunnel Rehabilitation
This project includes a 0.5" mill and 2.25' overlay of approximately 7,500 square yard of airfield (FAA Spec P-401) pavement on the surface over the Howell Avenue Tunnel at Milwaukee Mitchell International Airport. Also included are areas of joint sealing, crack sealing, pavement marking, and turf repair.
Pre-Bid Meeting: Thursday, May 23, 2019 at 9:00 A.M. Meet in the Hardie Conference Room, in the MKE upper level administration wing, 5300 S. Howell Ave., Milwaukee, WI
| 06/07/2019 07:00 PM UTC |
P544-18604
Contract 1: Electrical Service Upgrade
Project consists of providing Electrical Service Upgrade Work as indicated on Contract bidding documents.
One MANDATORY Pre-bid meeting will take place on May 15, 2019 at 9:00 A.M., meet at McCarty Park Pavilion, 8214 West Cleveland Avenue, West Allis, WI.
| 06/05/2019 07:00 PM UTC |
5045-19018 - GMIA Parking Structure Swinging Door Replacement
Replacement of automatic pedestrian doors, frames and operators located between the parking structure and both skywalks, all levels.
Pre-Bid Meeting: Wednesday, May 29, 2019, at 1:30 P.M., Hardie Conference Room, located in GMIA Administration.
| 06/05/2019 07:00 PM UTC |
P696-19429 - South Shore Marina Boat Launch Restroom Rehabilitation
Contract 1: Restroom Rehabilitation
Project consists of demolition and replacement of interior walls, floor tiles and base, ceiling, floor slab, exterior doors and frames, mechanical system, electrical heaters, plumbing fixtures, toilet, compartments, lighting, and drinking fountains as indicated on Contract Bidding Documents.
MANDATORY PRE-BID MEETING: May 20, 2019 at 10:00 A.M., meet at South Shore Marina Boat Launch Restroom, 2900 South Shore Drive, Milwaukee, WI.
FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
| 05/29/2019 07:00 PM UTC |
A277-19012
This project includes a 2" mill and overlay of approximately 30,000 square yards of airfield (FAA Spec P-401) pavement on taxiways B, D, D1, and D2 at Milwaukee County's Timmerman Airport. The project also includes joint sealing, pavement marking and turf repair.
Pre-Bid Meeting: Tuesday 5/14/2019 at 9:00AM. Held on the 2nd floor of L.J. Timmerman Airport FBO building (Spring City Aviation) at 9305 W Appleton Ave; Milwaukee, WI 53225
| 05/22/2019 07:00 PM UTC |
A260-18011
GMIA Parking Structure Stairwell Repairs ReBid
Project includes various small repairs on the six floors of 6 stairwells within the GMIA parking structure. Includes door replacement, concrete repairs, masonry, flashing, structural steel repairs, and painting.
| 04/03/2019 07:00 PM UTC |
A260-18011
MKE Parking Structure Stairs Repairs
Project includes various small repairs on the six floors of 6 stairwells within the GMIA parking structure. Includes door replacement, concrete repairs, masonry, flashing, structural steel repairs, and painting.
PreBid Meeting at GMIA Parking Structure 6th floor Stairwell 1 (West Side) on 2/7/19 at 1:30
| 02/20/2019 08:00 PM UTC |
A245-18003
General Mitchell International Airport GMIA Airfield Safety Improvement: 19L-1R, TXY M Storm Sewer
| 10/24/2018 07:00 PM UTC |
5045-18017
MKE PARKING STRUCTURE REPAIRS: Concrete and waterproofing membrane repairs to the 3rd floor elevated post-tensioned concrete parking deck at MKE. The work includes existing membrane patching, epoxy of concrete spalls through the existing membrane, and concrete surface repairs with full membrane replacement.
| 09/12/2018 07:00 PM UTC |