Milwaukee County
600 N Plankinton Ave Ste 600, Milwaukee, WI 53203-2901
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
600 N Plankinton Ave Ste 600, Milwaukee, WI 53203-2901
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
WP074401: Oak Leaf Trail Juneau Park OLT Mason to LMD
Work of the Project includes reconstructing 1400′+/- asphalt access ramp connection with shoulders between Lincoln Memorial Drive and Mason Street along the existing Oak Leaf Trail. Specific project work includes a detour to the OLT Brady Street Bridge and Mason Street Bridge, clearing and grubbing, removals, grading, base aggregate dense, asphaltic paving, and restoration.
Optional Pre-Bid Meeting: Thursday, August 6, 2026 at 10:00am. Meet on site at Juneau Park near Mason Street and Prospect Avenue, Milwaukee, WI.
| 08/13/2026 07:00 PM UTC |
|
WP078201 Oak Leaf Trail Access Ramp
Work of the Project includes constructing a 10-foot-wide asphalt access ramp connection with 3-foot shoulders between the intersection of N Cambridge Ave and E Kenwood Blvd and the existing Oak Leaf Trail. Specific project work includes grading
operations, base aggregate dense, retaining wall installation, ADA curb ramps at the roadway intersection, permanent signing, pavement marking, and slope restoration.
Optional Pre-Bid Meeting: Thursday July 23rd, at 10:00 AM. Meet on site near Cambridge Ave and E. Kenwood Blvd.,
Milwaukee, WI.
| 08/20/2026 07:00 PM UTC |
|
WP0750 BENDER PARK ROADWAY AND DRAINAGE
Work of the project involves reconstruction of the Bender Park roadway and drainage improvements. Work includes asphalt, stone base, concrete curb and gutter, concrete raised crosswalks, colored concrete, drainage and storm sewers, overlook, concrete seat wall, dry pond, and landscaping. Other work includes lakefront path and guardrail improvements.
Optional Pre-Bid Meeting: Monday, August 10th, 2026 at 1 PM. Meet at the Bender Park Boat Launch. This onsite walkthrough and meeting and is for contractors to visualize project. This meeting is to explain requirements and ask questions.
| 08/27/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
P727-20199: Oak Leaf Trail Union Pacific Segment Crestwood Stream Culvert
Contract 1- Oak Leak Trail Culvert Replacement
Work consists of replacing an existing stone arch culvert under the Oak Leaf Trail with a corrugated metal culvert pipe. Excavate and remove existing stone and debris from Crestwood Stream channel through the culvert. Install an arch corrugated metal pipe culvert, backfill and restore the disturbed area.
Project Completion: Work of Contract shall be Substantially Complete by June 1, 2022.
Pre-Bid Meeting: August 5, 2021 at 2:00 pm, meet at the 2200 block of W. Florist Avenue at the service entrance to Johnson Control Inc., Glendale, WI.
Prime Contractor shall perform at least 30 percent of the original contract amount with contractor's own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
| 08/18/2021 07:00 PM UTC |
|
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1:
1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish).
2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps.
Pre-Bid Meeting for CONTRACT-1, Bid Package 1
Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
| 07/21/2021 07:00 PM UTC |
|
O889-20190: Marcus Center For The Performing Arts Pedestrian Pavement Replacement
Contract 1: Pedestrian Pavement Replacement
Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents.
Pre-Bid Meeting: One Pre-Bid meeting will take place on July 14th, 2021 at 1:00 PM at the Marcus Center (outside under the main entry canopy along North Water Street), 929 N. Water Street, Milwaukee, WI 53202. This will be an in-person meeting, please bring masks and follow COVID guidelines. It is strongly recommended that the contractors attend, but it is not mandatory.
| 07/21/2021 07:00 PM UTC |
|
9525-21405-04: 2021 Time and Material Zoological Gardens
Contract 4: Electrical
| 07/14/2021 07:00 PM UTC |
|
9525-21405-05: 2021 Time and Material Zoological Gardens
Contract 5: Fences and Gates
| 07/14/2021 07:00 PM UTC |
|
9525-21405-06: 2021 Time and Material Zoological Gardens
Contract 6: General Construction
| 07/14/2021 07:00 PM UTC |
|
9525-21405-07: 2021 Time and Material Zoological Gardens
Contract 7: Metal Fabrication
| 07/14/2021 07:00 PM UTC |
|
9525-21405-08: 2021 Time and Material Zoological Gardens
Contract 8: Plumbing
| 07/14/2021 07:00 PM UTC |
|
9525-21405-09: 2021 Time and Material Zoological Gardens
Contract 9: Roofing
| 07/14/2021 07:00 PM UTC |
|
M051-20160: MPM - North Stairwell Structural Wall Repair - Phase 2
Contract 1: Bid Package 1
1. Water penetration in the stairway vestibule and stairwell has caused corrosion resulting in loss of section properties of the supporting angle. Though not visible, the anchors for this area are suspected for being corroded as well. Cracks in the wall adjacent to the vestibule door are likely due to shifting of the slab above the door and poor placement of reinforcement at the door jamb/header interface. The anchors supporting the mezzanine floor slab above the ground level men's toilet room are failing, likely due to a combination of inadequate embedment of anchors and minor shifting of the slab relative to the north wall.
2. Provide a new structural support for the MacArthur Square slab above stairway vestibule and stairwell. Replacing the existing deteriorated supporting angle as the means of primary structural support.
3. New waterproofing is required of the MacArthur Square slab to stop water penetration into the stairway vestibule and stairwell.
4. To provide a new means of support for the mezzanine floor slab above the ground level Men's Toilet Room.
Pre-Bid Meeting: May 10, 2021 at 1:30 P.M at Milwaukee Public Museum, 800 West Wells Street, Milwaukee, WI 53233, Student Lunchroom-Ground Level.
| 05/19/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.