General Info

Business Logo

Milwaukee County

600 N Plankinton Ave Ste 600, Milwaukee, WI 53203-2901
(414) 278-4861

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WU0302062: WMC Veterans Gallery Windows
The scope of work includes removal and replacement of the War Memorial Center (WMC) Gallery Windows on the 3rd and 4th floors that face the interior courtyard, including related window components and repairs to adjacent EIFS wall areas as needed to ensure proper integration and building envelope performance. MANDATORY Pre-Bid Meeting: June 29, 2026 at 9:00am. Meet at the North Entrance of 750 N. Lincoln Memorial Drive, Milwaukee.
07/24/2026 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
6533-21400-05 -2021Time & Material (MKE) Behavior Health Division
Contract 5: Electrical
09/08/2021 07:00 PM UTC
6533-21400-06 -2021Time & Material (MKE) Behavior Health Division
Contract 6: Painting
09/08/2021 07:00 PM UTC
6533-21400-07 -2021Time & Material (MKE) Behavior Health Division
Contract 7: Roofing
09/08/2021 07:00 PM UTC
5041-21402-03 - 2021Time & Material (MKE) General Mitchell International Airport
Contract 3: Carpet & Resilient Flooring
08/25/2021 07:00 PM UTC
P727-20199: Oak Leaf Trail Union Pacific Segment Crestwood Stream Culvert
Contract 1- Oak Leak Trail Culvert Replacement Work consists of replacing an existing stone arch culvert under the Oak Leaf Trail with a corrugated metal culvert pipe. Excavate and remove existing stone and debris from Crestwood Stream channel through the culvert. Install an arch corrugated metal pipe culvert, backfill and restore the disturbed area. Project Completion: Work of Contract shall be Substantially Complete by June 1, 2022. Pre-Bid Meeting: August 5, 2021 at 2:00 pm, meet at the 2200 block of W. Florist Avenue at the service entrance to Johnson Control Inc., Glendale, WI. Prime Contractor shall perform at least 30 percent of the original contract amount with contractor's own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
08/18/2021 07:00 PM UTC
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1: 1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish). 2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps. Pre-Bid Meeting for CONTRACT-1, Bid Package 1 Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
07/21/2021 07:00 PM UTC
221 - 230 of 339 Solicitations
1 2 19 20 21 23 25 26 27 33 34