Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WC0227 Milwaukee County Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 13 elevators. The Mandatory Pre-Bid Meeting is on Monday, 02/24/25 from 10:00am - 12:00pm at 901 N 9th St, Milwaukee, WI 53233 Room G1. Pre-Registration is Required. for this meeting. Please contact Martina Foss Ashworth at mfoss@millerdunwiddie.com to register. Project Contact: Martina Foss Ashworth Contact Email: mfoss@millerdunwiddie.com
04/10/2025 07:00 PM UTC
WA0413 MKE Rehabilitate Bullseye
This project is for the rehabilitation of pavements and shoulders inside hold lines of Runways 1L-19R and 7RL-25L at Milwaukee General Mitchell International Airport (MKE). Project Completion: The number of consecutive calendar days the contractor has available to substantially complete the project, excluding punch list items is 165 Calendar Days. The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates close in proximity. Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM Pre-Bid meeting will be done virtually via Teams. To acquire the meeting link to the pre bid meeting, please contact Kwame Amegashitsi at kamegashitsi@mitchellairport.com prior to Monday, March 24, 2025, at 5:00PM. Later requests are not guaranteed a timely response.
04/16/2025 07:00 PM UTC
WA0400 MKE North Ramp Rehabilitation
This project is for the rehabilitation of the North Apron at Milwaukee Mitchell International Airport (MKE). This project involves an asphalt mill & overlay, storm sewer structure replacement and pavement marking. Additive Alternate: WA0417 MKE Rehabilitate Taxiway F This project is for the rehabilitation of Taxiway F between Runways 1L/19R and 7L/25R at Milwaukee Mitchell International Airport (MKE). Project Completion: If MKE North Ramp Rehabilitation is awarded, the contractor shall have a total of 137 calendar days to substantially complete the project, excluding punch list. If additive alternative, MKE Rehabilitate Taxiway F is awarded, no additional calendar days will be awarded to the contract: Base Bid Only = 137 Calendar Days Base Bid + Alternate = 137 Calendar Days The intention is to run MKE Rehabilitate Bullseye, MKE North Ramp Rehabilitation and MKE Rehabilitate Taxiway F concurrently with start dates in close proximity. Pre-Bid: Tuesday, March 25, 2025, at 9:00 AM Pre-Bid meeting will be done virtually via Teams. To acquire the meeting link to the pre bid meeting, please contact Kwame Amegashitsi at kamegashitsi@mitchellairport.com prior to Monday, March 24, 2025, at 5:00PM. Later requests are not guaranteed a timely response.
04/16/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
A266-20104 GMIA Electrical Switchgear Replacement
A266-20104: GMIA Electrical Switchgear Replacement. Remove (2) 5kv switchgear, (2) 5kv to 208v transformers, (2) distribution sections located in the terminal mezzanine above the ticketing area. Install (4) 480V to 208V transformer, (4) distribution panelboards. Transfer loads from exiting distribution sections to new panels. Demo 5kv feeders from basement to mezzanine. Install 480V feeders from 1st floor to mezzanine. A MANDATORY pre-Bid Meeting: October 29, 8:30 in the new Sijan Conference room in the main terminal behind the Miller Time Store.
11/11/2020 08:00 PM UTC
4315-20403-02: Time and Material Plumbing Contract House of Correction
Contract 2: Plumbing CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
10/28/2020 07:00 PM UTC
A392-20184 - GMIA Runway 7R-25L Pavement Rehabilitation
Contract Description: This project includes the removal and replacement of the existing 14” concrete overlay on a portion of runway 7R-25L at Milwaukee County’s Mitchell International Airport. Pending final funding, the concrete quantity is between 45,000 and 90,000 SY. Included in this contract will be pavement patching, jointing, grooving, and marking (removal and new). Pre-Bid Meeting: Tuesday 5/12/2020 at 9:00AM & 11:00AM (if needed). Meeting held in Hardie Conference Room in administrative wing of GMIA; 5300 S Howell Ave; Milwaukee, WI 53207. IMPORTANT: Meetings are limited to 9 attendees. Please reserve a spot in advance by emailing araab@mitchellairport.com by 3PM 5/11/2020. SPECIAL BID SUBMITTALS CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WITH BID. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
05/27/2020 07:00 PM UTC
A252-18008 - GMIA MKE Business Park Electrical Infrastructure Upgrade
Install WE Energies metering to approximately 42 buildings. Provide a new street lighting system using existing light poles. Provide a new cabling and panels for new street lighting. Replace 6 high mast apron lighting systems including, multiple lights per pole. Upgrade Main Electrical panel in Building 102. Demolish existing overhead service. Pre-Bid Meeting: Online notes and photos. Site visit by appointment.
05/13/2020 07:00 PM UTC
O517-17433 - Milwaukee County War Memorial Center Roof Replacement
Contract 1: Roof Replacement Project consists of replacing existing War Memorial Center Roof as indicated on Contract bidding documents. One MANDATORY Pre-bid meeting will take place on April 22, 2020, meet at the War Memorial Center Lobby, 750 Lincoln Memorial Drive, Milwaukee, WI. Contact Project Manager, Amir Adam, at least (two) days prior to pre-bid meeting date to schedule meeting time. Meetings and site walk through will be conducted in groups of (four) people maximum. E-mail: Amir.Adam@milwaukeecountywi.gov - Phone: 414-278-4260 FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE. CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WITH BID. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
05/06/2020 07:00 PM UTC
P704-20153 - Honey Creek Bridge Stone Masonry Facade Repairs
Contract 1: Bridge Façade Repairs Work will be performed on two Honey Creek Parkway Drive bridges - one North of W. Bluemound Road and the other South of W. Bluemound Road. Work consists of removing and disposing of existing stone façade material from the bridge headwalls and parapet walls. Then construct new reinforced concrete parapet walls/guard rails along the top of the existing concrete headwalls. Disturbed areas will be re-vegetated with turf as indicated in the project Bid documents. CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WITH BID. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
04/22/2020 07:00 PM UTC
O532-19427 - Marcus Center for the Performing Arts Elevator Modernization (Uihlein #4)
Contract 1: Elevator Modernization (Uhlein #4) Work of the project consists of the Marcus Center Elevator (Uihlein #4) Modernization as indicated on the project Drawings and Specifications. One MANDATORY Pre-Bid meeting will take place on March 31, 2020 at 10:00 A.M., meet at the security gate of Marcus Center for the Performing Arts, 929 North Water Street, Milwaukee, WI 53202. FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
04/17/2020 07:00 PM UTC
4315-20403-01 - Time and Material Electrical Contract House of Correction
Contract 1: Electrical
03/25/2020 07:00 PM UTC
P628-17635 - Brown Deer Park Roadway Reconstruction
Contract 1: Roadway Reconstruction (Phase 2) Work consists of reconstructing the circular drive at the boathouse (Segment 03) and the golf course parking lot including new concrete curb and gutter, asphalt pavement, and LED lighting as indicated in the project Bid documents. Pre-Bid Meeting: One Pre-bid meeting will take place on March 18, 2020 at 9:00 A.M., meet at Brown Deer Park Golf Clubhouse, 7625 North Range Line Road, Glendale, WI 53209.
03/25/2020 07:00 PM UTC
P529-17624 - Oak Leaf Trail Bender Park Connector
Contract 1: Trail & Trail Bridge Construction Work consists of constructing approximately three miles of off road bike trail. The majority of the trail will be soft trail (stone surface) with only selected areas being paved with asphalt. Prefabricated steel truss bridges, including the abutments and piers, shall be provided at two locations, and disturbed areas re-vegetated with turf as indicated on project bidding documents. Pre-Bid Meeting: March 5, 2020 at 10:00 A.M., meet at 633 W. Wisconsin Avenue, 7th Floor Room 730, Milwaukee, WI.
03/18/2020 07:00 PM UTC
221 - 230 of 289 Solicitations