General Info

Business Logo

Milwaukee County

600 N Plankinton Ave Ste 600, Milwaukee, WI 53203-2901
(414) 278-4861

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WC0227 - Courthouse Elevator Modernization
The elevators in the Milwaukee County Courthouse need to be modernized. This project addresses the modernization of 5 elevators and associated electrical feed work. Optional Pre-Bid Meeting: Tuesday, 12/16/25 from 2:00pm - 4:00pm. Location: 901 N 9th St, Milwaukee, WI 53233 Room G1
01/27/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
C216-20187: CH Complex Improvements CJF Caulking Phase 2
CONTRACT 1: 1) Phase 2 would consist of 100% sealant joint replacement on the existing façade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish). 2) Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps. Pre-Bid Meeting for CONTRACT-1, Bid Package 1 Takes place on July 14, 2021 at 1:30 PM, 633 West Wisconsin Avenue, Milwaukee, Wisconsin 53203, SEVENTH FLOOR, ROOM 730 – Todd M. Beamer Memorial Training Center
07/21/2021 07:00 PM UTC
O889-20190: Marcus Center For The Performing Arts Pedestrian Pavement Replacement
Contract 1: Pedestrian Pavement Replacement Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents. Pre-Bid Meeting: One Pre-Bid meeting will take place on July 14th, 2021 at 1:00 PM at the Marcus Center (outside under the main entry canopy along North Water Street), 929 N. Water Street, Milwaukee, WI 53202. This will be an in-person meeting, please bring masks and follow COVID guidelines. It is strongly recommended that the contractors attend, but it is not mandatory.
07/21/2021 07:00 PM UTC
9525-21405-04: 2021 Time and Material Zoological Gardens
Contract 4: Electrical
07/14/2021 07:00 PM UTC
9525-21405-05: 2021 Time and Material Zoological Gardens
Contract 5: Fences and Gates
07/14/2021 07:00 PM UTC
9525-21405-06: 2021 Time and Material Zoological Gardens
Contract 6: General Construction
07/14/2021 07:00 PM UTC
9525-21405-07: 2021 Time and Material Zoological Gardens
Contract 7: Metal Fabrication
07/14/2021 07:00 PM UTC
9525-21405-08: 2021 Time and Material Zoological Gardens
Contract 8: Plumbing
07/14/2021 07:00 PM UTC
9525-21405-09: 2021 Time and Material Zoological Gardens
Contract 9: Roofing
07/14/2021 07:00 PM UTC
M051-20160: MPM - North Stairwell Structural Wall Repair - Phase 2
Contract 1: Bid Package 1 1. Water penetration in the stairway vestibule and stairwell has caused corrosion resulting in loss of section properties of the supporting angle. Though not visible, the anchors for this area are suspected for being corroded as well. Cracks in the wall adjacent to the vestibule door are likely due to shifting of the slab above the door and poor placement of reinforcement at the door jamb/header interface. The anchors supporting the mezzanine floor slab above the ground level men's toilet room are failing, likely due to a combination of inadequate embedment of anchors and minor shifting of the slab relative to the north wall. 2. Provide a new structural support for the MacArthur Square slab above stairway vestibule and stairwell. Replacing the existing deteriorated supporting angle as the means of primary structural support. 3. New waterproofing is required of the MacArthur Square slab to stop water penetration into the stairway vestibule and stairwell. 4. To provide a new means of support for the mezzanine floor slab above the ground level Men's Toilet Room. Pre-Bid Meeting: May 10, 2021 at 1:30 P.M at Milwaukee Public Museum, 800 West Wells Street, Milwaukee, WI 53233, Student Lunchroom-Ground Level.
05/19/2021 07:00 PM UTC
P628-17635-03: Brown Deer Park Roadway Reconstruction
Contract 1: Roadway Reconstruction (Phase 3) Work consists of reconstructing the perimeter road (loop drive), west lot, east lot, new share-use path, new on-street perpendicular parking, new concrete curb and gutter, new concrete ribbon, new drainage structures and storm sewer pipes, asphalt pavement, permeable pavers, bio-filtration basins, landscaping, and LED lighting as indicated in the project Bid documents. Pre-Bid Meeting: One Pre-bid meeting will take place on April 28, 2021, at 10:30 A.M., at the Brown Deer Park Golf Clubhouse, 7625 N. Range Line Road, Milwaukee, WI 53209. Meeting will also be available over Microsoft Teams Meeting/call in (by invite only). Request invite via email or phone for Teams Meeting/call in to Clifton Janssen at Clifton.Janssen@milwaukeecountywi.gov or 414-639-8429.
05/12/2021 07:00 PM UTC
211 - 220 of 320 Solicitations
1 2 18 19 20 22 24 25 26 31 32