| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
WA0437 MKE Saver Lot A Rehabilitation
This project provides for the rehabilitation of Saver Lot A (a parking lot approximately 58,000 square yards in surface area) and associated improvements. Work includes asphalt pavement removal, aggregate base rehabilitation, concrete curb and gutter replacement, asphalt pavement construction, pavement marking, signage, erosion control, and turf establishment.
Pre-Bid Meeting: April 23, 2026 at 10:00am. Meet in the Sijan conference room at the General Mitchell International Airport. 5300 S Howell Avenue, Milwaukee, Wisconsin. In-Person optional and teams Link Available upon request. Email jhart@mitchellairport.com
| 05/13/2026 07:00 PM UTC |
|
WA0456 MKE Baggage Handling System Controls Upgrades and Improvements
The replacement of the controls for the both the Inbound and Outbound Baggage Handling System (BHS). Includes other improvements such as replacement of four outbound baggage carousels and other miscellaneous items.
A Mandatory Pre-Bid Meeting will be held at 10:00am on May 13th in the Sijan and Lovell Conference Rooms at the General Mitchell International Airport. 5300 S Howell Avenue, Milwaukee, Wisconsin.
| 06/03/2026 07:00 PM UTC |
|
WA0435 MKE Rental Car Lobby & Bathroom Renovations
Work of the Project includes renovation of the bathroom floor, sinks and walls. Renovation of the Lobby includes floors, lighting, and counters.
Pre-Bid Meeting: Mandatory In-Person Meeting. Friday, May 15, 2026, 10 A.M., Sijan Conference Room at Milwaukee Mitchell International Airport (MKE)
| 06/03/2026 07:30 PM UTC |
| Number | Deadline |
|---|---|
|
9420-20580 - Little Menomonee River Parkway Habitat Restoration: Sections 4 and 5
Habitat restoration within the Little Menomonee River Parkway including reforestation, invasive species removal, grassland restoration and management, forest stand improvement, wetland restoration and sedge meadow restoration.
Project is funded by a Great Lakes Restoration Initiative Grant sub-granted through the Department of Natural Resources to Milwaukee County Parks.
Pre-Bid Meeting: One Pre-bid meeting will take place on October 13, 2021 at 1:00PM. Meeting will be held virtually via Microsoft Teams. Email Project Manager, Natalie Dutack at
Natalie.Dutack@milwaukeecountywi.govfor a link to the meeting.
CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS.
CONTRACTOR SHALL PROVIDE QUALITIFCATIONS AT TIME OF BID. SEE REFERENCE DOCUMENTS 00 20 00 SECTION 21
| 10/27/2021 07:00 PM UTC |
|
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program.
Contract 1: Shared-Use Path Construction
Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding.
Project Completion:
Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022.
Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
| 10/20/2021 07:00 PM UTC |
|
5300-20144 Central Fleet Maintenance HVAC Replacement (Bid Date Extended)
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system
Project Completion/ Substantial Completion Date/Calendar Days: 150 Days
(Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
| 10/20/2021 07:00 PM UTC |
|
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system
Project Completion/ Substantial Completion Date/Calendar Days: 150 Days
(Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
| 10/13/2021 07:00 PM UTC |
|
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring.
Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
| 09/29/2021 07:00 PM UTC |
|
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program.
Contract 1: Trail Construction
Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents.
Project Completion: Work of the project shall be Substantially Complete as follows:
Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022.
Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid.
Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project.
Bids are to be completed online in Bid Express
no later than 2 P.M., September 15, 2021.
Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
| 09/15/2021 07:00 PM UTC |
|
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
| 09/08/2021 07:00 PM UTC |
|
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
| 09/08/2021 07:00 PM UTC |
|
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
| 09/08/2021 07:00 PM UTC |
|
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
| 09/08/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.