Free Solicitations and notifications are free for this business.
Fresno County Department of Public Works and Planning
2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908
Free Solicitations and notifications are free for this business.
2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-J-10 24-J-11 24-J-12 24-J-13
General Building Job Order Contract (Class B)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
A MANDATORY pre-bid conference will be held at 1:00 p.m., on Tuesday, November 19, 2023 for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a contractor’s viewpoint. The MANDATORY pre-bid conference will be held online (the link for which will be posted at https://www.fresnocountyca.gov).
| 12/05/2024 10:00 PM UTC |
24-19-J 24-20-J 24-21-J
General Engineering Job Order Contract (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
A MANDATORY pre-bid conference will be held at 1:00 p.m., on Tuesday, November 19, 2024 for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a contractor’s viewpoint. The meeting will be held online (the link for which will be posted at https://www.fresnocountyca,gov/planholders).
| 12/05/2024 10:00 PM UTC |
PWP24-036
The County of Fresno is seeking qualified consulting firms to provide on-call architectural, engineering and other related services as may be necessary for Public Works Projects. These consulting services include: Assessment Engineering, Certified Access Specialist (CASP) Certification, Cost Estimating Validation, Electrical Engineering, Landscape Architecture, Plumbing and Mechanical Engineering, Qualified SWPPP Developer and/or Practitioner, Surveying, Traffic Engineering, Transportation Planning, Utility Locating, and Water & Natural Resources Engineering.
| 12/13/2024 08:00 PM UTC |
Number | Deadline |
---|---|
22-18-M Crack Seals
The work to be done consists, in general, of 178 lane miles of crack sealing. Several additive locations are proposed for up to 17 lane miles of crack sealing within County Service Areas.
| 01/19/2023 10:00 PM UTC |
22-20-C Dry Creek on Burrough Valley Road Tree Removal
The work, in general, consists of removal and proper disposal of 45 native trees located within the project limits of the Dry Creek Bridge Replacement Project on Burrough Valley Road, just east of Tollhouse Road. All debris generated by the felling and removal of trees must be removed. The roadway must be kept free from debris at all times. Installation of Temporary Fence (Type ESA) may be required prior to beginning onsite work.
The DBE Contract Goal is 0 percent.
Federal Project Number: BRLS-5942(245)
| 12/01/2022 10:00 PM UTC |
22-09-C Ashlan Avenue and Palm Avenue Traffic Signal and Road Improvements
The work to be done consists, in general, of fully replacing the existing traffic signal, removing an existing drain inlet and several trees, and reconstructing the pavement at the intersection of Palm Avenue and Ashlan Avenue. The work will also include cold planing and overlaying, installing four (4) new concrete curb ramps, replacing, and installing the new curb and gutter, installing approximately 140 lineal feet of sidewalk, and signing, striping and pavement marking. The work will also involve coordination with existing utility companies and the City of Fresno. The intersection shall remain open during the entire duration of the project.
The DBE Contract Goal is 20 percent.
Federal Project Number: HSIPL 5942(294)
| 10/13/2022 09:00 PM UTC |
22-14-C Golden State Boulevard Phase 1
The work to be done consists in general of improvements along Golden State Boulevard for approximately 14.1 miles from south of American Avenue to Mission Street in Kingsburg through Cities of Fowler, Selma, Kingsburg, and unincorporated areas of the County. The work will include pavement rehabilitation using an on-site Cold Central Plant Recycling technique, cement-treated base, laying hot-mix asphalt, excavation and trenching, intersection signalization and channelization, installing end terminals and wood post guardrails, striping, pipe installation, sidewalk installation and replacement, installation of street lights, landscaping including tree removals, and other items as specified in the plans and specifications. The project requires a ninety (90) days plant establishment period per Standard Specifications and Special provisions. The plans are divided into three sets, one for each region, however they will be constructed as one project. Intersection and signal work involving Union Pacific Railroad will be bid as Phase 2 of this project at a later time.
| 10/06/2022 09:00 PM UTC |
22-07-C West Park Pedestrian Pathway
The work to be done consists, in general, of installing an asphalt concrete pedestrian pathway, ramps and appropriate signage along Valentine Avenue from the community of West Park to West Park Elementary School. Adjustment of water meter boxes will be required as part of the work. Installation of a pedestrian crossing flashing sign with all appurtenant electrical work including coordination with PG&E Rule 16.
The DBE Contract Goal is 21 percent.
Federal Project Number: ATPSB1L-5942(301)
| 10/06/2022 09:00 PM UTC |
22-10-M Deck Treatments
The work to be done consists, in general, of placing a methacrylate treatment on the bridge decks of eleven (11) Fresno County bridges as part of the Bridge Preventive Maintenance Program. Four (4) bridge decks will also require the placement of a polyester concrete overlay. The existing bridge deck surfaces at these locations are typically concrete, with traffic striping at some locations. The work entails sand blasting the deck surfaces, vacuuming the residue, and placing methacrylate treatment and new striping on the bridge decks only. Where necessary, some bridges will also require the removal of asphalt concrete overlay on the bridge deck, the removal and patching of unsound concrete, and/or the placement of a polyester concrete overlay. Existing deck drainage outlets are to be plugged and forms are to be placed along the edge of the deck to ensure construction materials do not enter the channels or run off the bridge decks.
| 08/31/2022 09:00 PM UTC |
22-02-C American Avenue Shoulder Improvments
Placer Avenue to Madera Avenue
The work to be done consists, in general, of adding approximately four (4) feet of new paved shoulder over aggregate base to each side of American Avenue from Placer Avenue to Madera Avenue (SR145), a distance of approximately 5.9 miles. This will widen the existing 24-foot wide roadway to consist of two 12-foot wide travel lanes with four-foot wide paved shoulders on each side of the roadway. The project also includes striping, installation of signs, installation of asphalt concrete dikes in certain sections of the road and other miscellaneous items as specified in the plans and specification.
The DBE Contract Goal is 25% percent.
Federal Project Number: CML-5942(284)
| 06/16/2022 09:00 PM UTC |
21-13-M Bituminous Seal Coats
The work to be done consists, in general, of furnishing and placing screenings over asphaltic emulsion at various existing roads in Fresno County. The seal coat will be constructed on 22.75 miles of roadway on County roads. County forces will repair, trim, and blade heavy dirt deposits and vegetation from the existing surfacing in advance of construction. Crack sealing will be performed on approximately 36 miles of roadway prior to placing of the seal coat. An additional 6 miles of road of seal coats are included as additive bids.
| 05/05/2022 09:00 PM UTC |
21-S-01 Fresno County Sheriff Substation Bid Package 2
The work to be done consists of a renovation to the existing Sheriff’s Substation and Storage Building, which were recently constructed through Bid Package 1 to include but not be limited to: construction of a new Data Center located within the existing Storage Building, expansion of the existing Electrical Room located in the existing Substation Building, construction of new solar ready vehicle parking canopies. The associated work for these improvements may include mechanical and electrical work in the Data Center and Electrical Room, vehicle charging stations, concrete slabs, concrete pads, interior light gauge metal framing, and storefront glass. The base bid will include the new Data Center and expansion of the existing Electrical Room. The Carport Canopies and EV Charging Stations are included as additive bids.
| 04/14/2022 09:00 PM UTC |
21-09-J, 21-10-J, 21-11-J, 21-12-J General Engineering Job Order Contract (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
A MANDATORY pre-bid conference will be held at 10:00 a.m., on Wednesday, March 16, 2022 for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a contractor’s viewpoint. The meeting will be held online (the link for which will be posted at http://www.co.fresno.ca.us/planholders).
| 04/01/2022 09:00 PM UTC |