General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
01/16/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
20-18-2
US 190 at Brier Lake Dr. Turning Lane, Tammany Trace (Durnin Dr.) ----- The Contractor must provide all adequate and competent labor, equipment, and materials necessary to improve roadway surfaces by milling and overlaying of asphaltic concrete, installation of base course, asphalt paving, and installing roadway striping, as specified along LA HWY 190 at Brier Lake Dr. Turning Lane, Section 33 Township 8S Range 13E and the Tammany Trace (Durnin Dr.), (R11A001) Section 33 Township 8S Range 13E located in Lacombe, Louisiana. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/16/2020 07:00 PM UTC
20-17-2
2020 District 4, 5, 7, Krentel Rd, Krentel Rd Bridge, Stirling Blvd Road Improvements --------- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing, milling and/or overlaying road surfaces as specified along Crapemyrtle Cir (R04A035) Section 21 Township 7S Range 11E Covington ; Crapemyrtle Rd (R04A034) Section 21 Township 7S Range 11E Covington ; Magnolia Ln (R04A036) Section 21 Township 7S Range 11E Covington ; Little Creek Rd (R04F052) Section 29 Township 7S Range 12E Covington ; Wiggins Rd (R04F054) Section 19 Township 7S Range 12E Covington ; Woodlane Dr (R03B003) Section 42 Township 7S Range 11E Covington ; Adele St (R07C055) Section 43 Township 8S Range 13E Lacombe ; Carmel Rd (R04F043) Section 8 Township 7S Range 12E Covington ; Janet St (R07C054) Section 43 Township 8S Range 13E Lacombe ; Lyon Ln (R07H015) Section 32 Township 8S Range 13E Lacombe ; Merino Rd (R07C071) Section 29 Township 8S Range 13E Lacombe ; Shady Pine Rd (R07C017) Section 43 Township 8S Range 13E Lacombe ; Krentel Rd (R07A004) Section 7 Township 8S Range 13E Lacombe ; Krentel Rd Bridge (B07B001) Section 7 Township 8S Range 13E Lacombe ; Stirling Blvd (R01L004) Section 47 Township 7S Range 11E Covington. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/10/2020 07:00 PM UTC
20-13-2
Fishing Pier PH II...………………………..Contractor shall furnish all labor, equipment, tools, supplies, and materials necessary for the development of the offshore fishing pier improvements, in accordance with the design specifications and plans, for the St. Tammany Parish fishing pier located at 54001 East Howze Beach Road, Slidell, LA 70461.
09/09/2020 07:00 PM UTC
20-15-2
Skillet & Kettle - Jail Kitchen -- Contractor shall provide all labor, equipment, tools and materials to perform the following work at the St. Tammany Parish Jail located at 1200 Champagne Street, Covington, Louisiana 70434 (S38-T6S-R11E). All prices must include shipping and installation. Any required labor to install equipment must be included in the price of the equipment. Existing equipment will be disconnected and given to the owner.
08/20/2020 07:00 PM UTC
20-10-2
Black River Dr Bridge ----- The Contractor must provide all labor, equipment, tools, testing and materials required necessary for the removal and replacement of bridge structure, installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/28/2020 07:00 PM UTC
20-9-2
2020 District 8 & 14 Panel Replacements ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as required per the construction drawings and specifications. The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/28/2020 07:00 PM UTC
20-11-2
Hollycrest Blvd - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing, replacing and/or repairing concrete panels as specified along Hollycrest Blvd (R03L114) Section 15 Township 7S Range 11E Covington.
07/22/2020 07:00 PM UTC
20-8-2
Alton Drainage Improvements.....................The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The project location is Alton Subdivision, Slidell, LA (S23-T8S-R14E)
06/25/2020 07:00 PM UTC
20-12-2
Erindale Drainage Phase 2 - The Contractor must provide all labor, equipment, tools, and materials necessary for the removal and installation of drainage structures, concrete curb and drives, and asphalt paving per specifications. The time period for completion of the work is one hundred eighty (180) days from issuance of Notice to Proceed by the Parish.
06/24/2020 07:00 PM UTC
20-7-2
Fairgrounds Phase 3 - The project shall consist of the construction of a concession building (approx. 2,277 sq ft) as an addition to the existing structure. The building shall include a concession stand, offices, storage, restrooms, parking lot and all associated civil site improvements per the plans and specifications. The project shall also include a covered area (approx. 12,170 sq ft) and a wash-down area.
06/24/2020 07:00 PM UTC
371 - 380 of 833 Solicitations
1 2 34 35 36 38 40 41 42 83 84