General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-37-2
Joiner-Wymer Rd------------------------------------ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along Joiner-Wymer Rd (R01G003) Covington, LA.
08/11/2026 07:00 PM UTC
26-25-1
Autumn Wind Ln Drainage-----------------The Parish requests a Contractor to improve drainage by removing and replacing drainpipe and cleaning, shaping, and grading ditches along Autumn Wind Ln, located in Mandeville, LA as required in the specifications.
08/11/2026 07:00 PM UTC
26-26-1
Lake Superior Dr Drainage Repair-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, repairing, and resealing existing pipe joints in the existing subsurface as specified along Lake Superior Dr (R08L047) located in Slidell, Louisiana.
08/11/2026 07:00 PM UTC
26-27-1
Arthur Rd Drainage-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, shaping, and grading existing ditches. As well as installing driveway drain pipes and adding catch basins as specified along Arthur Rd (R03K034) located in Covington, Louisiana.
08/20/2026 07:00 PM UTC
26-28-1
Kelly Dr Drainage----------------------------The Parish requires a contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by construction structural walls and placing material to the eroded slopes to reduce further erosion and improve stability as specified along Kelly Dr (R081005) Slidell, Louisiana.
08/20/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
10/03/2023 07:00 PM UTC
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
10/03/2023 07:00 PM UTC
23-34-1
16th Section Road Drainage-------Contractor must provide all labor, materials, tools, and equipment to remove and replace existing storm drain pipes, catch basins and driveways to improve drainage at 16th Section Road (R06H017; S9-T7-R14) located in Pearl River, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be thirty (30) calendar days from issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/28/2023 07:00 PM UTC
23-36-1
Goldenwood Drainage Repairs - Contractor must provide all labor, materials, tools, and equipment to remove/replace and/or Repair concrete panels, concrete driveway and CB-06 (R08M061; S38-T9-R15) in Slidell, Louisiana. Contractor shall provide all signage and barricades.
09/26/2023 07:00 PM UTC
23-32-1
Turnwood Dr & Kelly Dr Pipe Liner---------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by repairing sinkholes and repairing the eroded pipe located at 503 Turnwood Drive (R03L155) Section 10 Township 7S Range 11E in Covington, Louisiana; 113 Kelly Drive (R08I005) Section 25 Township 8S Range 14E in Slidell, Louisiana. The time period for completion of the project is sixty (60) calendar days from issuance of the NTP by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/21/2023 07:00 PM UTC
23-33-1
Acadian Cir & Charles Dr. Drainage Repair-------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Acadian Cir. (R09E051; S39-T9-R13), and Charles Dr. (R09G041; S38- T9-R14) in Slidell, Louisiana.
09/21/2023 07:00 PM UTC
23-35-1
Dupard Street Drainage------------------------------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Dupard Street (R04D168; S39-T8-R11) in Mandeville, Louisiana, 70448.
09/21/2023 07:00 PM UTC
23-26-2
Covington Library Exterior Renovations -----Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch.The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
09/14/2023 07:00 PM UTC
23-30-1
602 Lake Superior Drive Drainage Repair------Contractor must provide all labor, materials, tools, equipment and supervision necessary to reseal interior joints of the existing 60” subsurface pipe, backfill, remove and reinstall 6’ wooden fence, and slab sodding located at 602 Lake Superior Drive (R08L047; S31-T8S-R15E) in Slidell, Louisiana. The time period for completion of the project is thirty (30) calendar days. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
08/31/2023 07:00 PM UTC
23-32-2
Hawthorne Hallow Bridge----------------------------------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for removal and replacement of existing bridge structure, installation of concrete and asphalt paving, earthwork and road base, and installation of pre-cast concrete box culvert as required per the construction drawings and specifications for Hawthorne Hallow Bridge, located at Hawthorne Hallow, Madisonville, LA
08/23/2023 07:00 PM UTC
331 - 340 of 991 Solicitations
1 2 30 31 32 34 36 37 38 99 100