General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-39-2
Cherry Laurel Dr Drainage--------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by installing, removing, and replacing drainpipe, catch basin, and sod. Work will include asphalt, and patching as specified along Cherry Laurel Dr (R04A032) located in Covington, LA.
09/09/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
23-36-2
Lonesome Rd., Lonesome Rd. Drainage----------------------------------------------- The Contractor shall provide all labor, equipment, materials, and tools necessary for milling and overlaying asphaltic concrete roadways, roadway striping, and drainage improvements as specified along Lonesome Rd. (R04D032) Section 40 Township 8S Range 11E.
10/11/2023 07:00 PM UTC
23-35-2
Pearl River Diversion Canal Restoration------------------------------------------------The work for this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet.
10/11/2023 07:00 PM UTC
23-37-1
Rue Piper Drainage - The Parish requires a Contractor to install catch basins, pipe and rip rap to fix erosion issues at Rue Piper (R08M041; S7-T9-R15) in Slidell, Louisiana.
10/05/2023 07:00 PM UTC
23-39-1
Paradise Court Drainage Repair-----------------------------------------------------------The Parish requires a Contractor to remove/replace culverts that are failing, rotten and causing sinkholes, as well as concrete driveways, to improve drainage located at 216 Paradise Court (R04D154; S27-T7-R11) in Mandeville, Louisiana.
10/04/2023 07:00 PM UTC
23-40-1
Houmas Ct. Drainage---------------------------------------------------------------------The Parish requires a Contractor to remove/replace side drain pipe and remove/replace concrete driveway to improve drainage at 108 Houmas Court (R08E020; S19-T8-R15) in Pearl River, Louisiana 70452
10/04/2023 07:00 PM UTC
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
10/03/2023 07:00 PM UTC
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
10/03/2023 07:00 PM UTC
23-34-1
16th Section Road Drainage-------Contractor must provide all labor, materials, tools, and equipment to remove and replace existing storm drain pipes, catch basins and driveways to improve drainage at 16th Section Road (R06H017; S9-T7-R14) located in Pearl River, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be thirty (30) calendar days from issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/28/2023 07:00 PM UTC
23-36-1
Goldenwood Drainage Repairs - Contractor must provide all labor, materials, tools, and equipment to remove/replace and/or Repair concrete panels, concrete driveway and CB-06 (R08M061; S38-T9-R15) in Slidell, Louisiana. Contractor shall provide all signage and barricades.
09/26/2023 07:00 PM UTC
23-32-1
Turnwood Dr & Kelly Dr Pipe Liner---------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by repairing sinkholes and repairing the eroded pipe located at 503 Turnwood Drive (R03L155) Section 10 Township 7S Range 11E in Covington, Louisiana; 113 Kelly Drive (R08I005) Section 25 Township 8S Range 14E in Slidell, Louisiana. The time period for completion of the project is sixty (60) calendar days from issuance of the NTP by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/21/2023 07:00 PM UTC
331 - 340 of 996 Solicitations
1 2 30 31 32 34 36 37 38 99 100