St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-16-2
Rosedown Way Drainage Phase 2--------------
The Contractor shall provide all labor, equipment, tools, testing, and materials
necessary to complete drainage improvements in accordance with the construction
plans and specifications for the Rosedown Subdivision, located in Mandeville,
Louisiana, 70471. The work includes replacement of existing drainage
infrastructure along Camden Court, construction of a new concrete-lined channel
to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all
incidental work, such as replacement of concrete street panels, sidewalks, and
driveways, utility relocations, installation of sewer and water conflict boxes, and
placement of rip rap at the outfall.
| 04/14/2026 07:00 PM UTC |
|
26-18-2
2026 District 7 Road Improvements-------------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying road surfaces along various District 7 Parish roads.
| 04/14/2026 07:00 PM UTC |
|
26-19-2
2026 District 2, 3 Road Improvements----------
The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and overlaying, patching, and reconstructing road surfaces as specified along various District 2 and District 3 Parish roads.
| 04/14/2026 07:00 PM UTC |
|
26-22-2
Emergency Fuel Services--------------------------
The St. Tammany Parish Government (Parish) is seeking a qualified vendor to establish a standby contract for emergency fuel supply and distribution services to be utilized during declared emergency events.
| 04/21/2026 07:00 PM UTC |
|
26-21-2
2026 District 6, 8, 9 Road Improvements------
The Contractor must provide all adequate and competent labor, equipment, tools,
testing, and materials necessary to improve roadways by milling and/or overlaying
road surfaces as specified along various District 6, 8, and 9 Parish roads.
| 04/28/2026 07:00 PM UTC |
|
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
| 05/05/2026 07:00 PM UTC |
|
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
| 05/14/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
23-8-1
Safe Haven HVAC Controls - Quad B ---------------Contractor is to provide all labor, equipment, tools, and materials necessary to evaluate our current Building Automation System (BAS), utililizing ASI controls to extend BAS into Quad B Building at our Safe Haven Campus located at 23515 Hwy 190, Mandeville, LA 70470.
Contractor must ensure all air handler units/HVAC system in Quad B Building are automated to the extent that currently exists within Quad A Building automated air handler units/HVAC
system.
There is a mandatory site visit and a representative will provide access to the BAS to evaluate current configurations at the BAS computer/server and all HVAC/air handler units/thermostats/VAVs as required throughout Quads A and B Buildings.
Contractor is required to complete the work within 90 days from the Notice to Proceed issued by the managing department.
| 04/18/2023 07:00 PM UTC |
|
23-13-1
Emergency Electrical Service---------------------------------------Provider will provide electrical services during an emergency event at Parish Facilities throughout the Parish. This is a standby contract; service will be on an “as needed” basis.
| 04/12/2023 07:00 PM UTC |
|
23-19-2
Caroline Ct, Louis Prima Dr, Park Place Dr, Falconer Dr------The Contractor shall provide all labor, equipment, and material necessary to improve the roadway surface by milling and overlaying 4,500 total feet with asphaltic concrete and installing new striping. Caroline Ct, Louis Prima Dr, and Park Place will undergo a drainage exploration to assess the state of the drainage structures, repair disconnected joints, and leaking catch basins, as specificed along Caroline Ct (R03L142), Louis Prima Dr (R03L143), Falconer Dr (R03L161), and Park Place (R03L171) IN Section 15 Township 7S Range 11E.
| 04/11/2023 07:00 PM UTC |
|
23-11-2
2023 District 6,11 Road Improvements - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying, and patching road surfaces as specified along John Provost Rd (R06F010) Section 39 Township 7S Range 14E Pearl River ; Lee Rd (R02W005) Section 27 Township 5S Range 11E Covington ; Lenel Rd (R10C007) Section 17 Township 6S Range 12E ; Lowe Davis Rd (R10C004) Section 15 Township 6S Range 12E Covington ; Loyd Rd (R02P018) Section 16 Township 5S Range 11E Covington ; Pete Richardson Rd (R06A011) Section 10 Township 6S Range 13E Bush ; Watts Rd (R05E023) Section 28 Township 5S Range 13E Bush ; Camp Villere Rd (R09D012) Section 37 Township 9S Range 14E Slidell ; Charles Anderson Rd (R06G014) Section 27 Township 7S Range 14E Pearl River ; Kay Dr (R09C001) Section 34 Township 8S Range 14E Lacombe ; P Kennedy Rd (R06G016) Section 27 Township 7S Range 14E Pearl River ; Sticker Bay Rd (R06M003) Section 28 Township 7S Range 13E Lacombe ; Torres Dr West of Spruce (R07C043) Section 34 Township 8S Range 13E Lacombe ; Torres Dr East of Spruce (R09C003) Section 34 Township 8S Range 14E Lacombe.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 04/11/2023 07:00 PM UTC |
|
23-18-2
Penn Mill Road - Horse Branch - The Contractor shall provide all labor, equipment, and material necessary to improve the roadway surface by milling and overlaying 18,000 feet of asphaltic concrete and installing roadway striping. The intersection of Penn Mill Rd and State Highway 190 will undergo widening for the addition of a right-hand turn lane, as well as the addition of subsurface drainage on both sides of the widened road, as specified along Penn Mill Rd (R03D007) Section 23-25, 30 Township 6S Range 10E – 11E and Horse Branch Rd (R03D011) in Section 13-14, 23 Township 6S Range 10E.
| 04/05/2023 07:00 PM UTC |
|
23-12-1
Council Office Renovations - Building A------The Parish requires a Contractor to provide all labor, materials and equipment to remove and replace carpet, interior repainting, and vinyl floor removal and replacement as specified in the areas located at Building A Council Office and Conference Room 21490 Koop Drive, Mandeville, LA 70471.
| 04/05/2023 07:00 PM UTC |
|
23-4-1
Safe Haven Gutters - Quads A, B, C & G ------------ Contractor must provide all labor, equipment, tools and materials necessary to perform the required work on gutters on Quads A, B, C and G at the Safe Haven Campus located at 23363 Robin Road, Mandeville, LA 70470.
Contractor is to evaluate a section of existing aluminum gutters that have already been installed on a Quad A Building.
Contract is to provide a cost estimate to remove any existing copper gutters on Quads A, B, C and G buildings and install new aluminum gutters on Quads A, B, C and G buildings that are the same or nearly match existing installed aluminum gutters in color and material.
A site visit is required and a representative will provide access to existing gutter to evaluate all roof areas of Quads A, B, C and G.
| 04/05/2023 07:00 PM UTC |
|
23-7-1
Ashton Oaks Drainage Repair------The Parish requires a Contractor to remove and replace concrete panels and concrete driveway, reseal catch basin and sodding located at 476 East Redbud Dr (R08I080; S26-T8-R14); 300 Ironwood Dr (R08I082; S26-T8-R14); 508 JP Court (R08I092; S26-T8-R11)
in Slidell, Louisiana.
| 04/04/2023 07:00 PM UTC |
|
23-14-2
2023 District 1,4,5,10 Road Improvements-----------------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces, and improving the turning radius as required in the specifications along District 1,4,5, & 10 Parish roads.
| 04/04/2023 07:00 PM UTC |
|
23-15-2
2023 District 12,13,14 Road Improvements------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as required in the specifications along District 12,13 & 14 Parish roads.
| 04/04/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.