General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-37-2
Joiner-Wymer Rd------------------------------------ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along Joiner-Wymer Rd (R01G003) Covington, LA.
08/11/2026 07:00 PM UTC
26-25-1
Autumn Wind Ln Drainage-----------------The Parish requests a Contractor to improve drainage by removing and replacing drainpipe and cleaning, shaping, and grading ditches along Autumn Wind Ln, located in Mandeville, LA as required in the specifications.
08/11/2026 07:00 PM UTC
26-26-1
Lake Superior Dr Drainage Repair-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, repairing, and resealing existing pipe joints in the existing subsurface as specified along Lake Superior Dr (R08L047) located in Slidell, Louisiana.
08/11/2026 07:00 PM UTC
26-27-1
Arthur Rd Drainage-----------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by cleaning, shaping, and grading existing ditches. As well as installing driveway drain pipes and adding catch basins as specified along Arthur Rd (R03K034) located in Covington, Louisiana.
08/20/2026 07:00 PM UTC
26-28-1
Kelly Dr Drainage----------------------------The Parish requires a contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by construction structural walls and placing material to the eroded slopes to reduce further erosion and improve stability as specified along Kelly Dr (R081005) Slidell, Louisiana.
08/20/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
015-60-17-16-2
Windshield Repair/ Replacement
03/23/2017 07:00 PM UTC
316-00-17-11-2
Cross Gates Pond Improvements................................. This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
03/21/2017 07:00 PM UTC
306-00-17-09-2
2017 District 6 Road Improvements..................................... This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
03/15/2017 07:00 PM UTC
309-00-17-08-2
2017 District 9 Road Improvements---------------This is a District Capital Road Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Audubon St (R08G009) Section 31 Township 8S Range 15E; Autumn Lakes Rd (R08N097) Section 38 Township 9S Range 15E; Blackbeard Dr (R08N043) Section 17 Township 9E Range 15E; Doubloon Dr (R08N042) Section 17 Township 9S Range 15E; Pearl River St (R08N014) Section 38 Township 9S Range 15E; Waverly Dr (R08L068) Section 38 Township 9S Range 15E; and Walnut St (R08G002) Section 31 Township 8S Range 15E.
03/14/2017 07:00 PM UTC
310-00-17-07-2
2017 Districts 5 & 10 Road Improvements This is a District Capital Road Improvement Project for Districts 5 & 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Strain Rd (R04F001) Section 19 Township 7S Range 12E ; America St (R04E331) Section 38 Township 8S Range 11E ; and Orleans St (R04E129) Section 38 Township 8E Range 11E.
03/13/2017 07:00 PM UTC
300-00-16-70-2
Oak Harbor Road Elevation ................................................This project includes removing and replacing roadway pavement, raising the levee and roadway, hydro-seeding, installation of new drainage pipe and structures, incidental clearing, and other related work.
03/01/2017 08:00 PM UTC
015-25-17-02-2
Road Materials
02/21/2017 08:00 PM UTC
403-09-16-59-2
Fishing Pier Phase II Offshore
02/14/2017 08:00 PM UTC
015-05-17-05-2
Road Signs
02/09/2017 08:00 PM UTC
741 - 750 of 991 Solicitations
1 2 71 72 73 75 77 78 79 99 100