General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
416-10-17-18-2
Bayou Chinchuba Phase 2 ---------- Excavation of a 10-ft deep wet pond within an existing dry pond and installation of an aeration system, including electrical service from the main line along the St Tammany Trace to and for the wet pond aeration system. A temporary construction entrance is required through an established construction servitude from Hwy 59 westward to the site, along with other erosion control measured as necessary to prevent migration of sediment into waterways and onto roadways
05/02/2017 07:00 PM UTC
123
THIS IS A TEST PROJECT ONLY
04/27/2017 03:50 PM UTC
622-04-17-31-2
1.7 Meter Belt Filter Press
04/26/2017 07:00 PM UTC
302-00-17-20-2
2017 District 2 Road Improvements ----- This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Arthur Rd (R03K034) Section 42 Township 6S Range 11E; Jenkins Ave (R03K061) Section 42 Township 6S Range 11E; Kustenmacher Rd (R03K020) Section 36 Township 6S Range 11E; Schiro Rd (R03G004) Section 2 Township 6S Range 11E; and St. Joseph Rd (R03G002) Section 2 Township 6S Range 11E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is 60 calendar days from the date the Notice to Proceed is issued.
04/25/2017 07:00 PM UTC
314-00-17-27-2
2017 Districts 8, 12, 13 & 14 Road Improvements...........This is a District Capital Road Improvement Project for Districts 8, 12, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Hunters Creek Rd (R08I010) Section 25 Township 8S Range 14E; El Centro St (R09J096) Section 22 Township 9S Range 14E; Park Place (R09J051) Section 44 Township 9S Range 14E; Indian Village Dr (R08P007) Section 15 Township 9S Range 15E; Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E; Ondine Ln (R09J032) Section 33 Township 9S Range 14E; Aviator St (R09D047) Section 3 Township 9S Range 14E; and James Crosby Rd (R08A012) Section 11 Township 8S Range 14E.
04/25/2017 07:00 PM UTC
304-00-17-26-2
Del Oaks Drive & Roger Storme Rd Road Improvements...........This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by raising the elevation of approx. 450 lf of roadway on Del Oaks by approx. 6.5 ft, and raising the elevation of approx. 400 lf of roadway on Roger Storme by approx. 6.5 ft, work to also include removal of trees, replacement of driveway aprons, and modifications for tie-ins as specified along Del Oaks Dr (R04A047) Section 54 Township 7S Range 11E ; Roger Storme (R04A001) Section 54 Township 7S Range 11E.
04/25/2017 07:00 PM UTC
300-00-17-13-2
Francis Rd Extension............................................... Clearing and grubbing, grading, drainage structures, cold planning asphaltic concrete, class II base course, superpave asphaltic concrete overlay, asphalt concrete pavement roadway and shoulders, open channel ditches, asphaltic shared use path, striping, signing, and related work.
04/18/2017 07:00 PM UTC
318-00-17-12-2
Safe Haven Renovations Quad A Asbestos Abatement ----- The abatement of ACM (floor tile, drywall walls and drywall ceilings) and the selected demolition of millwork and other building components, per the plans and specifications (Attachment “A”). All demolition activity shall follow the applicable, federal, state, and local guidelines and regulations. Contractor shall be responsible for removal, transportation and disposal of the demolition debris in accordance with all applicable federal, state and local regulations governing demolition and the demolition of structures containing hazardous substances. Project requires a Building Construction License and Hazardous Materials License. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. Contract time shall be 45 calendar days from the date of notice to proceed. All labor, supervision, materials, services, supplies, equipment, permits, transportation and disposal fees required to complete the work, per the plans and specifications (Attachment “A”), shall be included in the lump sum bid.
04/18/2017 07:00 PM UTC
010-07-17-29-2
2017 Official Journal
04/13/2017 07:00 PM UTC
010-01-17-25-2
SUV Chevrolet Suburban
04/13/2017 02:39 PM UTC
711 - 720 of 978 Solicitations
1 2 68 69 70 72 74 75 76 97 98