General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-3-2
One Time Purchase for Water and Sewer Materials ---- St. Tammany Parish Government, Department of Utilities is seeking bids for a one (1) time purchase of water and sewer materials. The Parish reserves the right to ward items as “grouped” or on an all-or-none basis and to reject any or all bids and waive informality. All products shall be new and of current manufacture. Where specified on the bid sheets, prices shall be for the approved brand or a “prior approved equivalent” by the Parish. The unit price bid shall for materials shall include F.O.B. All products shall be new and of current manufacture. Where specified on the bid sheets, prices shall be for the approved Make/Brand or a Prior Approved Equal by the Parish. Where the specifications do not indicate an Approved Make/Brand for an item, the Parish has no preference. The name of any manufacturer mentioned in the specifications is for the purpose of establishing a minimum acceptable standard of quality desired by the Parish. All products bid must have prior approval as "Prior Approved Equivalents". All fields must be filled in. NO blanks will be permitted. If the item is unavailable, please enter N/A. "Price/Each" shall represent the cost for the specified item as well as any delivery charge (if applicable) to the location(s) indicated in this bid.
02/10/2026 08:00 PM UTC
26-6-1
619 Plantation Blvd Pipe Liner--------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to clean and install a CIPP Liner through the existing pipe to improve drainage as specified along Plantation Blvd (R04D129) located in Mandeville, Louisiana.
02/12/2026 08:00 PM UTC
26-4-2
Area 1 Panel & Curb Replacement---------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to remove and replace concrete panels and concrete rollover and barrier curbs in order to improve roadway conditions, as specified, along Palm Ct (R01J091) Madisonville ; Coconut Palm Dr (R01J092) Madisonville ; Del Sol Ct (R01E025) Covington ; Del Sol E (R01E026) Covington ; Del Sol Pass (R01E024) Covington ; Del Sol W (R01E027) Covington ; Covington Meadow Cir (R03L160) Covington, Louisiana.
03/03/2026 08:00 PM UTC
26-5-2
Hickory Area Drainage Maintenance------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing drain pipes, catch basins, and improving the turning radius as specified along the following Parish roads: • Blueberry Lp (R06H009) Pearl River, LA; • E Ridgewood Dr (R06H007) Pearl River, LA; • Mockingbird Lp (R06H010) Pearl River, LA; • Silas Thomas Rd (R06H006) Pearl River, LA; and • W Ridgewood Dr (R06H008) Pearl River, LA
03/04/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
010-35-16-62-2
Fuel & Oil
12/29/2016 08:00 PM UTC
015-60-16-66-2
Windshield Repair/ Replacement
12/29/2016 08:00 PM UTC
015-80-16-60-2
Trace Bridge Repairs - The Contractor must provide all labor, materials, equipment and supervision necessary to remove and replace decayed timber piles, stringers, and bent caps. The work is to include all necessary cribbing, jacking and supports required to hold up deck and all galvanized connectors, as well as all hardware required to install materials. Timber is to be replaced.
12/09/2016 08:00 PM UTC
314-00-16-55-2
Voters Rd. - Curve to Allen Rd. Mill and Overlay ----- This is a 2016 Capital Road Improvement Project for District 13 and District 14. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying and improve drainage by installing subsurface drainage as specified along Voters Rd (R08V002) Section 24 Township 9S Range 14E.
10/18/2016 07:00 PM UTC
015-45-16-58-2
2016 DPW Maintenance Overlays Phase 2 The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2 inch asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12 inch patching and 1.5 inches cold planing as specified. See specifications attached for: 9th Street (R04A038); 11th Street (R04A003); Brookside (R04D035); Cody Lane (R02O028); Fincher Road (R05E016); Green Court (R04E162); La Salle Street (R04D059); Le Cirque (R01J073); Meadow Court (R04E160); Nelson Road (R05F018); Passman Road (R03F031); Prairie Court (R04E164); Raehyo Lane (R03E013); Ridge Court (R04E163); Rue Mon Jardin (R01J070); St. Ann Street (R03J035); Trail Court (R04E159); Walker Street (R03J034); and Ward Road (R05E015).
10/18/2016 07:00 PM UTC
312-00-16-56-2
2016 District 12 Road Improvements ----- This is a 2016 Capital Road Improvement Project for District 12. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with a 2” mill and overlaying, and removing and replacing concrete panels as specified along Behrman Street (R08U015) Section 23 Township 9S Range 14E ; and Bosworth Street (R08U020) Section 23 Township 9S Range 14E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/28/2016 07:00 PM UTC
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1 ------ The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016). The time period for completion of the project is 90 calendar days + calculated rain days. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/27/2016 07:00 PM UTC
301-00-16-51-2
2016 District 10 Road Improvements.......This is a 2016 Capital Road Improvement Project for District 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with milling and overlaying, overlaying, and adding pavement striping along Coffee Street (R04D047) Section 39 Township 8 South Range 11 East; Dupard Street (R04D168) Section 39 Township 8 South Range 11 East; and Lafitte Street (R04D050) Section 39 Township 8 South Range 11 East.
09/23/2016 07:00 PM UTC
324-00-16-52-2
Waste Water Treatment and Control - Public Works Wash Racks
09/20/2016 07:00 PM UTC
313-00-16-50-2
2016 District 13 Road Improvements.........This is a 2016 Capital Road Improvement Project for District 13. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with asphalt overlays on Faciane Lane (R09H022) Section 38 Township 9S Range 14E ; Coin Du Lestin Dr. (R09H025) Section 38 Township 9S Range 14E.
09/13/2016 07:00 PM UTC
711 - 720 of 941 Solicitations
1 2 68 69 70 72 74 75 76 94 95