General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
26-42-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
10/14/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
310-00-17-42-2
Marigny Avenue Drainage Improvements........................ The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, and performing drainage excavation on Marigny Avenue (R04E115) Section 38 Township 7 South Range 11.
06/14/2017 07:00 PM UTC
300-00-17-36-2
Dove Park Rd. Mill and Overlay ---------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
06/13/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/08/2017 07:00 PM UTC
315-05-17-38-2
2017 District 6 Road Improvements ---------- This is a District Capital Road Improvement Project for District 6. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing road surfaces, as specified, along Sunny Meadow Dr (R10F003) Section 28 Township 6S Range 12E ; and Keen Rd (R10F002) Section 28 Township 6S Range 12E.
06/06/2017 07:00 PM UTC
313-00-17-41-2
Ranch Rd. Drainage Ph 1...... The Contractor will provide all labor, equipment, tools, and materials necessary to improve drainage by the removal of existing drainage structures and drives and for the installation of drainage structures, drives, and pavement patching.
06/06/2017 07:00 PM UTC
300-00-17-40-2
Tchefuncte Parc Bridge at Black River.....The Contractor must provide all labor, equipment, tools, and materials necessary for the removal of timber trestle bridge on timber piles, asphalt paving, installation of class II base course, prcb culvert, concrete headwalls, and incidental sanitary sewer relocation.
05/31/2017 07:00 PM UTC
622-10-17-34-2
Sewer and Appurtenances Annual
05/17/2017 07:00 PM UTC
302-00-17-32-2
Woodland Dr Road Improvements.......................................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing the road surface and applying an asphalt reinforcement grid, as specified.
05/16/2017 08:02 PM UTC
300-00-17-30-2
Clipper Drive Bridge..... The Contractor will provide all labor, equipment, tools, and materials necessary for the demolition of a single span slab span bridge and retaining walls and construction of a precast 3-span slab span bridge and sheet pile retaining walls, and all associated earthwork. The work includes riprap, concrete approach slabs, concrete approach pavement with class II base course and guardrails.
05/09/2017 07:00 PM UTC
310-00-17-33-2
2016 District 10 Road Improvements ---------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing road surfaces as specified. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time for completion is forty-five (45) days from the date specified in the Notice to Proceed + Calculated Rain Days per the attached specifications.
05/09/2017 07:00 PM UTC
721 - 730 of 1000 Solicitations
1 2 69 70 71 73 75 76 77 99 100