General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements - This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
04/12/2017 07:00 PM UTC
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/11/2017 07:00 PM UTC
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
015-60-17-16-2
Windshield Repair/ Replacement
03/23/2017 07:00 PM UTC
316-00-17-11-2
Cross Gates Pond Improvements................................. This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
03/21/2017 07:00 PM UTC
721 - 730 of 978 Solicitations
1 2 69 70 71 73 75 76 77 97 98