General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10016.1
Structure Replacement Bridge No. 09-0066 McGeorge Rd over Alex Branch Forest District 09, Moshannon State Forest Lawrence Township, Clearfield County, Pennsylvania This project consists of demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying McGeorge Road over Alex Branch and replacement with a single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, DSA approach roadway, and guide rail. DGS Small Business Certification Required Engineer's Estimate: $300,000-$550,000
09/25/2025 05:00 PM UTC
FDC-016-10759.1
Structure Replacements & Preservation Bridge A: No. 16-0043 Landrus Road OVER UNT to Babb Creek Bridge B: No. 16-0044 Landrus Road over Bear RUN Bridge C: No. 16-0045 Landrus Road over Silver Run Forest District 16, Tioga State Forest Bloss Township, Tioga County, Pennsylvania This project is the replacement two corrugated metal pipe culverts and a preservation of a corrugated metal pipe culvert along Landrus Road. Bridge A replacement will consist of a corrugated galvanized steel pipe arch culvert with flared concrete end sections. Bridge B replacement will consist of an integral abutment bridge with a composite prestressed concrete spread box beam superstructure. Bridge C preservation will consist of paving the invert/flowline of the pipe to eliminate further pipe invert deterioration and loss of bearing material beneath the pipe invert and placement of riprap for scour protection. SDB Participation Goal: 21% VBE Participation Goal: 3% Engineer's Estimate: $1,000,000-$ 2,000,000
09/25/2025 05:00 PM UTC
FDC-015-10031.1
Structure Replacement Bridge No. 15-9006 Horton Run Road Over UNT to Horton Run Forest District 15, Wharton Township, Potter County Pennsylvania Demolition of the existing structure consisting of a single span reinforced concrete slab superstructure supported on stone masonry abutments. This structure will be replaced a precast reinforced concrete box culvert with a precast reinforced concrete end section (downstream) and two precast reinforced concrete wingwalls (upstream). DGS Small Business Certification Required Engineer's Estimate: $350,000-$550,000
09/25/2025 05:00 PM UTC
FDC-009-10014.1
Structure Replacement, Bridge A No. 09-0062, Wallace Mine Road Over UNT to Alex Branch, Bridge B No. 09-0065, Wallace Mine Road Over UNT to Trout Run, Forest District 09, Moshannon State Forest, Lawrence & Goshen Townships, Clearfield County, Pennsylvania Bridge A: replacement of a corrugated metal pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. Bridge B: replacement of a smooth wall corrugated high-density polyethylene pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. DGS Small Business Certification Required Engineer's Estimate: $100,000.00 - $500,000.00
10/09/2025 05:00 PM UTC
FDC-013-10029.1
Structure Replacements, Bridge No. 13-0078, Simons Lane Over Bender Run, Bridge No. 13-0079, Simon Lane Over Portable Run, Forest District 13, Elk State Forest, Shippen Township, Cameron County, Pennsylvania This project will replace two (36” and 48” diameter) corrugated metal pipe culverts on Simons Lane. The existing culverts are both undersized, misaligned with their respective stream channel, and are in poor condition or collapsing. The proposed replacement structures are 6’-0” and 12’-0” precast reinforced concrete box culverts and end sections. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-007-10055.1
Structure Replacement, Bridge No. 07-9011, Pine Creek Hollow Road Over UNT to Pine Creek, Forest District 07, Bald Eagle State Forest, Haines Township, Centre County, Pennsylvania This project consists of the demolition of existing corrugated metal pipe arch structure and stone wingwalls and replacement with a precast reinforced concrete rigid frame. Other work includes rock lining, channel lining, architectural surface treatment, guide rail and driving surface aggregate (DSA) approach roadway. DGS Small Business Certification Required Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-326-10983.1
Iron Master's Mansion Rehabilitation, Susquehanna Riverlands State Park, Hellam Township, York County, Pennsylvania Rehabilitate the Iron Master's Mansion exterior shell and do selective demolition on the interior of the building. SDB Participation Goal 13% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
10/09/2025 05:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-220-10119.1
Building Rehab- Replace Roof on Public Safety Building Presque Isle State Park Millcreek Township, Erie County, Pennsylvania Project Description Work included under this Contract consists of the removal and disposal of existing Public Safety Building roof, furnish and install 8,170 ft2± of new EPDM roof and appurtenances including: EPDM rubber roof system, insulation, fascia boards – treated, fascia trim wrap – aluminum trim coil, and all required fasteners and roof penetration boots or sealants. DGS Small Business Certification Required Engineer's Estimate: $50,000- $100,000
10/31/2024 06:00 PM UTC
FDC-114-11363.1
Little Pine Residence Well 2024 Little Pine State Park Gallagher Township, Clinton County, Pennsylvania Install and develop one (1) new well for domestic drinking water use with a sustainable household yield and connect to the existing storage, treatment, and distribution system. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
10/31/2024 06:00 PM UTC
FDC-012-10769.1
Project Name: Structure Bearing Replacements for Pine Creek Rail Trail Tioga and Tiadaghton State Forests Brown Township, Lycoming County McHenry Township, Lycoming County Delmar Township, Lycoming County Lycoming And Tioga Counties, Pennsylvania Project Description a. All site work required for project preparation, execution and completion. b. All measures to protect trail users. c. Installation of stream diversions, erosion, and sediment controls to facilitate the bearing replacement. d. Excavation required to facilitate the jacking and bearing replacement. e. Design, install and jack or lift the bridges to facilitate the bearing replacement. f. Perform substructure deteriorated concrete repairs. g. Removal of timber bearings and installation of new concrete or steel pedestals, including all surveying, bearing pads, anchor bolts, and soles plates. Replacement of timber backwalls as indicated. h. Restoration of site to original condition, including grading of trail adjacent to the bridge as required.   SDB Participation Goal: 6% VBE Participation Goal: 3% Engineer's Estimate: $ 500,000- 1 Million
10/17/2024 06:00 PM UTC
FDC-007-103149.1
Deck Replacement, Bridge No. 07-0066 Penns Creek Trail Over Penns Creek Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania Project Description: This project consists of construction of a new deck, railings and bollards for bridge no. 07-0066, Penns Creek Trail Bridge over Penns Creek. The bridge approaches will also be modified as necessary to tie into the new deck elevation. Other work includes in stream timber debris removal. DGS Small Business Certification Required Engineer's Estimate: $100,000 -$500,000
10/10/2024 06:00 PM UTC
FDC-418-103139.1
Pavement Rehabilitation of Multiple Roadworks and Trail Marsh Creek State Park Wallace & Upper Uwchlan Townships, Chester County, Pennsylvania The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of Marsh Creek West Park Road, Milford Road, Chalfont Road Boat Launch, and Park Trail Road as specified in the plan located within Marsh Creek State Park, Wallace & Upper Uwchlan Townships in Chester County. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: $400,000-$800,000
10/03/2024 06:00 PM UTC
FDC-005-103280.1
Bridge Maintenance (6 Bridges) Forest District 5, Rothrock State Forest West, Jackson, & Todd Townships Huntingdon County, Pennsylvania This project is for the maintenance repair or rehabilitation of six existing structures throughout the Rothrock State Forest. The proposed work includes: • The maintenance repair for Bridge A on PA Furnace Road includes repairing underpinning along the near abutment using a concrete collar and rock scour protection; cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; rebuilding a stone masonry wingwall; and replacing portions of the guiderail along the approach. • The rehabilitation for Bridge B on Pine Swamp Road will replace the existing superstructure with a steel I-beam bridge superstructure, including a nail laminated timber deck, timber curbs and structure mounted guiderail. The maintenance repairs for Bridge B also includes new concrete for beam seats, backwalls, cheekwalls, wingwall caps and concrete collars along the abutments; repointing existing stone masonry joints; and installing a new structure waterproofing and foundation drainage system. • The maintenance repair for Bridge C on Stone Creek Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; recaulking joints; and replacing portions of the guiderail along the approach. • The maintenance repair for Bridge D on Seeger Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; and recaulking joints. • The maintenance repair for Bridge E on Diamond Valley Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; repointing existing stone masonry joints; and crack sealing on the asphalt roadway. • The maintenance repair for Bridge F on Trough Creek Drive includes cleaning, blasting, and repainting the steel floorbeam system; replacing existing deck connection hardware and retorquing hanger connections; retreating the existing glu-laminated timber arches and sidewalks; removing/reinstalling the membrane waterproofing and asphalt over the deck including repaving the approach roadway; and replacement of the approach guiderail. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: Over $1M
10/03/2024 06:00 PM UTC
FDC-010-103277.1
Structure Replacement Bridge A - No. 10-0001, Graham Road Over Graham Run Bridge B - No. 10-0002, Graham Road Over East Ferney Run Roadway Rehabilitation Graham Road Forest District 10, Sproul State Forest Colebrook Township Clinton County, Pennsylvania Replace 2 structures with P/S Concrete Plank Beam bridge, and Precast Concrete Box Culvert. In addition, construction of a slide repair and placement of driving surface material on Graham Road. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: Over $1M
09/19/2024 06:00 PM UTC
FDC-011-10059.1
Structure Replacement Bridge No. 5111-0014 Bear Creek Blvd over Laurel Run Forest District 11, Pinchot State Forest Plains Township, Luzerne County, Pennsylvania Project Description: a. All site work to suit project preparation, execution, and completion. b. Partial demolition of the existing structure carrying Bear Creek Blvd over Laurel Run consisting of a 45’-0” long x 35’-0” wide Reinforced Concrete T Beam bridge. This structure will be replaced with a Single Span Composite Prestressed Concrete Spread Box Beam Superstructure atop Cast-in-Place Reinforced Concrete Cantilever Abutments that will provide a 18’ clear roadway width between the Structure Mounted Guide Rail barriers. The existing bridge substructure will be demolished to Elevation 1022.00 and the new bridge will span past the existing abutments and wingwalls. Replacement includes driving surface aggregate, rock lining, and architectural surface treatment. c. Construction of structure mounted guide rail barrier, measured from end of structure to end of structure. d. Construction of approach guide rail including: 12’-6” Type 31-S Guide Rail with 37’-6” Turned Down End Treatments at all four (4) corners. SDB Participation Goal: 6 % VBE Participation Goal: 3 % Engineer's Estimate: $ 800,000 - $ 1 Million
09/19/2024 06:00 PM UTC
FDC-007-10056.1
Structure Replacement, Bridge No. 5107-0056 Poe Paddy Drive Over Swamp Run Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania The proposed project includes a structure replacement of Poe Paddy Drive over Pine Swamp Run. It will be replacing the existing reinforced concrete slab structure with a precast reinforced concrete arch culvert at the same location as the existing structure. The proposed structure will provide two lanes of unopposed traffic as well as adequate barrier and approach guide rail updates where necessary. DGS Small Business Certification Required Engineer's Estimate: $500,0000 - $1M
09/19/2024 06:00 PM UTC
FDC-009-103274.1
Structure Replacement, Bridge No. 09-0053 Claymine Road Over Corbin Run Forest District 9, Moshannon State Forest Rush Township, Centre County, Pennsylvania This project will replace a partially collapsed 36” diameter corrugated metal pipe culvert on Claymine Road. The existing culvert is significantly undersized to provide the flow capacity necessary for the large upstream drainage area, which includes a significant amount of surface water runoff from the Mid-State Regional Airport runways. The proposed replacement structure is a precast concrete spread box beam superstructure supported by an integral abutment substructure. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
09/19/2024 06:00 PM UTC
81 - 90 of 199 Solicitations