FDC-009-10016.1
Structure Replacement Bridge No. 09-0066 McGeorge Rd over Alex Branch Forest District 09, Moshannon State Forest Lawrence Township, Clearfield County, Pennsylvania This project consists of demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying McGeorge Road over Alex Branch and replacement with a single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, DSA approach roadway, and guide rail. DGS Small Business Certification Required Engineer's Estimate: $300,000-$550,000
09/25/2025 05:00 PM UTC
FDC-016-10759.1
Structure Replacements & Preservation Bridge A: No. 16-0043 Landrus Road OVER UNT to Babb Creek Bridge B: No. 16-0044 Landrus Road over Bear RUN Bridge C: No. 16-0045 Landrus Road over Silver Run Forest District 16, Tioga State Forest Bloss Township, Tioga County, Pennsylvania This project is the replacement two corrugated metal pipe culverts and a preservation of a corrugated metal pipe culvert along Landrus Road. Bridge A replacement will consist of a corrugated galvanized steel pipe arch culvert with flared concrete end sections. Bridge B replacement will consist of an integral abutment bridge with a composite prestressed concrete spread box beam superstructure. Bridge C preservation will consist of paving the invert/flowline of the pipe to eliminate further pipe invert deterioration and loss of bearing material beneath the pipe invert and placement of riprap for scour protection. SDB Participation Goal: 21% VBE Participation Goal: 3% Engineer's Estimate: $1,000,000-$ 2,000,000
09/25/2025 05:00 PM UTC
FDC-015-10031.1
Structure Replacement Bridge No. 15-9006 Horton Run Road Over UNT to Horton Run Forest District 15, Wharton Township, Potter County Pennsylvania Demolition of the existing structure consisting of a single span reinforced concrete slab superstructure supported on stone masonry abutments. This structure will be replaced a precast reinforced concrete box culvert with a precast reinforced concrete end section (downstream) and two precast reinforced concrete wingwalls (upstream). DGS Small Business Certification Required Engineer's Estimate: $350,000-$550,000
09/25/2025 05:00 PM UTC
FDC-009-10014.1
Structure Replacement, Bridge A No. 09-0062, Wallace Mine Road Over UNT to Alex Branch, Bridge B No. 09-0065, Wallace Mine Road Over UNT to Trout Run, Forest District 09, Moshannon State Forest, Lawrence & Goshen Townships, Clearfield County, Pennsylvania Bridge A: replacement of a corrugated metal pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. Bridge B: replacement of a smooth wall corrugated high-density polyethylene pipe with precast reinforced concrete pipe with precast reinforced concrete end sections. DGS Small Business Certification Required Engineer's Estimate: $100,000.00 - $500,000.00
10/09/2025 05:00 PM UTC
FDC-013-10029.1
Structure Replacements, Bridge No. 13-0078, Simons Lane Over Bender Run, Bridge No. 13-0079, Simon Lane Over Portable Run, Forest District 13, Elk State Forest, Shippen Township, Cameron County, Pennsylvania This project will replace two (36” and 48” diameter) corrugated metal pipe culverts on Simons Lane. The existing culverts are both undersized, misaligned with their respective stream channel, and are in poor condition or collapsing. The proposed replacement structures are 6’-0” and 12’-0” precast reinforced concrete box culverts and end sections. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-007-10055.1
Structure Replacement, Bridge No. 07-9011, Pine Creek Hollow Road Over UNT to Pine Creek, Forest District 07, Bald Eagle State Forest, Haines Township, Centre County, Pennsylvania This project consists of the demolition of existing corrugated metal pipe arch structure and stone wingwalls and replacement with a precast reinforced concrete rigid frame. Other work includes rock lining, channel lining, architectural surface treatment, guide rail and driving surface aggregate (DSA) approach roadway. DGS Small Business Certification Required Engineer's Estimate: $500,000.00 - $1M
10/09/2025 05:00 PM UTC
FDC-326-10983.1
Iron Master's Mansion Rehabilitation, Susquehanna Riverlands State Park, Hellam Township, York County, Pennsylvania Rehabilitate the Iron Master's Mansion exterior shell and do selective demolition on the interior of the building. SDB Participation Goal 13% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
10/09/2025 05:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-225-11400.1
Site Improvements: Bastion, Walkways, and Parking Point State Park City Of Pittsburgh, Allegheny County, Pennsylvania. Project includes Demolition & Site Improvements to repair, replace and renovate pavements, pavers, curb, curb ramps, street cuts/permit, site furniture, handrail, fencing, drinking fountains, Forbes Trail Marker Stand, and lawn/landscape. Site Improvements also include excavation of flag bastion area, addition of a flagpole with light/electrical & flag, and minor cosmetic and electrical renovations to the Parking Attendant Booth. SDB Participation Goal: 20% VBE Participation Goal: 3 % Engineer's Estimate: $1,500,000- $3,000,000
03/06/2025 06:00 PM UTC
FDC-003-101783.1
General Construction Front Entry Reconfiguration at District Office Forest District 3, Tuscarora State Forest Toboyne Township, Perry County, Pennsylvania Project Description Work consists of but is not limited to demolishing the existing outdoor entrance ramp and replacing it with an enclosed lift in a new construction entrance addition. DGS Small Business Certification Required: Engineer's Estimate: $400,000-$600,000
03/06/2025 06:00 PM UTC
FDC-003-101783.4
Electrical Construction Front Entry Reconfiguration at District Office Forest District 3, Tuscarora State Forest Toboyne Township, Perry County, Pennsylvania Work consists of but is not limited to demolishing the existing outdoor entrance ramp and replacing it with an enclosed lift in a new construction entrance addition. DGS Small Business Certification Required: Engineer's Estimate: $30,000-$60,000
03/06/2025 06:00 PM UTC
FDC-010-10022.1R
Structure Replacement Bridge A: No. 10-0031 Cooks Run over Milligan Run Bridge B: No. 10-0086 Dead End Cooks Run Road over Onion Run Bridge C: No. 10-0087 Coon Run Road over EB Big Run Forest District 10, Sproul State Forest Noyes and East Keating Townships, Clinton County, Pennsylvania This project will replace three pipe culverts on Cooks Run Road, Dead End Cooks Run Road, and Coons Run Road with precast concrete box culverts. Other work includes rock lining, architectural surface, asphalt approach roadway, DSA approach roadway, and guide rails. SDB Participation Goal: 7% VBE Participation Goal: 3 % Engineer's Estimate: Over $1 Million
03/06/2025 06:00 PM UTC
FDC-205-01068.1
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office, which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. SDB Participation Goal 7% VBE Participation Goal 3% Engineer's Estimate: $1M+
02/20/2025 06:00 PM UTC
FDC-205-01068.2
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office, which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
02/20/2025 06:00 PM UTC
FDC-205-01068.3
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500 000
02/20/2025 06:00 PM UTC
FDC-205-01068.4
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
02/20/2025 06:00 PM UTC
FDC-400-11323.1
Construct Woven Wire Deer Fencing Forest District #17, William Penn State Forest West Caln Township, Chester County Forest District # 20, Loyalsock State Forest Forks & Hillsgrove Townships, Sullivan County Cascade Township, Lycoming County Installation of new deer fencing at 3 locations in Loyalsock State Forest, and 1 location in William Penn State Forest. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $1M
02/20/2025 06:00 PM UTC
FDC-500-819
Services to be provided will include inspection of construction activities for rehabilitation and replacement of bridges, roads and drainage, dams, swimming pools, sewage and water treatment systems, and marinas. The Consultant will be required to attend a preconstruction conference and regular job conferences with the Department and the construction contractor for each project. Under the direction of the Department, the Consultant will be required to keep records; document the construction work and provide daily site inspection reports to ensure conformity with contract specifications; prepare current and final estimates for payment to the construction contractor; assist the Department in obtaining compliance with the labor standards, safety and accident prevention, and perform other duties as required.