General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1R
Water Treatment Facility - Forest District Office Forest District 9, Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
07/17/2025 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
FDC-205-01068.2
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office, which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
02/20/2025 06:00 PM UTC
FDC-205-01068.3
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500 000
02/20/2025 06:00 PM UTC
FDC-205-01068.4
New Park Office Keystone State Park Derry Township, Westmoreland County, Pennsylvania This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
02/20/2025 06:00 PM UTC
FDC-400-11323.1
Construct Woven Wire Deer Fencing Forest District #17, William Penn State Forest West Caln Township, Chester County Forest District # 20, Loyalsock State Forest Forks & Hillsgrove Townships, Sullivan County Cascade Township, Lycoming County Installation of new deer fencing at 3 locations in Loyalsock State Forest, and 1 location in William Penn State Forest. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $1M
02/20/2025 06:00 PM UTC
FDC-500-819
Services to be provided will include inspection of construction activities for rehabilitation and replacement of bridges, roads and drainage, dams, swimming pools, sewage and water treatment systems, and marinas. The Consultant will be required to attend a preconstruction conference and regular job conferences with the Department and the construction contractor for each project. Under the direction of the Department, the Consultant will be required to keep records; document the construction work and provide daily site inspection reports to ensure conformity with contract specifications; prepare current and final estimates for payment to the construction contractor; assist the Department in obtaining compliance with the labor standards, safety and accident prevention, and perform other duties as required.
02/10/2025 09:00 PM UTC
FDC-500-820
Services to be provided will include inspection of construction activities for building projects, associated site improvements, and special inspections required by the Uniform Construction Code. The Consultant will be required to attend a preconstruction conference and regular job conferences with the Department and the construction contractor for each project. Under the direction of the Department, the Consultant will be required to keep records; document the construction work and provide daily site inspection reports to ensure conformity with contract specifications; prepare current and final estimates for payment to the construction contractor; assist the Department in obtaining compliance with the labor standards, safety and accident prevention, and equal opportunity provisions of the construction contract; and perform other duties as required.
02/10/2025 09:00 PM UTC
FDC-500-821
Services to be provided primarily will be topographic surveying for the design of bridges, roads, dams, various buildings, and sanitary systems; or boundary/property surveys. The latter could include all necessary subdivision requirements. They may occasionally include other related surveying work such as plot topography and cross sections, or title and record research to determine ownership and boundary locations.
02/10/2025 09:00 PM UTC
FDC-017-103537.1
New Septic at 2838 Hay Creek Road William Penn State Forest Robeson Township, Berks County, Pennsylvania This project includes the demolition of an existing on-lot disposal system; the construction of a new sand mound system; connection to the dwelling; the construction and installation of a new septic tank and dosing tank with a submersible pump, float and alarm system; the installation of a new electrical control panel and wiring, to provide waste disposal to the 2838 Hay Creek Road in William Penn State Forest. This will require the installation of all the appurtenances necessary to convey wastewater from the existing dwelling to the proposed sand mound. Selective demolition and abandonment of existing on-lot system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate:50,000-100,000
02/06/2025 06:00 PM UTC
FDC-422-7486.1R
Replace Boat Rental Docks (CULP) Nockamixon State Park Haycock Township, Bucks County, Pennsylvania. Work included under this project consists of the design of a new dock system using the existing ramps and professional engineer certification SDB Participation Goal: 9% VBE Participation Goal: 3% Engineer's Estimate: $600,000- $1 Million
02/06/2025 06:00 PM UTC
FDC-418-101239.4R
On Lot Sewage Disposal Systems - West Side of Park Marsh Creek State Park Upper Uwchlan Township, Chester County, Pennsylvania This project includes the construction of two (2) on-lot sewage treatment systems located at Marsh Creek State Park’s west launch area of the park (horse barn and west launch comfort station). The project includes the construction of an elevated sand mound and at grade disposal area, installation of septic tanks, effluent pumps, piping, controls, and appurtenances, and selective demolition of existing sanitary facilities. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
02/06/2025 06:00 PM UTC
51 - 60 of 194 Solicitations
1 2 3 4 6 8 9 10 19 20