General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-010-103277.1
Structure Replacement Bridge A - No. 10-0001, Graham Road Over Graham Run Bridge B - No. 10-0002, Graham Road Over East Ferney Run Roadway Rehabilitation Graham Road Forest District 10, Sproul State Forest Colebrook Township Clinton County, Pennsylvania Replace 2 structures with P/S Concrete Plank Beam bridge, and Precast Concrete Box Culvert. In addition, construction of a slide repair and placement of driving surface material on Graham Road. SDB Participation Goal 8% VBE Participation Goal 3% Engineer's Estimate: Over $1M
09/19/2024 06:00 PM UTC
FDC-011-10059.1
Structure Replacement Bridge No. 5111-0014 Bear Creek Blvd over Laurel Run Forest District 11, Pinchot State Forest Plains Township, Luzerne County, Pennsylvania Project Description: a. All site work to suit project preparation, execution, and completion. b. Partial demolition of the existing structure carrying Bear Creek Blvd over Laurel Run consisting of a 45’-0” long x 35’-0” wide Reinforced Concrete T Beam bridge. This structure will be replaced with a Single Span Composite Prestressed Concrete Spread Box Beam Superstructure atop Cast-in-Place Reinforced Concrete Cantilever Abutments that will provide a 18’ clear roadway width between the Structure Mounted Guide Rail barriers. The existing bridge substructure will be demolished to Elevation 1022.00 and the new bridge will span past the existing abutments and wingwalls. Replacement includes driving surface aggregate, rock lining, and architectural surface treatment. c. Construction of structure mounted guide rail barrier, measured from end of structure to end of structure. d. Construction of approach guide rail including: 12’-6” Type 31-S Guide Rail with 37’-6” Turned Down End Treatments at all four (4) corners. SDB Participation Goal: 6 % VBE Participation Goal: 3 % Engineer's Estimate: $ 800,000 - $ 1 Million
09/19/2024 06:00 PM UTC
FDC-007-10056.1
Structure Replacement, Bridge No. 5107-0056 Poe Paddy Drive Over Swamp Run Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania The proposed project includes a structure replacement of Poe Paddy Drive over Pine Swamp Run. It will be replacing the existing reinforced concrete slab structure with a precast reinforced concrete arch culvert at the same location as the existing structure. The proposed structure will provide two lanes of unopposed traffic as well as adequate barrier and approach guide rail updates where necessary. DGS Small Business Certification Required Engineer's Estimate: $500,0000 - $1M
09/19/2024 06:00 PM UTC
FDC-009-103274.1
Structure Replacement, Bridge No. 09-0053 Claymine Road Over Corbin Run Forest District 9, Moshannon State Forest Rush Township, Centre County, Pennsylvania This project will replace a partially collapsed 36” diameter corrugated metal pipe culvert on Claymine Road. The existing culvert is significantly undersized to provide the flow capacity necessary for the large upstream drainage area, which includes a significant amount of surface water runoff from the Mid-State Regional Airport runways. The proposed replacement structure is a precast concrete spread box beam superstructure supported by an integral abutment substructure. SDB Participation Goal 12% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1M
09/19/2024 06:00 PM UTC
FDC-418-103139.1
Pavement Rehabilitation of Multiple Roadworks and Trail Marsh Creek State Park Wallace & Upper Uwchlan Townships, Chester County, Pennsylvania The work for this project will consist of repair, reclamation and repaving of the sections of the existing paved roadway and other incidental construction of Marsh Creek West Park Road, Milford Road, Chalfont Road Boat Launch, and Park Trail Road as specified in the plan located within Marsh Creek State Park, Wallace & Upper Uwchlan Townships in Chester County. SDB Participation Goal: 8% VBE Participation Goal: 3% Engineer's Estimate: $400,000-$800,000
10/03/2024 06:00 PM UTC
FDC-007-103149.1
Deck Replacement, Bridge No. 07-0066 Penns Creek Trail Over Penns Creek Forest District 7, Bald Eagle State Forest Penn Township, Centre County, Pennsylvania Project Description: This project consists of construction of a new deck, railings and bollards for bridge no. 07-0066, Penns Creek Trail Bridge over Penns Creek. The bridge approaches will also be modified as necessary to tie into the new deck elevation. Other work includes in stream timber debris removal. DGS Small Business Certification Required Engineer's Estimate: $100,000 -$500,000
10/03/2024 06:00 PM UTC
FDC-005-103280.1
Bridge Maintenance (6 Bridges) Forest District 5, Rothrock State Forest West, Jackson, & Todd Townships Huntingdon County, Pennsylvania This project is for the maintenance repair or rehabilitation of six existing structures throughout the Rothrock State Forest. The proposed work includes: • The maintenance repair for Bridge A on PA Furnace Road includes repairing underpinning along the near abutment using a concrete collar and rock scour protection; cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; rebuilding a stone masonry wingwall; and replacing portions of the guiderail along the approach. • The rehabilitation for Bridge B on Pine Swamp Road will replace the existing superstructure with a steel I-beam bridge superstructure, including a nail laminated timber deck, timber curbs and structure mounted guiderail. The maintenance repairs for Bridge B also includes new concrete for beam seats, backwalls, cheekwalls, wingwall caps and concrete collars along the abutments; repointing existing stone masonry joints; and installing a new structure waterproofing and foundation drainage system. • The maintenance repair for Bridge C on Stone Creek Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; recaulking joints; and replacing portions of the guiderail along the approach. • The maintenance repair for Bridge D on Seeger Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; and recaulking joints. • The maintenance repair for Bridge E on Diamond Valley Road includes cleaning and staining the timber bridge rails; cleaning and sealing the substructure units; repointing existing stone masonry joints; and crack sealing on the asphalt roadway. • The maintenance repair for Bridge F on Trough Creek Drive includes cleaning, blasting, and repainting the steel floorbeam system; replacing existing deck connection hardware and retorquing hanger connections; retreating the existing glu-laminated timber arches and sidewalks; removing/reinstalling the membrane waterproofing and asphalt over the deck including repaving the approach roadway; and replacement of the approach guiderail. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: Over $1M
10/03/2024 06:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
FDC-003-10049.1
Project Name: Structure Replacement Bridge No. 03-0052 Wynn Gap Haul Road Over Unt To East Licking Creek Forest District 3, Tuscarora State Forest Bratton Township Mifflin County, Pennsylvania Project Description: a. Demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying Wynn Gap Haul Road over UNT to East Licking Creek and replacement witha single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, and 2RC approach roadway. c. Construction of roadway. d. Demolition of existing corrugated metal pipe carrying Wynn Gap Haul Road over UNT to East Licking Creek and replacement with a thermoplastic pipe. Other work includes pipe inlet/outlet protection, and proposed endwalls. DGS Small Business Certification Required Engineer's Estimate: $ 300,000- $600,000
11/02/2023 06:00 PM UTC
FDC-202-102897.1
Project Name: Rehab River Well Cook Forest State Park Barnett Township Forest County, Pennsylvania Project Description: Work included under this contract consists of modifications of the existing water treatment system. This includes removal of the existing UV disinfection light and installation of an underground chlorine contact loop for the purpose of achieving a 4-log treatment of viruses. Existing hydropneumatic tank, water meter, cartridge filter and associated piping will be replaced. DGS Small Business Certification Required. Engineer's Estimate: $50,000 - $100,000
10/19/2023 06:00 PM UTC
FDC-210-103441.1R
Force Main Replacement Ls7 Moraine State Park Franklin Township Butler County, Pennsylvania Project Description: Complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. Work shall include, but not be limited to, the following: Horizontal Directional Drilling for the installation of approximately 2,100 L.F. of 8” diameter IPS DR-11 HDPE sewage force main piping at the general locations shown on the Drawings. DGS Small Business Certification Required Engineer's Estimate: 100,000 - 250,000
10/05/2023 06:00 PM UTC
FDC-451-10264.1
Structure Replacement Bridge No. 6451-7501 Charles Bailey Trail Over E.B. White Clay Creek White Clay Creek Preserve London Britain Township Chester County, Pennsylvania Project Description All site work to suit project preparation, execution, and completion. Disassemble the existing damaged truss foot bridge and deliver the disassembled bridge to Pine Grove Furnace State Park. Remove and reconstruct portion of the existing reinforced concrete abutment cap. The existing reinforcement shall be cleaned and remain in place. Provide and erect a new structure consisting of a prefabricated FRP Truss superstructure on existing stone masonry abutments with a structure length of 56'-4" and a rail-to-rail width of 6'-6". Other work includes temporary stream crossing, temporary erosion control measures. DGS Small Business Certification Required Engineer's Estimate: 100,000-250,000
10/05/2023 06:00 PM UTC
FDC-450-101095.1
Project Name : Structure Rehabilation Bridge No. 6450-3113 Delaware Canal Lumberville Aqueduct & Towpath Bridge Over Paunacussing Creek Delaware Canal State Park Solebury Township Bucks County, Pennsylvania Project Description Remove of portions of an existing aqueduct substructure carrying the Delaware Canal and Tow Path over the Paunacussing Creek (09 7935 6450 3113). The removal and partial removal also consists of three retaining canal walls (wingwalls). The new aqueduct structure will consist of full height reinforced concrete abutments located within the existing stone masonry canal walls and will support a new single span prestressed concrete adjacent box beam aqueduct. The new pedestrian structure will consist of a single span steel rolled beam bridge with a timber deck set atop new beam seats. SDB Participation Goal: 11% VBE Participation Goal: 3% Engineer's Estimate: $2,000,000 - 3,000,000
10/05/2023 06:00 PM UTC
FDC-400-102665.4R
Installing EV charging stations at Three State Parks. Project Description: Installing EV Charging Stations at Three State Parks. DGS Small Business Certification Required Engineer's Estimate: $50,000-200,000
09/21/2023 08:30 PM UTC
FDC-016-10033.1
Structure Replacement Culvert No 16-0040, Fallbrook Cemetery Road Over Hemlock Hollow Run Forest District 16 Tioga State Forest Ward Township Tioga County, Pennsylvania, Project Description : Demolition of an existing structure, Fallbrook Cemetery Road over Hemlock Hollow Run, consisting of a corrugated metal pipe. It will be replaced with a precast reinforced concrete box culvert and precast reinforced concrete end sections. The 16-foot span, 6-foot rise proposed precast box culvert will provide an 18-foot clear roadway width. Replacement includes No. 2A coarse aggregate driving surface, guiderail, rock lining, and architectural surface treatment. DGS Small Business Certification Required: Yes Engineer's Estimate: 200,000 - 600,000
09/07/2023 06:00 PM UTC
FDC-450-102353.1
Structure Replacement Bridge No. 6450-2181 Bowman's Hill Wastegate Rehabilitation Delaware Canal State Park Upper Makefield Township, Bucks County Project Description: a. All site work to suit project preparation, execution, and completion. b. Rehabilitation of existing structure: Bowman’s Hill Wastegate carrying Canal Towpath over Delaware Canal Bowman’s Hill Wastegate is a two-span rolled steel I-beam bridge with a total length of 33’. The existing superstructure will be replaced with rolled steel I-beams and a nail-laminated timber deck. c. Repair any voids in and repoint the existing stone masonry pier, abutments, and wingwalls. Rebuild the concrete bridge seats. d. Rebuild the concrete wastegate floor and install cutoff walls at the upstream and downstream. e. Underpin the areas of undermining of the wastegate floor and wingwalls. f. Replace the timber wastegate doors and paint and lubricate the existing wastegate gears, gear lock and axles. g. Install R-6 rip-rap rock protection at the outlet. DGS Small Business Certification Required: Yes Engineer's Estimate: $100,000 - $400,000
09/07/2023 06:00 PM UTC
FDC-450-103398.1
Structure Replacement Bridge No. 6450-2409 Towpath Bypass Over Delaware Canal Inlet Delaware Canal State Park Borough Of New Hope Bucks County, Pennsylvania Project Description a. All site work to suit project preparation, execution, and completion. b. Demolition of the existing structure carrying Towpath Bypass over Delaware Canal of a 59’-0” long x 75’-0” wide (3) cell Corrugated Metal Pipe culvert. This structure will be replaced with a Single Span Composite Prestressed Concrete Adjacent Box Beam Superstructure atop Precast Reinforced Concrete Cantilever Abutments that will provide a 13’-2 ¼” clear roadway width between the PA Type 10M Bridge Barriers. Replacement includes driving surface aggregate and rock lining. c. Construction of PA Type 10M Bridge Barrier, measured from end of structure to end of structure. d. Construction of a temporary crossing at approximately 60’ south of the bridge site to maintain access to the eastern canal berm. e. Reconstruction of the stone masonry retaining wall located along the west berm of the canal. SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $800,000
09/07/2023 06:00 PM UTC
FDC 003-101782.1
Replace Aboveground Gas/Diesel Tanks Forest District #3, Tuscarora State Forest Perry County, Pennsylvania Remove (2) existing 2,000 gallon aboveground vault fuel tanks (one gasoline; one diesel) and install (2) new 2,000 gallon above ground fuel tanks. Providing new tanks will be the responsibility of the Contractor. Removal of existing vault tanks from the site will be the responsibility of the Contractor. Work shall result in a complete and operational 2,000 gallon gasoline and 2,000 gallon diesel above ground fuel tank system DGS Small Business Certification Required Contractor MUST BE AMMX and AMR Certified to bid on this project. Engineer's Estimate: $100,000 - $400,000
08/24/2023 06:00 PM UTC
61 - 70 of 109 Solicitations
1 2 3 4 5 7 9 10 11