General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-133-102948.1
Rehabilitation Of Marina Road, West Launch Road, & Rustic Campground Road Bald Eagle State Park Howard And Liberty Townships Centre County, Pennsylvania Work included under this contract consists of reclamation, paving, and grading work on Marina Road, West Launch Road, and Rustic Campground Road at Bald Eagle State Park as specified in the plan. SDB Participation Goal: 13 % VBE Participation Goal: 3 % Engineer's Estimate: $ 500,000- Over $1 Million
03/19/2026 05:00 PM UTC
FDC-114-10557.1
Silt Removal Little Pine State Park Cummings Township Lycoming County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. The approximate volume of sediment removal at Little Pine Lake at Little Pine State Park and the hauling and disposal of sediment material at designated disposal sites. b. The control and maintenance of all groundwater and surface water, as required, to complete all construction in the dry. c. Bituminous paving of park roads and repair of any park roads damaged during the silt removal operations. d. Implementation, maintenance, and removal of erosion and sedimentation control measures of the entire project sites. Base Bid 1 Base Bid 2 SDB Participation Goal: 23 % 23 % VBE Participation Goal: 3% 3 % Engineer's Estimate: Over $1 Million
03/19/2026 05:00 PM UTC
FDC-200-103850.1
Region 2 Paving Jennings, McConnells Mill and Moraine State Parks Franklin and Brady Townships, Butler County, Pennsylvania Slippery Rock Township, Lawrence County, Pennsylvania Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. SDB Participation Goal: 15% VBE Participation Goal: 3% Engineer's Estimate: $300,000-$700,000
03/19/2026 05:00 PM UTC
FDC-109-103106.1
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. SDB Participation Goal 14% VBE Participation Goal 3% Engineer's Estimate: $2M - $4M
03/05/2026 06:00 PM UTC
FDC-109-103106.2
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. DGS Small Business Certification Required Engineer's Estimate: $400,000 - $600,000
03/05/2026 06:00 PM UTC
FDC-109-103106.3
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. DGS Small Business Certification Required Engineer's Estimate: $200,000 - $400,000
03/05/2026 06:00 PM UTC
FDC-109-103106.4
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. SDB Participation Goal 11% VBE Participation Goal 3% Engineer's Estimate: $1M - $3M
03/05/2026 06:00 PM UTC
FDC-429-6133.1R
Pavement And Drainage Rehabilitation Of Multiple Sections Lackawanna State Park Benton & North Abington Townships Lackawanna County, Pennsylvania The work for this project will consist of repair, reclamation and repaving and drainage improvement work of the sections of the existing paved roadway and other incidental construction of South Shore Road, Lee Hill Drive and two parking lots as specified in the plan, within Lackawanna State Park in Benton and North Abington Townships, Lackawanna County, Pennsylvania. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
03/05/2026 06:00 PM UTC
FDC-429-6133.1
Pavement And Drainage Rehabilitation Of Multiple Sections Lackawanna State Park Benton & North Abington Townships Lackawanna County, Pennsylvania The work for this project will consist of repair, reclamation and repaving and drainage improvement work of the sections of the existing paved roadway and other incidental construction of South Shore Road, Lee Hill Drive and two parking lots as specified in the plan, within Lackawanna State Park in Benton and North Abington Townships, Lackawanna County, Pennsylvania. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
02/19/2026 06:00 AM UTC
FDC-226-10907.1
Rehab Jamestown Day Use Water System Pymatuning State Park West Shenango Township, Crawford County, Pennsylvania Work included under this contract consists of the disconnect and removal of the existing water booster system unit, the installation and reconnection of the new water booster system unit, and the disinfection and flushing of the water distribution system. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
02/05/2026 06:00 PM UTC
31 - 40 of 266 Solicitations
1 2 4 6 7 8 9 … 26 27