Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-220-10119.1R2
Building Rehab - Replace Roof on Public Safety Building Presque Isle State Park Millcreek Township Erie County, Pennsylvania Work included under this contract consists of the removal and disposal of existing Public Safety Building roof, furnish and install 8,170 ft2± of new EPDM roof and appurtenances including: EPDM rubber roof system, insulation, fascia boards – non-treated, fascia trim wrap – aluminum trim coil, and all required fasteners and roof penetration boots or sealants. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
02/05/2026 06:00 PM UTC
FDC-020-104173.1
Construct Woven Wire Deer Fencing Forest District #20 Loyalsock State Forest Shrewsbury Township, Sullivan County, Pennsylvania Installation of new deer fencing at two locations in Loyalsock State Forest DGS Small Business Certification Required Engineer's Estimate: $200,000 - $400,000
01/22/2026 06:00 PM UTC
FDC-010-104171.1
Construct Woven Wire Deer Fencing Forest District #10, Sproul State Forest Leidy and Beech Creek Townships Clinton County, Pennsylvania The Department of Conservation and Natural Resources (DCNR), Bureau of Forestry, requires services for the installation of woven wire deer fences including gates at specifically designated locations in the Forest Districts located within the Commonwealth of Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $100,000- $400,000
01/22/2026 06:00 PM UTC
FDC-800-104174.1
Construct Woven Wire Deer Fencing Forest Districts #8 & #9, Clear Creek and Moshannon State Forests Heath and Huston Townships Jefferson and Clearfield Counties, Pennsylvania The Department of Conservation and Natural Resources (DCNR), Bureau of Forestry, requires services for the installation of woven wire deer fences including gates at specifically designated locations in the Forest Districts located within the Commonwealth of Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $150,000
01/22/2026 06:00 PM UTC
FDC-016-104172.1
Construct Woven Wire Deer Fencing Forest District #16, Tioga State Forest Elk, Shippen, and Brown Townships Tioga and Lycoming Counties Pennsylvania The Department of Conservation and Natural Resources (DCNR), Bureau of Forestry, requires services for the installation of woven wire deer fences including gates at specifically designated locations in the Forest Districts located within the Commonwealth of Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
01/22/2026 06:00 PM UTC
FDC-220-10043.4R
Area Rehab - Perry Monument Restoration Presque Isle State Park Millcreek Township Erie County, Pennsylvania Work included under this contract consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument. All work will be performed in compliance with the DEP issued Chapter 105 general permit. DGS Small Business Certification Required Engineer's Estimate: $30,000- $60,000
01/22/2026 06:00 PM UTC
FDC-010-10758.1
Structure Replacement, Bridge No. 10-0088, Seven Mile Road Over Seven Mile Run, Bridge No. 10-0089, Seven Mile Road Over Seven Mile Run, Forest District 10, Sproul State Forest Chapman Township, Clinton County, Pennsylvania This project consists of demolition of two existing structure consisting of metal plate pipe-arches. Both will be replaced with larger opening metal pipe arches with metal end sections and metal wingwalls. Improvements include a wider roadway width (16ft) and a smoother roadway alignment to facilitate timber truck movement, and riprap protection of the roadway embankment. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
01/08/2026 06:00 PM UTC
FDC-400-10984.4R
Dorm Room Renovations Hickory Run State Park Kidder Township Carbon County, Pennsylvania Renovate two existing dorm rooms at the DCNR Leadership School to accommodate additional students/ranger trainees. SDB Participation Goal 16% VBE Participation Goal 3% Engineer's Estimate: $500,000 - $1 Million
01/08/2026 06:00 PM UTC
FDC-207-102380.1
Scenic View Water System Rehabilitation Laurel Hill State Park Middlecreek Township Somerset County, Pennsylvania Work included under this contract consists of the complete design, permitting and construction of a potable water system located at the Laurel Hill State Park Penn Scenic View. This project proposes to install a new groundwater well source, meeting the requirements of PADEP Bureau of Safe Drinking Water and Pennsylvania Chapter 109. The project includes the installation of one (1) potable water groundwater well, development and construction of the well, and design and construction of all appurtenances such as the submersible pump system, drop piping, pitless adapter, and sanitary seal well cap. The project will require six (6) potable water system connections using open trench and horizontal directional drilling methods. The water system shall include all necessary treatment, as required by PADEP. The project will include the assembly of a water storage tank and associated telemetry. The project will also include proper abandonment of the existing six (6) groundwater wells, associated water pipes and valves, (4) sewer manholes, and sewer pipe. The project will require modifications to be made to the existing public restroom and electrical work. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $700,000
01/08/2026 06:00 PM UTC
FDC-207-102380.4
Scenic View Water System Rehabilitation Laurel Hill State Park Middlecreek Township Somerset County, Pennsylvania Work included under this contract consists of the complete design, permitting and construction of a potable water system located at the Laurel Hill State Park Penn Scenic View. This project proposes to install a new groundwater well source, meeting the requirements of PADEP Bureau of Safe Drinking Water and Pennsylvania Chapter 109. The project includes the installation of one (1) potable water groundwater well, development and construction of the well, and design and construction of all appurtenances such as the submersible pump system, drop piping, pitless adapter, and sanitary seal well cap. The project will require six (6) potable water system connections using open trench and horizontal directional drilling methods. The water system shall include all necessary treatment, as required by PADEP. The project will include the assembly of a water storage tank and associated telemetry. The project will also include proper abandonment of the existing six (6) groundwater wells, associated water pipes and valves, (4) sewer manholes, and sewer pipe. The project will require modifications to be made to the existing public restroom and electrical work. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
01/08/2026 06:00 PM UTC
41 - 50 of 266 Solicitations