General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002415 - Veterinary Medicine-Stereotactic Radiation Therapy Addition
The project consists of, but is not limited to, demolition of existing partitions, mechanical, electrical and plumbing modifications, ceiling, lighting, flooring, new partitions, site utility modifications, and installation of a concrete footing system.
01/11/2018 08:01 PM UTC
CP002387 - Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement
The project consists of, but is not limited to, demolition of existing steam service associated equipment and piping. Installation of new interior gas distribution, gas fired boilers, heating piping, reheat water circulation system, pumps, and misc. electrical and general construction.
01/09/2018 08:01 PM UTC
CP002355 - Wallace and Wilson Residence Halls-Window Replacement-Phase 2
The project consists of, but is not limited to, provide operable and fixed aluminum-framed windows with trim package as indicated in drawings in dens and select student rooms in Wallace and Wilson Residence Halls. The work includes ten residential floors, the mezzanine and the ground floors in each of the two buildings.
01/04/2018 08:01 PM UTC
CP002437-Linden Residence Hall-Window Replacement
The project consists of, but is not limited to, providing new aluminum windows throughout building to replace existing windows removed under separate abatement contract, exceptions noted. Provide complete removal and replacement of exterior entrance assemblies. New aluminum entrance assemblies to include new hardware.
12/19/2017 08:01 PM UTC
CP002343 - Institutional Roads 2018-Union Drive & Welch Road Reconstruction
The project consists of, but is not limited to, full roadway reconstruction of Union Drive and Welch Road, between Lincoln Way and Bissell Road on the Iowa State University campus. Work to be completed includes full-depth pavement reconstruction, curbs, pedestrian sidewalks and ramps, minor parking lot improvements, storm sewer piping and structures, pavement markings and street lighting.
12/19/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.01-GENERAL CONSTRUCTION (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls. B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
12/14/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.02-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls. B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
12/14/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.03-MECHANICAL (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls. B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
12/14/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.04-ELECTRICAL (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls. B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
12/14/2017 08:01 PM UTC
CP002429 - East Hall-Electrical Panels & Disconnect Replacement
The project consists of, but is not limited to, the replacement of the East Hall Electrical Panels and Disconnects, including the replacement of a 4,160-volt line within Heady Hall and East Hall.
12/12/2017 08:01 PM UTC
381 - 390 of 409 Solicitations
1 2 33 34 35 36 37 39 41