CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1-BID PACKAGE 1.01-DEMOLITION (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.02-GENERAL CONSTRUCTION (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.03-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.04-FIRE SPRINKLER (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.05-MECHANICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.06-ELECTRICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002357 - Osborn Drive Sidewalk Widening-Phase Three-East Corridor
The project consists of, but is not limited to, curb and sidewalk removal, PCC sidewalk install, colored sidewalk install, major and minor manhole adjustments, installation of electrical conduit and wire, curb and gutter install, light pole installation and electrical vault lid replacement.
12/07/2017 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
12/05/2017 08:01 PM UTC
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
11/30/2017 08:01 PM UTC
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2 The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
11/14/2017 08:01 PM UTC