Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
| 08/11/2026 07:01 PM UTC |
|
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
| 08/18/2026 07:01 PM UTC |
|
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
| 08/20/2026 07:01 PM UTC |
|
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
| 08/27/2026 07:01 PM UTC |
|
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
| 09/03/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
| 04/16/2026 07:01 PM UTC |
|
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
| 04/14/2026 07:01 PM UTC |
|
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
| 04/07/2026 07:01 PM UTC |
|
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED****
This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
| 04/02/2026 07:01 PM UTC |
|
CP1284895-FPM Campus Services Storage
This project will construct a new structure for the storage of salt and sand for Campus Services to enhance campus safety by ensuring safe, passable roads, sidewalks, and entryways during the winter months, and to improve operational efficiency. The Iowa Department of Transportation has notified Iowa State that, starting in the Fall/Winter of 2026, it will no longer permit the use of its facility for storing bulk salt and sand. The university will need to coordinate delivery and provide its own storage.
| 03/26/2026 07:01 PM UTC |
|
CP1284647-Parks Library-Second and Third Floor-Improvements
This project will provide improvements to the second and third floors of Parks Library. The scope of work includes, but is not limited to, removing existing carpet and base and installing new carpet and base on the west side of the third floor of Parks Library, in the room where the bookstacks and study carrels are located. Work will also include running and installing power poles and thread power hubs.
| 03/24/2026 07:01 PM UTC |
|
CP1271060-Beardshear Hall-Roof Replacement
The project includes, but is not limited to, full tear off of the existing roof and replacement with a new fully adhered EPDM. Abatement will be completed as necessary. Roof insulation and the appropriate roof safety systems and equipment will be installed according to current university standards. All masonry walls and features directly affecting the roof and exterior will be tuckpointed to maintain a water-tight seal.
| 03/19/2026 07:01 PM UTC |
|
CP1291197-Friley Residence-Room A128 Air Conditioning Installation
This project will install cooling units in the Friley Residence Terrace Room, Room A128. The scope of work includes, but is not limited to, the installation of wall-mounted and ceiling-mounted split units, chilled water piping to serve the units, and installing acoustical ceiling tile.
| 03/17/2026 07:01 PM UTC |
|
CP1288490-Hilton Coliseum-South Walkway-Replacement
This project will remove the south bridge and replace with new cast-in-place concrete stairs and accessible ramp. The scope of work includes, but is not limited to, demolition of existing bridge structure; new cast-in-place concrete stairs and ramp; handrails; and site lighting.
| 03/12/2026 07:01 PM UTC |
|
CP1280283-Parking Lots 2026-Pavement Preservation-East Campus Parking Deck Repairs
This project will complete repairs and maintenance on the East Campus Parking Deck. Work includes, but is not limited to concrete repair, membrane removal and application, sealant replacement, expansion joint replacement, guard rail repairs, pavement markings, painting, stair repairs and other associated improvements.
| 03/10/2026 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.