Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP965428-Jacobson Athletic Building-Elevator-Improvements
This project will modernize one passenger elevator in the Jacobson Athletic Building. The modernization includes new controller, door operating equipment, and signal fixtures
| 09/12/2024 07:01 PM UTC |
CP1243948-Patterson Hall-Rooms 1140, 1142, and 1144-Remodel
This project will remodel rooms 1140, 1142, and 1144 into a new lab space. Work includes, but is not limited to, new flooring, cabinetry, lights, and finish upgrades.
| 09/05/2024 07:01 PM UTC |
CP1241528-Parks Library-Tiers-Lighting Replacement
This project includes, but is not limited to replacing the ceiling mounted light fixture interiors and lamps on each of the seven (7) floors in the tiers within the I.S.U. Parks Library with new “LED retrofit kits” as detailed on the plan sheets. Light fixture and building wiring will also be replaced as indicated on the plan sheets.
ALTERNATE ONE BID: In lieu of LED retrofit kits, replace the ceiling mounted light fixtures (housing, interior and lamps) with new light fixtures as detailed on the plan sheets.
| 08/15/2024 07:01 PM UTC |
CP002660-Curtiss Farm-Plant and Seed Facility-Remodel
This project will consist of an addition to or partitioning of space currently used by the Plant Sciences Institute in order to separate critical drying activities for research. The project includes, but is not limited to, finish, mechanical, and equipment upgrades as needed.
| 08/13/2024 07:01 PM UTC |
CP1243665-Frederiksen Court Community Center-RTU-Replacement
This project includes, but is not limited to, the replacement of six RTUs at the Frederiksen Court Community Center.
| 07/09/2024 07:01 PM UTC |
CP1240383-Utilities-Power Plant-Service Water Pump-Replacement
This project includes, but is not limited to, replacing the current 2 service water pumps with 4 service water pumps with VFDs (variable frequency drive), modified piping, manual valves, and new control valves.
| 06/25/2024 07:01 PM UTC |
CP1226590-Institutional Roads 2024-University Boulevard and 6th Street-Signal Replacement
This project will replace the existing traffic signals with new signals that meet current traffic control standards. Scope of work includes, but is not limited to, new signal poles, heads, controllers, countdown timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing, ADA compliant crosswalk controls, and concrete patching in the intersection.
| 06/18/2024 07:01 PM UTC |
CP1200333-Sweeney Hall-Rooms 2038 and 2058-Remodel
This project includes, but is not limited to, remodeling two adjacent laboratories to connect them and add the infrastructure needed for research. Work will include new data, lighting, ceilings, finish patch and repair as needed, corrected water and air locations, and new lab casework.
| 06/11/2024 07:01 PM UTC |
CP1175069-ISU Child Care Center at Veterinary Medicine-Remodel
This project includes, but is not limited to, replacement of flooring and wall base, countertops, and an exterior door. Work also includes replacing wood trim at five windows and replacement of thirteen window units.
| 05/30/2024 07:01 PM UTC |
CP1234647-Patterson Hall-Rooms 2119 and 2119A-Remodel
This project will remodel an existing research lab to accommodate new equipment for needed research. This project includes, but is not limited to, abatement of the existing floor and replacing it with new floors, replacing existing casework including wall cabinets, new lighting, and updating lab safety features to accommodate the new layout.
| 05/23/2024 07:01 PM UTC |