General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002412 - Curtiss Hall-Third Floor Renovation
The project consists of, but is not limited to, the alteration of a classroom, office areas, and public hallways on the 3rd floor of Curtiss Hall.
01/24/2019 08:01 PM UTC
CP002492 - Scheman Building-Brunnier Art Museum-Storage and Entrance Remodel
The project consists of, but is not limited to, renovation of permanent collection storage and museum entrance including installation of high density compact storage units, installation of LED lighting, alteration of walls at museum entrance, updated materials and finishes at museum entrance, and remodel of existing office space to accommodate a second exit from the suite.
01/17/2019 08:01 PM UTC
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC
CP002487-Helser Residence Hall-Window Replacement
This project consists of, but is not limited to, the installation of new aluminum windows throughout Helser Residence Hall to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction where necessary to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
12/13/2018 08:01 PM UTC
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
11/15/2018 08:01 PM UTC
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
11/08/2018 08:01 PM UTC
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
11/01/2018 07:01 PM UTC
CP002511 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 3
The project consists of, but is not limited to, the removal and replacement of fifty-five (55) fan coil units and accessories. Complete installation per each unit(s) in a single room to be completed in three (3) work days. Work involves installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
10/23/2018 07:01 PM UTC
CP002411 - Curtiss Hall-Second Floor Renovation
The Project consists of the alteration of public hallways and office areas on second floor of Curtiss Hall, including the addition of a single use restroom, lactation room, and custodian’s closet.
09/27/2018 07:01 PM UTC
341 - 350 of 409 Solicitations
1 2 31 32 33 35 37 38 39 40 41