Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1316832-Veenker Golf Course Grounds-Bridge Number 15 Replacement
This project will replace the existing bridge at Hole 15 of Veenker Golf Course. The scope of work includes, but is not limited to, the construction of a new, Pre-Engineered Steel Truss Recreational trail bridge and connecting cart paths. The new bridge will be located just south of the existing bridge. The existing bridge and portions of the cart path will be removed in their entirety.
| 10/13/2026 07:01 PM UTC |
|
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
| 10/22/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
| 10/29/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1302295-Gilman Hall-Room 1402 Remodel
This project will remodel the existing Chemistry Stores Warehouse in Gilman Hall. This will include demolition of existing cabinets and counters, painting, flooring, lighting, ceiling, moving walls, and constructing two new office spaces.
| 10/01/2026 07:01 PM UTC |
|
CP1317849-Wallace-Wilson Commons-South Side Eats Kitchen
This project will design and construct a new kitchen of approximately 1400 gross square feet utilizing an existing custodial break room, office, mail storage, vending area, and corridor space on the first floor of the Wallace-Wilson Commons. South Side Eats, currently located in C1220, will relocate to the new kitchen space, a new custodial break room will be constructed in C1220, and vending will move to an open area along the corridor to the east. The scope of work includes demolition of interior space including walls, casework, and finishes. New work will include new walls, casework, kitchen equipment, finishes, and updated mechanical and electrical work to support the remodel.
| 09/29/2026 07:01 PM UTC |
|
CP1295938-Parks Library-West Exterior Cornice Repair
This project will address the west exterior cornice of Parks Library to prevent further concrete deterioration by repairing the damaged concrete, adding metal flashing, and repointing masonry wall joints.
| 09/15/2026 07:01 PM UTC |
|
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
| 09/03/2026 07:01 PM UTC |
|
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
| 09/01/2026 07:01 PM UTC |
|
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
| 08/27/2026 07:01 PM UTC |
|
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
| 08/18/2026 07:01 PM UTC |
|
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
| 08/11/2026 07:01 PM UTC |
|
CP1276033-Power Plant-Condenser Water Piping Repairs Phase 2
This project will replace a large portion of the circulating water pipes that run underground from the power plant to the cooling tower east of the plant. The scope of work includes, but is not limited to, replacement of the remaining original four 48 inch cooling tower main pipes running to the main plant from the cooling tower.
| 07/30/2026 07:01 PM UTC |
|
CP1119681-Veterinary Diagnostic Laboratory-Phase 2-Lab Gas Piping
The contractor will furnish and install a complete stainless steel laboratory gas piping system including tubing, fittings, valves, regulators, supports, and labeling for an Owner-provided Nitrogen Tank system, using clean installation practices and orbital welding where applicable. Work will comply with ASME B31.3, NFPA 55, and local codes, include full coordination with other trades, and conclude with pressure testing, leak checking, purging, commissioning, and delivery of as‑built documentation.
| 07/23/2026 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.