General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
10/22/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
10/29/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
11/03/2026 08:01 PM UTC
CP1321285-Reiman Gardens Storage Building and Maintenance Building Addition
The scope of work includes, but is not limited to, a 640 SF addition to the existing maintenance building and improvements to the surrounding area, such as new site walls, fencing, paving, and re-striping of the parking lot. Also included is the construction of a new 2,300 SF storage building to store miscellaneous event and horticulture equipment. This storage facility will have general electrical service and lighting; it will be tempered, but not fully conditioned. Expansion of paving will be added to the west of the new storage facility to improve site access and circulation.
11/05/2026 08:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes retaining wall footing and masonry replacement, site lighting, concrete stair and sidewalk replacement, patio, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
11/12/2026 08:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.02 METAL FRAMING, GYP, and ACP - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.03 ACCESS FLOORING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.04 SHEETMETAL and ROOFING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002427
College Creek-Bank Erosion Repair - The project consists of, but is not limited to, bank grading, excavation, and installation of rip rap to stabilize eroding creek bank. Work includes storm sewer piping, intake installation, sidewalk removal, sidewalk replacement and all associated erosion control measures required to protect slopes.
10/17/2017 07:01 PM UTC
CP002425
Veterinary Medicine-Domestic Water Line Replacement-Phase 3 - The project consists of, but is not limited to, extensions of the domestic water service and additional piping to facilitate future work to the existing domestic water service. Provide new valves, piping, piping accessories, insulation and other items required to complete the system.
10/12/2017 07:01 PM UTC
CP002435
Knoll-Exterior Repairs-Masonry - The project consists of, but is not limited to, repair of exterior masonry walls to maintain the integrity of the Knoll.
10/05/2017 07:01 PM UTC
CP002417
Memorial Union-Dining Services Franchise Space Remodel - The project consists of, but is not limited to, demolition of existing walls, counters, finishes, mechanical, plumbing, and electrical. New counters, finishes, kitchen equipment, and associated mechanical, plumbing, and electrical will be installed.
09/26/2017 07:01 PM UTC
CP002424
Parks Library-Roof Replacement Sections E-I, Q & R - The project consists of, but is not limited to, demolition of existing roof ballast, flashings, abandoned mechanical screen wall and associated items; inspection of existing membrane and substrate condition to remain, preparation and installation of a loose laid wind ballasted membrane system and associated flashings.
09/12/2017 07:01 PM UTC
411 - 418 of 418 Solicitations
1 2 … 34 35 36 37 38 39 40 42 Next →