Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1044575-Lloyd Veterinary Medical Center-Pet Cancer Clinic-Remodel and Addition
This project is an addition and renovation to the existing LLoyd Veterinary Medical Center to develop a Comparative Oncology Center. The new pet cancer clinic includes new exams rooms, animal day wards, clinical procedure and support rooms, office spaces,and client waiting areas.
| 01/20/2026 08:01 PM UTC |
|
CP1278052-State Avenue Warehouse-Roof Replacement
The scope of work includes, but is not limited to, removing existing EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
| 01/27/2026 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1-BID PACKAGE 1.01-DEMOLITION (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.02-GENERAL CONSTRUCTION (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.03-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.04-FIRE SPRINKLER (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.05-MECHANICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.06-ELECTRICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002357 - Osborn Drive Sidewalk Widening-Phase Three-East Corridor
The project consists of, but is not limited to, curb and sidewalk removal, PCC sidewalk install, colored sidewalk install, major and minor manhole adjustments, installation of electrical conduit and wire, curb and gutter install, light pole installation and electrical vault lid replacement.
| 12/07/2017 08:01 PM UTC |
|
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
| 12/05/2017 08:01 PM UTC |
|
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
| 11/30/2017 08:01 PM UTC |
|
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2
The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
| 11/14/2017 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.