General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
05/05/2026 07:01 PM UTC
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
05/05/2026 07:01 PM UTC
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
05/07/2026 07:01 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
03/06/2018 08:01 PM UTC
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
03/01/2018 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
02/22/2018 08:01 PM UTC
CP002447 - Hamilton Hall-Window Replacement-Phase 2
The project consists of, but is not limited to, furnish and install new aluminum window system at areas indicated. Windows will be removed and disposed of by Owner’s abatement contractor. Coordinate removal of existing window assemblies and installation of new windows with Owner’s abatement contractor. Remove and reinstall existing window shades/blinds. Patch and paint adjacent walls as needed due to window replacement.
02/15/2018 08:01 PM UTC
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
01/30/2018 08:01 PM UTC
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
01/30/2018 08:01 PM UTC
CP002436 - Friley Residence Hall Window Replacement
The project consists of, but is not limited to the installation of new aluminum windows throughout Friley Hall to replace existing windows removed under separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during multiple phases during summers only – see Construction Progress Schedule and substantial completion dates.
01/25/2018 08:01 PM UTC
CP002409 - Barton-Lyon-Freeman-Roof Replacements
The project consists of roof replacement work at Barton, Freeman and Lyon Residence Halls. Work consists of, but is not limited to, removal of slate roof system, slate dormer sidewall tiles, dispose. Remove metal gutters and downspouts, dispose. Install new metal gutter and downspouts. Install new asphalt shingle roof system over ice and water shield membrane and roofing accessories. Repair and/or replace damaged wood items as indicated in documents.
01/23/2018 08:01 PM UTC
CP002249 - MacKay Hall-Center Wing Window Replacement
The project consists of, but is not limited to, the replacement of 23 window assemblies and 3 door assemblies on the south side, center wing of MacKay Hall. Windows are on the basement, first, and second floors and shall be replaced with metal clad wood windows.
01/18/2018 08:01 PM UTC
CP002324 - Utilities-Chilled Water West Campus Distribution Improvements
The project consists of, but is not limited to, installing new underground utilities consisting of 24 inch chilled water supply and return piping, 12 inch to 42 inch storm sewer system with associated roadway intakes, 10 inch domestic water main, 10 inch sanitary sewer, a steam tunnel extension and underground electrical system for site lighting all under Bissell Road and the adjacent sidewalks from Osborn Drive to Union Drive. Additionally the project includes complete replacement Bissell Road, adjacent sidewalks and all new site lighting for areas affected by the underground utilities.
01/18/2018 08:01 PM UTC
361 - 370 of 399 Solicitations