CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 12/02/2025 08:45 PM UTC |
|
RCIP Project No. 10LDRC7711 - CP3237
Wastewater Treatment Plant A
Basin A-06 Sewer Rehabilitation
Funding by CDBG-DR (SAM.gov Assistance Listing 14.228)
Resilient Communities Infrastructure Program (RCIP)
RCIP Project No. 10LDRC7711 – CP3237
I. Scope of Services:
The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
There is approximately 25,830 LF of 6-inch through 10-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
| 12/02/2025 08:45 PM UTC |
|
CP 9778
City of Lake Charles, Louisiana
Lake Charles Event Center ADA Railing and Seating
CP 9778
Develop new handrails in the upper 300 section of the existing coliseum. The handrails will provide an added measure of safety to assist patrons going up and down the existing stairs to their seats. And to add accessible seating at the south end of the coliseum in sections 226 and 202.
| 12/02/2025 08:45 PM UTC |
|
CP 3257
City of Lake Charles, Louisiana
Sally Mae (Medora – Dead End) Phase II
CP 3257
The Sally Mae Street Drainage & Overlay project for the City of Lake Charles, Louisiana, involves improvements to Sally Mae Street that include grading, earthwork, installation of new and replacement drainage infrastructure, sub-surface drainage, and an asphaltic overlay of the roadway. The scope also covers driveway replacements, utility coordination, and erosion control measures to enhance stormwater management and roadway durability along the project corridor.
| 10/14/2025 07:45 PM UTC |
|
Project No. 2023-727 Capital Project No. 3469
City of Lake Charles, Louisiana
E. McNeese Sidewalk -
Corbina Rd. to Lake Crest Blvd
Project No. 2023-727
Capital Project No. 3469
PROJECT SUMMARY: The general scope of work for Project No. 2023-727 involves installing a new 8’ wide sidewalk on the North side of East McNeese Street from the East side of the roundabout at Corbina Rd. to Lake Crest Blvd. This work includes the associated roadway pavement work to facilitate the sidewalk installation.
| 09/02/2025 07:45 PM UTC |
|
Capital Project Number CP 3274
CITY OF LAKE CHARLES, LOUISIANA
SOUTH PARK DRIVE WATERLINE EXTENSION
(E. GAUTHIER RD. TO RED DAVIS MCCOLLISTER RD.)
CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER
CP 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for South Park Drive Waterline Extension project. The Work includes, but is not limited to, the following:
o Furnishing and installing of approximately 3,008 linear feet of 20-inch PVC and 2,078 linear feet of 24-inch HDPE water main from Red Davis McCollister Road to East Gauthier Road.
| 08/05/2025 07:45 PM UTC |
|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
|
LCR409
City of Lake Charles, Louisiana
Buddy Prejean Park Enhancements
LCR409
The overall project will include renovations/upgrades to the (2) existing ball fields. The existing fields will have all components removed and new installed. This will include new fencing, new dugouts, new lighting at the baseball field, and new backstop. The fields will be one for baseball and one for softball. The fields will be built to NHSA dimensions for high school sizes and be natural grass/clay. Other miscellaneous components will be provided as needed for a complete and useful project.
Alternate No. 1 is for additional fencing and gates as shown on the project drawings.
| 06/17/2025 07:45 PM UTC |
|
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
|
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.