City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
Number | Deadline |
---|---|
DR001
City of Lake Charles, Louisiana
LCPD Investigations
DR001
Construct a new approximately 11,000 sq ft building on a partially developed site. Project will include new paving, landscaping, fencing, and other site amenities. Project will include a new generator for the building.
The project will include two alternates. Alternate one will be for landscaping as shown and noted on the drawings and alternate two will be for perimeter fencing as shown and indicated on the drawings.
| 11/14/2023 08:45 PM UTC |
Project No. 2023-729 Capital Project No. 3308
Project No. 2023-729
Capital Project No. 3308
Downtown Streetscape Phase II
Bilbo St. Between Division St. & Mill Street
City of Lake Charles, LA
The general scope of work for this project consists of reconstructing paving and sidewalks at the intersection of Division Street and Hodges, and Bilbo Street between Division and Mill, and on Mill Street West of Bilbo in preparation of the new Woodring Apartment development in the 600 block of Bilbo Street. This will be accomplished by:
• Reconstructing the sidewalks at the intersections to provide ADA compliant handicap sidewalk ramps
• Removing the traffic signals at these intersections and converting them to 4-way stops
• Constructing “bulb-outs” to further define existing streetside parking
• Increasing the pavement width on the East side of Bilbo Street from Division Street to Mill Street to provide for additional parallel, streetside parking
• Salvaging the existing bus-stop assembly and constructing a new bus-stop site on Mill Street
This work will also require installation of new drainage features as well as the associated pavement work.
| 11/14/2023 08:45 PM UTC |
2023-06
Professional Services - Appraisal Services
| 10/31/2023 07:45 PM UTC |
2024-07
Professional Services - Lead Paint Testing Services
| 10/31/2023 07:45 PM UTC |
CP 3436
City of Lake Charles, Louisiana
2022 Drainage Infrastructure Improvements – Package No. 4
CP 3436
Project scope consists of improvements to the subsurface storm drainage system along various areas throughout the City. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as sealing or replacement of storm drain inlets to improve drainage flow and maintain the integrity of the properties served by the system.
| 10/31/2023 07:45 PM UTC |
Project No. 2021-717 Capital Project No. 3346
Project No. 2021-717
Capital Project No. 3346
Lakefront Boardwalk Phase II
City of Lake Charles, LA
The Lakefront Boardwalk Phase ll will construct a 15-foot-wide walkway with decorative concrete pavers approximately 1000 feet long along the recently installed steel sheet pile bulkhead placed at the Port Wonder/Crying Eagle/Parking Garage site on North beach.
This work will include the handrail and reinforced concrete pile cap on the steel sheet pile wall. Lighting, site benches, amenities, and landscaping bordering this new walkway will be incorporated into the project. Walkway access points with connectivity to Crying Eagle and the Parking Garage shall be provided. Site fill and grading along the boundary of the new sidewalk and between the parking garage and walkway will be required.
| 10/17/2023 07:45 PM UTC |
RFP #2024-04, File ID #399-23
Professional Services: Program Manager - Choice Neighborhood Implementation Grant - Neighborhood Strategy
| 10/17/2023 07:45 PM UTC |
CP3384
City of Lake Charles, Louisiana
Power Centre Parkway Sidewalks
CP 3384
The scope of work for this project is to install sidewalks on the South side of Power Centre Parkway from 5th Avenue to Amoco Rd. East of Hwy. 14. The sidewalks will tie into the existing sidewalks from the Cottages at Power Centre on the southwest side of the 5th Avenue and Power Centre Parkway intersection, crosswalk across 5th Avenue, connect to the existing 5th Avenue sidewalks along the east side, and traverse along the south side of 5th avenue approximately 0.50 miles to Highway 14. This will be followed by a crosswalk with pedestrian signal across Highway 14, and approximately 0.18 miles of new sidewalk along the south side of Power Centre Parkway, connecting to the existing sidewalk near the southwest corner of Amoco Dr. intersection in front of the Lake Charles Charter Academy. The Hwy. 14 crossing requires signal work to modify the traffic pattern to include the pedestrian sequence. The engineering and design has already been included in the project plans and specs. Each of the intersections and driveways, etc. will required removal of existing curb to modify for ADA accessible ramps. See plan sheets and specs for more details and locations.
| 10/03/2023 07:45 PM UTC |
DR017
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs – Ball Parks Sports Lighting Repairs - DR017
College Oaks, Henry Heights and Nelson:
1. The Work includes the following:
a. Replacement of all wood light poles with new metal light poles and LED lighting.
b. Existing metal light poles to remain and have LED lighting installed.
c. Security lighting installed on sports lighting poles.
d. Adjust electrical feeders and circuitry as required.
| 10/03/2023 07:45 PM UTC |
2023-38
Purchase and Installation of GPS/Automated Vehicle Location (AVL)/Telematics/Fleet Management System for the City of Lake Charles
| 09/19/2023 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.