City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
CP3382
City of Lake Charles, Louisiana
Anita Drive Park Development
CP3382
The Anita Drive Park is a city owned, vacant 1.56-acre tract located at the intersection for Ryder Avenue and Anita Drive within the City of Lake Charles. The proposed improvements include site construction associated with a concrete parking lot, a children’s splash pad, a picnic pavilion /shade structure, a lighted walking path, restroom facilities, open play lawn, site furnishings, site landscape, and required utility connections.
| 12/05/2023 08:45 PM UTC |
|
DR001
City of Lake Charles, Louisiana
LCPD Investigations
DR001
Construct a new approximately 11,000 sq ft building on a partially developed site. Project will include new paving, landscaping, fencing, and other site amenities. Project will include a new generator for the building.
The project will include two alternates. Alternate one will be for landscaping as shown and noted on the drawings and alternate two will be for perimeter fencing as shown and indicated on the drawings.
| 11/14/2023 08:45 PM UTC |
|
Project No. 2023-729 Capital Project No. 3308
Project No. 2023-729
Capital Project No. 3308
Downtown Streetscape Phase II
Bilbo St. Between Division St. & Mill Street
City of Lake Charles, LA
The general scope of work for this project consists of reconstructing paving and sidewalks at the intersection of Division Street and Hodges, and Bilbo Street between Division and Mill, and on Mill Street West of Bilbo in preparation of the new Woodring Apartment development in the 600 block of Bilbo Street. This will be accomplished by:
• Reconstructing the sidewalks at the intersections to provide ADA compliant handicap sidewalk ramps
• Removing the traffic signals at these intersections and converting them to 4-way stops
• Constructing “bulb-outs” to further define existing streetside parking
• Increasing the pavement width on the East side of Bilbo Street from Division Street to Mill Street to provide for additional parallel, streetside parking
• Salvaging the existing bus-stop assembly and constructing a new bus-stop site on Mill Street
This work will also require installation of new drainage features as well as the associated pavement work.
| 11/14/2023 08:45 PM UTC |
|
2023-06
Professional Services - Appraisal Services
| 10/31/2023 07:45 PM UTC |
|
2024-07
Professional Services - Lead Paint Testing Services
| 10/31/2023 07:45 PM UTC |
|
CP 3436
City of Lake Charles, Louisiana
2022 Drainage Infrastructure Improvements – Package No. 4
CP 3436
Project scope consists of improvements to the subsurface storm drainage system along various areas throughout the City. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as sealing or replacement of storm drain inlets to improve drainage flow and maintain the integrity of the properties served by the system.
| 10/31/2023 07:45 PM UTC |
|
Project No. 2021-717 Capital Project No. 3346
Project No. 2021-717
Capital Project No. 3346
Lakefront Boardwalk Phase II
City of Lake Charles, LA
The Lakefront Boardwalk Phase ll will construct a 15-foot-wide walkway with decorative concrete pavers approximately 1000 feet long along the recently installed steel sheet pile bulkhead placed at the Port Wonder/Crying Eagle/Parking Garage site on North beach.
This work will include the handrail and reinforced concrete pile cap on the steel sheet pile wall. Lighting, site benches, amenities, and landscaping bordering this new walkway will be incorporated into the project. Walkway access points with connectivity to Crying Eagle and the Parking Garage shall be provided. Site fill and grading along the boundary of the new sidewalk and between the parking garage and walkway will be required.
| 10/17/2023 07:45 PM UTC |
|
RFP #2024-04, File ID #399-23
Professional Services: Program Manager - Choice Neighborhood Implementation Grant - Neighborhood Strategy
| 10/17/2023 07:45 PM UTC |
|
CP3384
City of Lake Charles, Louisiana
Power Centre Parkway Sidewalks
CP 3384
The scope of work for this project is to install sidewalks on the South side of Power Centre Parkway from 5th Avenue to Amoco Rd. East of Hwy. 14. The sidewalks will tie into the existing sidewalks from the Cottages at Power Centre on the southwest side of the 5th Avenue and Power Centre Parkway intersection, crosswalk across 5th Avenue, connect to the existing 5th Avenue sidewalks along the east side, and traverse along the south side of 5th avenue approximately 0.50 miles to Highway 14. This will be followed by a crosswalk with pedestrian signal across Highway 14, and approximately 0.18 miles of new sidewalk along the south side of Power Centre Parkway, connecting to the existing sidewalk near the southwest corner of Amoco Dr. intersection in front of the Lake Charles Charter Academy. The Hwy. 14 crossing requires signal work to modify the traffic pattern to include the pedestrian sequence. The engineering and design has already been included in the project plans and specs. Each of the intersections and driveways, etc. will required removal of existing curb to modify for ADA accessible ramps. See plan sheets and specs for more details and locations.
| 10/03/2023 07:45 PM UTC |
|
DR017
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs – Ball Parks Sports Lighting Repairs - DR017
College Oaks, Henry Heights and Nelson:
1. The Work includes the following:
a. Replacement of all wood light poles with new metal light poles and LED lighting.
b. Existing metal light poles to remain and have LED lighting installed.
c. Security lighting installed on sports lighting poles.
d. Adjust electrical feeders and circuitry as required.
| 10/03/2023 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.