CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project Number CP3262
CITY OF LAKE CHARLES, LOUISIANA SOUTHEAST WATER TREATMENT PLANT NEW WATER TREATMENT FACILITY CAPITAL PROJECT NUMBER CP3262 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for Southeast Water Treatment Plant – New Water Treatment Facility project. The Work includes, but is not limited to, the following: • Construction of a new groundwater treatment facility predicated on the removal of iron and manganese which includes the following major components to facilitate the production, treatment, and distribution of potable water: o Four (4) water production wells. o Four (4) horizontal pressure filters. o Two (2) concrete, ground storage tanks. o Four (4) high service pumps. o Two (2) backwash pumps. o One (1) backwash recovery clarifier. o One (1) backwash recovery pump station. o One (1) sludge detention lagoon. o Chemical feed systems (chlorine, pot perm, fluoride, phosphate, and caustic). o Onsite backup generator with automatic transfer switch. o Buildings (Chemical Feed, Chlorine, and Filter Buildings). o Miscellaneous civil, mechanical, electrical, and SCADA components.
02/14/2023 08:45 PM UTC
Project No. 2022-722 Capital Project No. 3428
Project No. 2022-722 Capital Project No. 3428 Various Citywide Drainage & Ancillary Infrastructure Improvements Phase 2 City of Lake Charles, LA The general scope of work for this project is demolition of site paving/foundations and utilities and reconstruction of various pavements, including drainage, sewer, water, and electrical improvements adjacent to the existing parking garage on North Beach.
02/14/2023 08:45 PM UTC
Project No. 2019-693 Capital Project No. 3308
Project No. 2019-693 Capital Project No. 3308 Downtown Streetscape Phase II Bilbo St. between Division St. & Mill St. City of Lake Charles, LA The general scope of work for this project consists of reconstructing sidewalks at the intersections of Bilbo Street and Division Street and Bilbo Street & Mill Street in preparation of the new Woodring Apartment development in the 600 block of Bilbo Street. This will be accomplished by: • Reconstructing the sidewalks at the intersections to provide ADA compliant handicap sidewalk ramps • Removing the traffic signals at these intersections and converting them to 4-way stops • Constructing “bulb-outs” to further define existing streetside parking • Increasing the pavement width on the East side of Bilbo Street from Division Street to Mill Street to provide for additional parallel, streetside parking • Salvaging the existing bus-stop assembly and constructing a new bus-stop site on Mill Street This work will also require installation of new drainage features as well as the associated pavement work.
01/31/2023 08:45 PM UTC
Project #CP3335
City of Lake Charles, Louisiana Nellie Lutcher Memorial Pocket Park City of Lake Charles Project #CP3335 The project scope consists of the new construction of a pocket park. Work scope includes earthwork, paving, fencing, landscaping, and limited electrical items.
12/20/2022 08:45 PM UTC
CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at Wastewater Treatment Plants A, B/C, and D. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Wastewater Treatment Plant A (128 W. Railroad Ave., Lake Charles, LA 70601) • Office/Administration/Blower Pump Room Building (Insurance SOV No. 081A) • Storage Building No.1 (Insurance SOV NO. 081.D.1) • Sludge Processing Building (Insurance SOV No. 081M) Wastewater Treatment Plant B/C (1132 W. 18th St., Lake Charles, LA 70601) • Equipment Building (Insurance SOV No. 024) • Portable Building (Insurance SOV NO. 25A) • RAS/WAS Pump Station (Insurance SOV No. 029E) • Motor Control Center No. 1 Building (Insurance SOV No. 029G) • Motor Control Center No. 2 Building (Insurance SOV No. 029H) • Electrical Storage Building (Insurance SOV No. 32) • Portable Building (Insurance SOV No. 33) Wastewater Treatment Plant D (3820 Tank Farm Rd., Lake Charles, LA 70601) • Press Building (Insurance SOV No. 126C) • Tertiary Filter Building (Insurance SOV No. 126D) • Maintenance Building (Insurance SOV No. 126E) • Control Room Building (Insurance SOV No. 126F) • MCC Building (Insurance SOV No. 126J) • MCC Building (Insurance SOV No. 126K) • Oxidation Ditch No. 1 (Insurance SOV No. 126.A.1) Design services shall be as per the City of Lake Charles A&E Manual.
12/20/2022 08:45 PM UTC
CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116
CITY OF LAKE CHARLES, LOUISIANA WATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at the Southwest, George H. West, Center East, Center West, Chennault, and McNeese Water Treatment Plants. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Southwest Water Treatment Plant (4300 Alma Lane) • Pump/Administration Building (Insurance SOV No. 116) George H. West Water Treatment Plant (225 N. Ryan Street) • Distribution/Linemen Building (Insurance SOV No. 083) • Pump/Administration Building (Insurance SOV No. 085) • Chlorine Building (Insurance SOV No. 086A) • Chlorine Building (Insurance SOV No. 086B) • Utility Building (Insurance SOV No. 088) Center East Water Treatment Plant (3207 Center Street) • Main Building (Insurance SOV No. 101) Center West Water Treatment Plant (3208 Center Street) • Pump Building (Insurance SOV No. 103) Chennault Water Treatment Plant (1501 W. Main Street) • Chlorine Building (Insurance SOV No. 096) McNeese Water Treatment Plant (617 E. McNeese Street) • Pump Building (Insurance SOV No. 110) Design services shall be as per the City of Lake Charles A&E Manual.
12/20/2022 08:45 PM UTC
HL-14
City of Lake Charles, Louisiana LAKE CHARLES CIVIC CENTER - HURRICANE LAURA REPAIRS ROSA HART & CENTER SECTION INTERIOR REPAIRS HL-14 Proposed Scope of work: • Repairs walls, ceilings, and floors • Replacing insulation • Replacing HVAC • Replacing stage dressing rooms and office
12/20/2022 08:45 PM UTC
HL-SOV-26.A, 28, 34, 36, 40, 81.D.2, 111
City of Lake Charles Water & Wastewater Treatment Plants – Building Demolition Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-26.A, 28, 34, 36, 40, 81.D.2, 111 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to various buildings at the McNeese Water Treatment Plant and Wastewater Treatment Plant ‘B/C’, to point where the buildings are no longer suitable for occupancy and require demolition to facilitate future site improvements. II. Scope of Services: Design and implementation of demolition procedures, in response to damage incurred as result of Hurricane Laura (DR-4559-LA), to remove and dispose of damaged structures and foundations to facilitate future site improvements. This Work shall include: McNeese Water Treatment Plant (617 E. McNeese Street) • Lab Building (Insurance SOV #111) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Overhead Canopy o Remove and Dispose of Existing Concrete Foundation Wastewater Treatment Plant B/C (1132 W. 18th Street) • Recreation Maintenance Building (Insurance SOV #26.A) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation • Mechanic Shop (Insurance SOV #28) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation • Storage Building (Insurance SOV #34) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. • Supervisor Building (Insurance SOV #36) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. • Map Building (Insurance SOV #40) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. Wastewater Treatment Plant A (128 West Railroad Avenue) • Recreation Maintenance Building (Insurance SOV # 81.D.2) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation Design services shall be as per the City of Lake Charles A&E Manual.
12/06/2022 08:45 PM UTC
2023-08
Request for Qualifications for Professional Services for Flood Mitigation, Public Safety & Citywide Resilience – BRIC 2021 on High Priority Ditches & Culverts in the 2021 Critical Drainage Improvement Program (RFQ #2023-08)
12/06/2022 08:45 PM UTC
LR0002
City of Lake Charles, Louisiana Nelson Road Extension And Bridge Utility Improvements LR0002 SCOPE OF WORK: Project scope consists of the relocation of water and sewer lines currently in conflict with the Nelson Road Extension and Bridge project by LADOTD (State Project No. H.005967). PROJECT LIMITS: Project utility relocations are west of the intersection of Sallier St. and Riverside Dr. within newly acquired right-of-way by DOTD.
11/15/2022 08:45 PM UTC