City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2012-607, CP No. 2894
Sewer Pipe Bursting on Various Streets, City of Lake Charles, LA
| 01/15/2013 08:45 PM UTC |
Project No. 2012-612, CP No. 3159
Project No. 2012-612, CP No. 3159
30†Sewer Main CIPP Lining-Franklin Street from Church Street to Pryce Street; Pryce Street from Franklin Street to 1st Avenue; 1st Avenue from Pryce Street South Approx. 80 feet, City of Lake Charles, LA
| 12/18/2012 08:45 PM UTC |
Project No. 2012-609, CP No. 2944
Demolition of North Underground Reservoir at Geo. West Water Plant, City of Lake Charles, LA
| 12/04/2012 08:45 PM UTC |
Project No. 2011-594, CP No. 3143
3rd Avenue and 3rd Street Sewer Lift Station Rehabilitation - City of Lake Charles, LA
| 11/20/2012 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.