General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project No. CP3124
Capital Project No. CP3124 Central School Arts & Humanities 3rd Floor Flooring City of Lake Charles, LA ~ • Installation of plywood sub floor, wood finish floor and shoe mouldings on the third floor as well as replacement of stair treads and nosing at stairs indicated on plan. • Trimming all doors as required. • Installing carpet at entrance of theater Balcony. • Replacing seats and backs on existing Theater chairs where indicated. Removing existing Theater chairs and installing new Theater chairs where indicated.
03/18/2014 07:45 PM UTC
Project No. 2013-622, CP No. 2894
Project No. 2013-622, Capital Project No. 2894 PIPE BURSTING – 9TH STREET FROM 2ND AVENUE TO 4TH AVENUE; 5TH STREET FROM 2ND AVENUE TO 3RD AVENUE; VARNEY CIRCLE FROM I-210 EAST TO BUNKER ROAD; AND ILLINOIS STREET FROM LOUISIANA AVENUE, EAST CITY OF LAKE CHARLES, LOUISIANA SCOPE OF WORK The general scope of work for Project No. 2013-622 includes pipe bursting the existing 8” or 15” sewer lines and reconnecting the existing sewer services, installation of new precast concrete manholes, and installation of protective manhole interior liners. The sewer main North of Varney Circle shall be up-sized to 16 inches.
03/18/2014 07:45 PM UTC
Capital Project No. CP3089
Capital Project No. CP3089 New Transit Bus Wash City of Lake Charles, LA ~ The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives, a guard shack and controlled automated access. The facility will be located on a fenced, city owned property on Goodman Road.
03/03/2014 08:45 PM UTC
Capital Project No. CP3165, LEI Project No. 13-008
CITY OF LAKE CHARLES 2013 ASPHALT OVERLAY OF VARIOUS STREETS CITY OF LAKE CHARLES CAPITAL PROJECT NO. CP3165 LEI PROJECT NO. 13-008 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement widening, pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. See Street (North Booker Street to Sallie Mae Street) 2. Poplar Street (North Booker Street to Sallie Mae Street) 3. Katherine Street (North Booker Street to North Lincoln Street) 4. Beam Street (Mill Street to Dead End) 5. 3rd Street (Highway 14 to McNabb Street) 6. 7th Avenue (2nd Street to Dead End) 7. Shellbeach Drive (Lake Street to Bridge West of Wilson Street) 8. West Walton Street (Illinois Street to South Walton Street) 9. Briarfield Street (Illinois Street to Dead End) 10. South Walton Street (West Walton Street to East Walton Street) 11. East Walton Street (Illinois Street to South Walton Street) 12. Fourden Lane (Illinois Street to South Walton Street) 13. Brentwood Street (Illinois Street to Dead End) 14. Greenfield Circle (Full Length) 15. West Autumnwood Lane (Full Length) 16. Autumnwood Lane (West Autumnwood Lane to McNeese Street) 17. Springwood Lane (Autumnwood Lane to Dead End) 18. Stillwood Lane (Springwood Lane to McNeese Street) 19. Christina Drive (McNeese Street to Dead End) 20. Happy Lane (Riverside Drive to Dead End)
02/18/2014 08:45 PM UTC
Project No. 2013-624, Capital Project No. 3183
Project No. 2013-624 Capital Project No. CP3183 Water Line Extension-Burton Lane from Prien Lake Road to Francis Drive and Francis Drive from Burton Lane East to Dead End City of Lake Charles, LA ~ The general scope of work is the installation of a 12 inch HDPE water line by directional drill along the West side of Burton Lane from West Prien Lake Road, South to Francis Drive, and an 8 inch HDPE water line by directional drill along the South side of Francis Drive, East approximately 860 feet.
01/14/2014 08:45 PM UTC
Project No. 2013-620, Captial Project No. 3159
Project No. 2013-620 Capital Project No. 3159 CIPP Lining of 30” Sewer Main Under I-10 From Intersection of Belden and Franklin To Intersection of Church and Franklin City of Lake Charles, Louisiana ~ The general scope of work includes CIPP lining of 30” sewer main under I-10 from intersection of Belden and Franklin to the intersection of Church and Franklin, and includes the installation of a cured-in-place pipe (CIPP) lining system, manhole installation, including protective liners, and removal and replacement of reinforced concrete street pavement.
11/19/2013 08:45 PM UTC
MA Project No. A9-13002-DA
MA Project No. A9-13002-DA Graymarket Drive Sanitary Sewer Extension City of Lake Charles, LA ~ The project scope includes the new construction of 1,700 LF of 8” and 10” diameter gravity sanitary sewer main. The proposed main includes but is not limited to 11 sanitary sewer manholes, 200 LF of jacking and boring and 14 sanitary sewer service assemblies.
11/05/2013 08:45 PM UTC
Project No. 2013-618, Capital Project No. 3151
Project No. 2013-618 (CP #3151) Drainage and Asphalt Overlay Improvements Vito Street - Prater to Albert Street Carr Street – Vito to Evans Street Prater Street – Vito to Evans Street City of Lake Charles, LA ~ The general scope of work for Project No. 2013-618 includes: • Improvements to roadside ditches, • Patches of full depth asphalt repair; • and overlay of the existing asphalt surface
11/05/2013 08:45 PM UTC
Project No. 3128, LDEQ SRF Project No. CS221215-01
Project No. CP3128 LDEQ SRF Project No. CS221215-01 Plant B/C Pump Station City of Lake Charles, LA ~ The scope of work for the project is the construction of a new Plant B/C Pump Station for pumping of raw sewage which shall consist of, but is not limited to: • Site Excavation and Borrow Structural Fills • Construction of Reinforced Concrete Pump Station Wetwell • Furnish and Install Gravity Sewers and Manholes • Furnish and Install Sewer Force Mains • Furnish and Install Mechanical Bar Screen System with Screenings Washer Conveyor rated for • Furnish and Installation of two (2) – 100 Hp Vertical Turbine Solids Handling Pumps each rated for 3,500 GPM • Furnish and Installation of four (4) 300 Hp Vertical Turbines Solids Handling Pumps each rated for 7,000 GPM • Furnish and Install Mechanical Piping and Valve Systems • Furnish and Install Electrical Lighting, MCC Switchgear, Process Equipment Controls, and Pump Control Systems • Furnish and Install Painting and Protective Coatings Systems • Installation of Site Drainage, Driveways, Paving, and Turfing
10/15/2013 07:45 PM UTC
Project No. 2013-617, Capital Project No. 2894
Project No. 2013-617 Capital Project No. 2894 Sewer Line Pipe Bursting and Manhole Installation at Various Locations (8th Street, Oklahoma Street, 12th Street, Hinton Drive and Windsor Street) City of Lake Charles, LA SCOPE OF WORK: The general scope of work includes pipe bursting the existing 8” or 12” sewer lines and reconnecting the existing sewer services, and installation of new precast concrete manholes, and installation of protective manhole interior liners. The project sites for the sewer repairs are as follows: - From 2nd Avenue to 4th Avenue between 7th Street and 8th Street - From Louisiana Avenue to Maine Street between Virginia Street and Oklahoma Street - From Bank Street to 1st Avenue between 11th Street and 12th Street - Between Hinton Drive and Legion Street - From Jefferson Drive to Dolby Street between Lee Street and Windsor Street
10/15/2013 07:45 PM UTC
341 - 350 of 374 Solicitations
1 2 30 31 32 33 35 37 38