CP3427
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT B/C SLUDGE PROCESSING IMPROVEMENTS CAPITAL PROJECT NUMBER CP3427 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following: • Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors. • Installation of Access Hardware for Operation/Maintenance of Digestors. • Construction of New Blower Building for Process Equipment. • Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion. • Construction of New Motor Control Center. • Reconstruction of Existing Sludge Pump Station. • Construction of New Sludge Processing Building. • Installation of Screw Presses for Solids Processing. • Installation of Dewatering Polymer Feed System. • Installation of Conveyance System for Solids Handling/Disposal. • Interconnections to Owner’s SCADA for Control/Monitoring. • Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
12/16/2025 08:45 PM UTC
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana Muirfield Drive Drainage-Phase II Project No. 2025-748 Capital Project No. 3224 The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
01/06/2026 08:45 PM UTC
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726 Capital Project No. 3019 Sale Road Bridge Repair City of Lake Charles, LA The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes: • Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall; • Replace failed drainage concrete pipe and boxes; • Removal and replacement of reinforced concrete pavement; • The associated traffic management, including detour signage.
01/06/2026 08:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project No. 3188
Project No. CP3188 Cline, Colletta, and Bank St. Lift Station Improvements City of Lake Charles, Louisiana ~ Scope of Services: • The City of Lake Charles Wastewater Division owns and operates the Cline, Colletta, and Bank Street Lift Stations. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project: 1. Remove existing pumps and replace with new submersible pumps, remove existing electrical and controls and replace / relocate with new, remove existing piping and valves and replace with new, remove existing valve vault and wet well riser and replace with new – Bank Street Lift Station ONLY. 2. Clean, repair, and coat the wet wells, install hurricane fencing with green slats, and install permanent bypass connection – at EACH lift station.
10/14/2014 07:45 PM UTC
Project No. 2014-641, Bond Issue No. SW0002
PROJECT NO. 2014-641 BOND ISSUE NO. SW0002 SEWER FORCE MAIN EXTENSION HENDERSON BAYOU ROAD FROM WEST PRIEN LAKE ROAD TO DEAD END OF HENDERSON BAYOU ROAD (PHASE TWO – LOCKE LANE WEST TO DEAD END) CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work includes, but is not limited to, the following: a. The directional drill installation of approximately 610 linear feet of new 1.5 inch diameter DR-9 HDPE low pressure sewer force main b. The directional drill installation of approximately 446.linear feet of new 2 inch diameter DR-11 HDPE low pressure sewer force main c. The directional drill installation of approximately 820 linear feet of new 3 inch diameter DR-7 HDPE low pressure sewer force main d. The installation of 4 each 2 inch gate valve flush stations e. The connection of the force main to an existing stub pipe at a manhole located at Locke Lane and Henderson Bayou Road This project is for the installation of the low pressure sewer force main and appurtenances only. The connections and installation of lateral lines and grinder pump stations are the responsibility of the individual residents.
10/14/2014 07:45 PM UTC
Project No. 2012-615, Capital Project No. 2899
Project No. 2012-615 Capital Project No. 2899 EDI Special Project No. B-09-SP-LA-0141 and B-08-SP-LA-0535 Utility Extension to Serve Tract One C and Tract One D Lake Charles Civic Center City of Lake Charles, LA ~~~~ The general scope of work for Project No. 2012-615, includes, but is not limited to, the following: (a) The directional drill installation of approximately 811 linear feet of new 12” diameter DR-11 HDPE water line with associated appurtenances. (b) The open cut installation of approximately 330 linear feet of new 12” diameter DR-18 PVC water line with associated appurtenances. (c) The directional drill installation of approximately 436 linear feet of new 12” diameter DR-11 HDPE sanitary sewer line. (d) The open cut installation of approximately 170 linear feet of new 8” diameter SDR-26 PVC sanitary sewer line. (e) The installation of 5 new sanitary sewer manholes. (f) The directional drill installation of approximately 5960 linear feet of new 3” diameter DR-13.5 HDPE conduit to include pull wire, capped ends, and tracer wire. Utility conduit are grouped in sets of 4 or 8 conduits. Utility conduit installed under this contract is for the future use by others under separate contract.
09/16/2014 07:45 PM UTC
Project No. 2014-630, Capital Project No. 3186
Project No. 2014-630 Capital Project No. 3186 ~~~ Drainage Improvements 10th Street Between 8th & 9th Avenue And 11th Street Between 6th & 7th Avenue City Of Lake Charles, LA The general scope of work for Project No. 2014-630 includes drainage improvements, concrete pavement repair and sidewalk repair.
09/16/2014 07:45 PM UTC
Project No. 2014-637, Capital Project No. 2968
Project No. 2014-637 Capital Project No. CP2968 Louisiana Avenue Bridge Over Contraband Bayou Piling Repair City of Lake Charles, LA ~ The general scope of work for Project No. 2014-637, Capital Project No. 2968, Louisiana Avenue Bridge Over Contraband Bayou Piling Repair, includes the following: (a) Bridge piling repair; (b) Spall repair on South approach slab; (c) Sway bracing repair.
08/05/2014 07:45 PM UTC
Project No. 2014-636, CP No. 3003
Project No. 2014-636 Capital Project No. 3003 Demolition of Old Harrah’s Hotel Site Parking Lot And Building Foundation City of Lake Charles, LA ~ The general scope of work is the demolition of the existing building foundation, pool, and concrete slabs. Also included is the placement of fill material to level the site. Alternate Bid #1 includes those bid form items for the demolition of the concrete parking lot, light poles, and boardwalk sidewalks, along with required fill material to level the site.
07/15/2014 07:45 PM UTC
Capital Project No. CP3089
Capital Project No. CP3089 New Transit Bus Wash City of Lake Charles, LA ~ The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives and security fencing. The facility will be located on city owned property along Goodman Road.
06/17/2014 07:45 PM UTC
Project No. CP3147
Capital Project No. CP3147 LCPD Annex Renovations City of Lake Charles, LA ~ Upgrade and improve the existing building through renovations. The renovations will include major renovations to the Men and Women’s restrooms (4 total); renovations to the existing breakroom; revise the entry lobby area; and upgrade the open office area with solid wall offices.
05/20/2014 07:45 PM UTC
Project No. CP3152
Capital Project No. CP3152 Lake Charles CDBG FY-2013 Sidewalk Improvements City of Lake Charles, LA ~ I. Scope of Work: • The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations as funds permit: i. North Blake Steet, West Side (Moeling St.-Existing Sidewalk to Commercial St.) ii. Commercial Street, North Side (North Shattuck St. to North Prater St.) iii. Katherine Street, North Side (North Prater St. to Jr. Street) iv. Martha Street, South Side (N. Shattuck to N. Prater Street) v. Martha Street, North Side (N. Shattuck to N. Prater Street) vi. Medora Street, North Side (Graham Street to MLK Hwy) vii. Fournet Street, North Side ( N. 1st Avenue to N. Lyons Street)
05/06/2014 07:45 PM UTC
Project No. CP3167
Capital Project No. CP3167 Lift Station Improvements OCD-DRU City of Lake Charles, LA ~ I. Scope of Services: Due to flooding from previous storm events, the City of Lake Charles evaluated several lift stations that were unable to properly pump the collected wastewater flows into the stations. The existing mechanical and electrical design configurations of these lift stations were the limiting factor of proper operation during the flooding. Proposed mechanical improvements include installation of new dry-pit submersible pumps that would enable the pumping of wastewater during flood events. Proposed electrical improvements include elevating the lift station’s control panels and switchgear above the 100-year base flood elevation. A. Mechanical Evaluation – Mechanical improvements include installation of new dry-pit submersible pumps and the replacement of all suction and discharge valves and header piping to enable the pumping of wastewater during flood events at the following pump stations: 1. 7th Avenue 2. Colletta 3. Cline 4. Goos 5. Holly Hill 6. St. John 7. Creole B. Electrical Evaluation – Electrical improvements include elevating the control panel(s)and switchgear above flood levels at the following pump stations: 1. Colletta 2. Goos 3. Holly Hill 4. Creole