General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP3120 Contraband Lift Station Rehabilitation Project
Capital Project No. CP3120 Contraband Lift Station Rehabilitation Project City of Lake Charles, LA ~ The City of Lake Charles Wastewater Division owns and operates the Contraband Lift Station. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project: 1. Remove existing pumps/motors and replace with dry pit submersible pumps, and upgrade electrical equipment as needed to accommodate new pumps 2. New pumps are to be equipped with variable frequency drives. Due to the size of these drives, a new slab on grade building will house the drives. This new electrical building will have a brick veneer and architectural shingle roof. 3. In addition to the new electrical building, addition site improvements include new P.C.C. pavement, green slatted hurricane fencing with brick columns, and improvements to the access road leading to the lift station site. 4. All suction and discharge valves are to be replaced with new. 5. Existing wet well is to be cleaned, repaired, and coated.
05/05/2015 07:45 PM UTC
Project No. 2015-644, Capital Project No. 2894
Project No. 2015-644 Capital Project No. 2894 Sale Road Lift Station Wet Well Wall Structural Rehabilitation City of Lake Charles, LA ~ Contractor shall provide all materials, all labor, supervision, tools, construction equipment, transportation, services, incidentals and temporary facilities, including electrical power, water, sanitary facilities, offices, and warehouses and other services necessary to construct, complete in place and accepted the new Wet Well Wall Structural Rehabilitation at the Sale Road Lift Station located at 715 W. Sale Road in the City of Lake Charles, Louisiana. All work shall be in accordance with the plans and specifications and/or engineer approved shop drawings. In general, the work includes, but is not limited to the following: a. Mobilization b. Temporary signs and barricades c. Construct and remove steel sheet pile retaining walls d. Excavation and disposal of spoils e. Construct new concrete seal slab f. Pressure wash the exterior wall surfaces and apply bonding adhesive to the existing wet well walls g. Construct new concrete exterior wall sections on one side at a time in three (3) lifts per wall. h. Furnish, place and compact sand backfill i. Construct aggregate backfill cap at top of fill j. Remove and replace new 4 foot chain link fence k. Final cleanup, including hydroseeding
03/17/2015 07:45 PM UTC
Project No. 2011-604B, Capital Project No. 3117
Project No. 2011-604B Capital Project No. 3117 Holmes Street Bridge Removal City of Lake Charles, LA ~ The general scope of work includes, but is not limited to, the following items: (a) The removal of the existing timber bridge originally constructed in 1958; (b) The construction of a concrete pavement turnaround on the South side of the drainage lateral; (c) The installation of approximately 225 linear feet of W beam guardrail with end of road object markers as indicated on plans; (d) The installation of the drainage system consisting of approximately 204 linear feet of 18 diameter RCP, 8 each CB-01 drop inlets and 160 linear feet of 18” diameter corrugated metal pipe; (e) The construction of 6" thick compacted stone aggregate driveways at two locations.
03/17/2015 07:45 PM UTC
Project No. 2014-640, Capital Project No. 3109
Project No. 2014-640 Capital Project No. 3109 Mallard Cove Golf Course No. 8 Hole Irrigation Pond Retaining Wall Rehabilitation City of Lake Charles, LA ~ The general scope of work for Project No. 2014-640 includes installation of a PVC sheet pile retaining wall around a portion of the irrigation pond at the No. 8 hole at Mallard Cove Golf Course.
02/18/2015 08:45 PM UTC
Project No. 2014-634, Capital Project No. 3178
Project No. 2014-634 Capital Project No. 3178 Theriot Street, North Booker Street, North Adams Street and Woodard Street Asphalt Overlay and Drainage Improvements City of Lake Charles, LA ~ The general scope of work for Project No. 2014-634 includes improvements to roadside ditches, patches of full depth asphalt repair; and overlay of the existing asphalt surface. The project sites for the improvements are Theriot Street from Pear Street to North Adams Street, North Booker Street from Theriot Street to Theriot Street, North Adams Street from Theriot Street to Woodard Street, and Woodard Street from North Adams Street to Simmons Street in the City of Lake Charles, LA.
02/18/2015 08:45 PM UTC
Project No. 2014-OP0402
Project No. 2014-OP0402 Reroofing Fire Station #6 City of Lake Charles, LA ~ Provide all labor, material, equipment, and services necessary to complete the installation of all work shown on the plans and specifications. Project Summary: Modified Roof Area 1. Remove existing roof membrane and related sheet metal items down to the wood deck. 2. Repair wood deck as required. 3. Remove drain bowl and drain lines. Close holes with 16 galvanized sheet metal. 4. Loose lay red rosin sheet. 5. Install specified insulation (3” Polyisocyanurate Insulation) with fasteners. 6. Install tapered insulation (1/4” : 12” per foot slope) and recovery board (Six Sided Asphalt Impregnated Wood Fiber) in hot asphalt. 7. Install two-ply, high performance Type III SBS Modified roofing system with granulated surface. 8. Install new metal flashings, expansion joint covers and prefabricated metal edge assembly. 9. Fabricate and install new gutters and downspouts. 10. Provide and install new soffit panel system around perimeter of building. 11. Provide and install sheet metal around existing wood beams. 12. Contractor responsible for all electrical and mechanical work required to complete the specified work. Work may include raising curbs and air conditioning units. Shingle Roof Area 1. Remove existing shingles and related sheet metal items down to the wood deck. 2. Repair and replace any damaged or rotten decking. Secure loose decking as required. 3. Install specified base sheet over wood deck prior to installing shingles. 4. Set starter shingles in flashing cement. 5. Fabricate and install new drip edge. 6. Fabricate and install new vents. 7. Install new 30 year architectural shingles. 8. Shingle installation shall not commence until modified roof assembly is completed. 9. Issue specified warranty.
02/18/2015 08:45 PM UTC
Capital Project No. CP3187
Capital Project No. CP3187 2014 Sidewalk Improvements City of Lake Charles, LA ~ • The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations: o Lake Street, West Side (Sallier St. to Suffolk Manor Apartment Homes) o Lake Street, East Side (Busy Bee Gas Station to Baker Street) o Power Center Parkway, South Side (Existing Sidewalk at Magnet School to Temporary Magnet School)
12/16/2014 08:45 PM UTC
Project No. 2011-597, Bond Issue No. SW0011
Project No. 2011-597 Bond Issue No. SW0011 Small Bayou Sewer Force Main and Lift Station Installation City of Lake Charles, LA ~ This work includes construction of a new lift station and force main, complete with all piping, electrical, pumps, valves, FM monitoring unit, ultrasonic level control, manholes, excavating, backfilling, etc. and any other items necessary to provide a complete system which functions properly to the satisfaction of the Engineer and Wastewater Department.
11/18/2014 08:45 PM UTC
Project No. 2014-639, Capital Project No. 3191
Project No. 2014-639 Capital Project No. 3191 12th Street Pavement Repair Between 8th and 9th Avenue City of Lake Charles, LA ~ The general scope of work includes removal and replacement of approximately 175 linear feet of existing roadway pavement, base, and subgrade material on 12th Street between 8th and 9th Avenue. The existing subgrade soils are exhibiting swelling characteristics. The distressed pavement and poor subgrade material shall be removed and replaced with #610 stone base material and new concrete pavement. Roadway and impacted drives, walks, and drainage will be repaired.
11/04/2014 08:45 PM UTC
Capital Project No. 3188
Project No. CP3188 Cline, Colletta, and Bank St. Lift Station Improvements City of Lake Charles, Louisiana ~ Scope of Services: • The City of Lake Charles Wastewater Division owns and operates the Cline, Colletta, and Bank Street Lift Stations. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project: 1. Remove existing pumps and replace with new submersible pumps, remove existing electrical and controls and replace / relocate with new, remove existing piping and valves and replace with new, remove existing valve vault and wet well riser and replace with new – Bank Street Lift Station ONLY. 2. Clean, repair, and coat the wet wells, install hurricane fencing with green slats, and install permanent bypass connection – at EACH lift station.
10/14/2014 07:45 PM UTC
321 - 330 of 374 Solicitations
1 2 29 30 31 33 35 36 37 38