CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3212
Capital Project No. CP3212
1st Avenue Reconstruction Gieffers St. to Moeling St.
City of Lake Charles, LA ~
I. Scope of Work:
The City of Lake Charles desires to reconstruct four (4) blocks and associated intersections of the 1st Avenue roadway. Reconstruction will consist of existing pavement removal, general excavation, stone base construction and complete PCC pavement reconstruction of the roadway as funds permit not to exceed AFC of $800,000.00. The effected blocks of 1st Avenue upon which work is planned are as follows:
i. 1st Avenue PCC Repairs on the existing PCC blocks (Gieffers St. – Moeling Street)
| 10/20/2015 07:45 PM UTC |
|
Project No. CP3206
Capital Project No. CP3206
WWTP A Basin A-13 Rehabilitation Project
City of Lake Charles, LA ~
Scope of Work:
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-13. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting approximately 11,300 linear feet of existing 6” and 8” sewer to new 8”.
2. Open cut replacement of approximately 5,000 linear feet of existing 6” and 8” sewer to new 8”.
3. Replacement of approximately 350 active sewer service laterals.
4. Coating approximately 160 vertical feet of existing and new manholes.
| 10/06/2015 07:45 PM UTC |
|
Project No. 2015-646, Capital Project No. 3109
PROJECT NO. 2015-646
CAPITAL PROJECT NO. 3109
MALLARD COVE GOLF COURSE NO. 8 HOLE IRRIGATION POND
SLOPE IMPROVEMENTS
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for Project No. 2015-646 includes improvement of the pond slope near the green for Hole No. 8 at Mallard Cove Golf Course using 3 x 1.5 limestone, as well as required drainage pipe extensions.
| 09/15/2015 07:45 PM UTC |
|
Project No. 2014-633, Capital Project No. CP3040, State Project No. H.010868
STATE PROJECT NO. H.010868
PROJECT NO. 2014-633
CAPITAL PROJECT NO. 3040
1ST AVENUE MULTI-USE TRAIL PART ONE
12TH STREET TO 7TH STREET
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for State Project No. H.010868, Project No. 2014-633, 1st Avenue Multi-Use Trail Part One, includes the installation of a new 8 foot wide asphalt trail and the associated concrete sidewalk connectivity enhancements on 1st Avenue from 12th Street North to 7th Street.
| 09/15/2015 07:45 PM UTC |
|
Project No. CP3003
Capital Project No. 3003
Lake Charles Civic Center Perimeter Power
Holiday Lighting Program Phase II
City of Lake Charles, LA ~
Provide and installing new in-ground pullboxes with electrical distribution capability in the area in front of the Civic Center (West side of Lakeshore Drive from Civic Center Main Entrance due south to Gill Street) and on south side of Gill Street between Lakeshore Drive and Bord Du Lac. Work includes a new 277/480V Service at Gill Street and Lakeshore Drive with capacity to feed a 480V 3 Phase lift station in the future.
| 08/18/2015 07:45 PM UTC |
|
Capital Project No. CP3210
Capital Project No. CP3210
Blake, Comeaux, Greinwich Village, and Griffin Coulee Lift Stations Rehabilitation
City of Lake Charles, LA ~
I. Scope of Services:
A. Blake Lift Station
1. Demolish existing building around station and replace with new hurricane fence with green slats around site.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Replace all valves and valve vault lid. Expand valve vault to expose where the two pump discharge pipes combine into a single forcemain and install a permanent bypass connection.
4. Electrical improvements.
5. Coat wet well.
B. Comeaux Lift Station
1. Install green slats in existing hurricane fence.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Replace all valves. Expand valve vault to install a permanent bypass connection.
4. Electrical Improvements.
5. Coat wet well.
C. Greinwich Village Lift Station
1. Demolish existing wooden fence and provide new hurricane fence with green slats.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Improve top slab. Coat new wet well.
4. Improve discharge configuration.
5. Replace all valves and evaluate feasibility for permanent bypass connection.
6. Electrical Improvements.
7. Coat wet well.
D. Griffin Coulee Lift Station
1. Replace existing double door and windows.
2. Install green slats on existing hurricane fence.
3. Replace existing pumps with new dry pit submersible pumps.
4. Replace all valves.
5. New wet well access hatch.
6. Provide steps with handrail on entry to station.
7. Electrical Improvements.
8. Coat wet well.
| 08/04/2015 07:45 PM UTC |
|
Capital Project No. CP3219
Capital Project No. CP3219
George West Water Treatment Plant - Filter Media Replacement Project
City of Lake Charles, LA ~
I. Scope of Work:
a. George West Water Treatment Plant Filter Media Replacement
i. Replacement of Filter Media in Filters No. 1 – 6
ii. Estimated total volume needed: 3,400 ft3
iii. Work includes, placement, disinfection, conditioning, and start up
| 08/04/2015 07:45 PM UTC |
|
Project No. 2014-643, Capital Project No. 3217
Project No. 2014-643
Capital Project No. 3217
Water and Sewer Extension on Weaver Road North of Ham Reid Road
City of Lake Charles, LA ~
The general scope of work is the installation of a 12 inch water line from Ham Reid Road North to the Ridge at Lake Charles Apartment Complex, and installation of a 12 inch sewer line from the lift station North of Ham Reid, North approximately 1460 feet.
| 07/14/2015 07:45 PM UTC |
|
Capital Project No. CP3051
Capital Project No. CP3051
LEI Project No. 15-005
2014-2015 City Wide Striping Project
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. 12th Street (Hodges Street to 110 ft. East of Highway 14)
2. Common Street (Sale Road to Kirby Street)
3. North Ryan Street (Belden Street to 300 ft. West on River Road)
4. Dr. Michael DeBakey Drive (Ryan Street to Lake Street)
5. Lake Street (College Street to Sale Road)
6. Rail Road Symbols (Various Locations)
7. Alamo Street (Enterprise Boulevard to Ryan Street)
8. Bilbo Street (Kirby Street to Clarence Street)
9. Clarence Street (Lakeshore Drive to Kirkman Street)10. Derek Drive (Highway 14 to East Prien Lake Road)
11. East Prien Lake Road (Carver Road to East side of Highway 14)
12. Goos Street (Broad Street to Winterhalter Street)
13. Street removed from project
14. Kirkman Street (McNeese Street to Opelousas Street)
15. Sallier Street (Riverside Drive to Hodges Street)
16. Medora Street (Cathy Street to Highway 171)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. Opelousas Street (Enterprise Boulevard to Highway 171)
19. Alvin Street (Sallier Street to Shell Beach Drive)
20. Ernest Street (Sale Road to Sallier Street)
21. Lake Street (Sallier Street to Shell Beach Drive)
22. Merganser Street (J. Bennett Johnston Avenue to Mallard Cove Street)
23. Dillard Loop (Highway 14 to Derek Drive)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. Pineview Street (Highway 171 to Cathy Street)
26. Cathy Street (Alice Street to Medora Street)
27. Mallard Cove Street (Merganser Street to Golf Course)
28. Chennault Parkway (Merganser Street to Dead End)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 06/30/2015 07:45 PM UTC |
|
Project No. 2013-623, CP No. 3213
Project No. 2013-623
Capital Project No. 3213
Replacement of Approximately 300 Feet of
36” Sewer Line on Penn Street West of Creole Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2013-623 includes replacement of an existing 36 inch gravity sewer main with new 36 inch polypropylene pipe, water line adjustment, installation of manholes, fittings, and tying the new sewer main into the wet well at the existing Penn Street Sewer Lift Station.
| 06/16/2015 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.