General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. 2011-599, Bond Issue No. SW0006
Project No. 2011-599 Bond Issue No. SW0006 5th Avenue Sewer Extension and Lift Station Bancroft Street South to Contraband Bayou City of Lake Charles, LA ~ The general scope of work for Project No. 2011-599, Bond Issue No. SW0006, includes the installation of a gravity sewer system containing 8"-15" diameter pipe as well as the installation of a new sewer lift station including new force mains. The scope of work also includes the demolition and restoration of existing lift station sites serving the local apartment complexes.
05/17/2016 07:45 PM UTC
Project No. 2014-629
Project No. 2014-629 Bank Street and 7th Street Intersection City of Lake Charles, LA ~ The general scope of work includes the reconstruction of 510 linear feet of 7th Street which includes the intersection with Bank Street along with the reconstruction of sidewalks and six sets of concrete stairs as designated on the plans. There are eight sets of existing stairs; six sets will be rebuilt while two sets will be eliminated. The project also includes removal and replacement of 8 inch sanitary sewer line, 6 inch water line, and 2 inch water line, all as shown on the drawings.
05/03/2016 07:45 PM UTC
Project No. 2014-635
Project No. 2014-635 Lift Station Upgrade & Force Main Extension Pecan Acres Drive to Nelson Road City of Lake Charles, LA~ This work includes construction of a new lift station and force main, complete with all piping, electrical, pumps, valves, SCADA System, ultrasonic level control, manholes, excavating, backfilling, etc. and any other items necessary to provide a complete system which functions properly to the satisfaction of the Engineer and Wastewater Department. All work shall be in accordance with the project plans and specifications and approved shop drawings.
04/05/2016 07:45 PM UTC
Project No. CP3216
Project No. CP3216 Lake Street and Ham Reid Road Waterline Looping Project City of Lake Charles, LA ~ I. Scope of Work:  Design and construction of approximately 3,900 ft. of 12 inch water main on Ham Reid Rd. and Lake Street. The proposed waterline would connect the existing 12 inch water main that terminates on Ham Reid Rd. to the existing12 inch water main that terminates on Lake Street near Oxford Ct.  Design and construction of approximately 2950 ft. of 12 inch water main loop on Ham Reid Rd and Elliot Rd. The proposed waterline would connect to the existing 12 inch water main that terminates on Ham Reid Rd, near Weaver Rd., to the 12 inch water main on Elliot Rd South of St. John Elementary School.
02/16/2016 08:45 PM UTC
Project No. 2014-626
Project No. 2014-626 Ryan Streetscape Phase Two City of Lake Charles, LA ~ The goal of this project is to enhance pedestrian safety and beautify Ryan Street streetscape corridor from Clarence Street to the Pithon Coulee bridge. This will be accomplished by the reconstruction of the sidewalks to include pavers and the reconstruction of the intersection of Ryan & Clarence Streets to include pavered crosswalks. The scope of work shall also include overhead decorative lamp posts, traffic signal modifications, drainage, improved utility access and pavement markings.
02/16/2016 08:45 PM UTC
Project No. CP3128
Project No. CP3128 WasteWater Treatment Plant B/C Expansion and Rehabilitation Project City of Lake Charles, LA ~ I. Scope of Services: A. Construction of a new WWTP B/C, includes but is not limited to: 1. A new influent pump station with coarse screening and influent pumps. 2. A new headworks structure with fine screening and grit removal. 3. Two (2) new multi-channel oxidation ditches 4. Three (3) new circular final clarifiers 5. A new ultraviolet disinfection facility 6. A new non-potable water system 7. A new return activated sludge / waste activated sludge pump station 8. Two (2) new electrical buildings 9. Demolition of the existing plant facilities as indicated 10. Miscellaneous electrical, instrumentation, civil, etc.
02/16/2016 08:45 PM UTC
Project No. 2014-627, Capital Project No. 3220
Project No. 2014-627 Capital Project No. 3220 City of Lake Charles, LA ~ The general scope of work for Project No. 2014-627 provides for the renovation of the Cleveland Street Sewer Lift Station, including removal and replacement of the two (2) pumps, valves, piping, construction of temporary driveways for two (2) nearby homes; excavating, backfilling, etc., and any other items necessary to provide a complete system which functions properly to the satisfaction of the Project Engineer and Wastewater Department of the City of Lake Charles.
12/15/2015 08:45 PM UTC
Capital Project No. CP3221, LEI Project No. 15-012
Capital Project No. CP3221 LEI Project No. 15-012 2015 Asphalt Overlay of Various Streets City of Lake Charles, LA ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, aggregate surface course shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. Calcasieu Street (Opelousas Street to Jackson Street) 2. N. Lincoln Street (I-10 Service Road to Jackson Street) 3. N. Jake Street (I-10 Service Road to Jackson Street) 4. N. Simmons Street (I-10 Service Road to Jackson Street) 5. Lisle Peters Road (Big Lake Road to Dead End) 6. N. Adams Street (Moeling Street to Commercial Street) 7. N. Adams Street (Opelousas Street to Dead End)) 8. Sale Road (Canal Street to Lake Street) 9. Raintree Cove (Lisle Peters Road to River Lane) 10. Goodman Road (Broad Street to Highway 90) 11. Louisiana Avenue (McNeese Street to Dead End) 12. Carriage Lane (Lisle Peters Road to River Lane) 13. 3rd Street (Highway 14 to 6th Avenue) 14. 6th Street (Kayouchee Street to McNabb Street) 15. River Lane 16. Creole Street (Prien Lake Road to I-210) 17. Jackson Street (North Simmons Street to Calcasieu Street) 18. Parking Lot Across from City Hall on Pujo Street
11/03/2015 08:45 PM UTC
Capital Project No. CP3072
Capital Project No. CP3072 Riverside Park Phase 2B City of Lake Charles, LA ~ This project will include construction of a new enclosed and conditioned pavilion building, parking area, picnic areas and a new playground. A new dock is included as alternate no 1. The project has a total construction time of 210 calendar days. The project has liquidated damages of $500 per calendar day.
11/03/2015 08:45 PM UTC
Capital Project No. CP3212
Capital Project No. CP3212 1st Avenue Reconstruction Gieffers St. to Moeling St. City of Lake Charles, LA ~ I. Scope of Work: The City of Lake Charles desires to reconstruct four (4) blocks and associated intersections of the 1st Avenue roadway. Reconstruction will consist of existing pavement removal, general excavation, stone base construction and complete PCC pavement reconstruction of the roadway as funds permit not to exceed AFC of $800,000.00. The effected blocks of 1st Avenue upon which work is planned are as follows: i. 1st Avenue PCC Repairs on the existing PCC blocks (Gieffers St. – Moeling Street)
10/20/2015 07:45 PM UTC
301 - 310 of 374 Solicitations
1 2 27 28 29 31 33 34 35 36 37 38