CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2014-641, Bond Issue No. SW0002
PROJECT NO. 2014-641
BOND ISSUE NO. SW0002
SEWER FORCE MAIN EXTENSION
HENDERSON BAYOU ROAD
FROM WEST PRIEN LAKE ROAD TO DEAD END OF HENDERSON BAYOU ROAD
(PHASE TWO – LOCKE LANE WEST TO DEAD END)
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work includes, but is not limited to, the following:
a. The directional drill installation of approximately 610 linear feet of new 1.5 inch diameter DR-9 HDPE low pressure sewer force main
b. The directional drill installation of approximately 446.linear feet of new 2 inch diameter DR-11 HDPE low pressure sewer force main
c. The directional drill installation of approximately 820 linear feet of new 3 inch diameter DR-7 HDPE low pressure sewer force main
d. The installation of 4 each 2 inch gate valve flush stations
e. The connection of the force main to an existing stub pipe at a manhole located at Locke Lane and Henderson Bayou Road
This project is for the installation of the low pressure sewer force main and appurtenances only. The connections and installation of lateral lines and grinder pump stations are the responsibility of the individual residents.
| 10/14/2014 07:45 PM UTC |
Project No. 2012-615, Capital Project No. 2899
Project No. 2012-615
Capital Project No. 2899
EDI Special Project No. B-09-SP-LA-0141 and B-08-SP-LA-0535
Utility Extension to Serve Tract One C and Tract One D
Lake Charles Civic Center
City of Lake Charles, LA ~~~~ The general scope of work for Project No. 2012-615, includes, but is not limited to, the following:
(a) The directional drill installation of approximately 811 linear feet
of new 12” diameter DR-11 HDPE water line with associated
appurtenances.
(b) The open cut installation of approximately 330 linear feet of
new 12” diameter DR-18 PVC water line with associated
appurtenances.
(c) The directional drill installation of approximately 436 linear feet
of new 12” diameter DR-11 HDPE sanitary sewer line.
(d) The open cut installation of approximately 170 linear feet of
new 8” diameter SDR-26 PVC sanitary sewer line.
(e) The installation of 5 new sanitary sewer manholes.
(f) The directional drill installation of approximately 5960 linear
feet of new 3” diameter DR-13.5 HDPE conduit to include pull
wire, capped ends, and tracer wire. Utility conduit are grouped
in sets of 4 or 8 conduits. Utility conduit installed under this
contract is for the future use by others under separate contract.
| 09/16/2014 07:45 PM UTC |
Project No. 2014-630, Capital Project No. 3186
Project No. 2014-630
Capital Project No. 3186 ~~~
Drainage Improvements
10th Street Between 8th & 9th Avenue
And 11th Street Between 6th & 7th Avenue
City Of Lake Charles, LA
The general scope of work for Project No. 2014-630 includes drainage improvements, concrete pavement repair and sidewalk repair.
| 09/16/2014 07:45 PM UTC |
Project No. 2014-637, Capital Project No. 2968
Project No. 2014-637
Capital Project No. CP2968
Louisiana Avenue Bridge Over Contraband Bayou Piling Repair
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-637, Capital Project No. 2968, Louisiana Avenue Bridge Over Contraband Bayou Piling Repair, includes the following:
(a) Bridge piling repair;
(b) Spall repair on South approach slab;
(c) Sway bracing repair.
| 08/05/2014 07:45 PM UTC |
Project No. 2014-636, CP No. 3003
Project No. 2014-636
Capital Project No. 3003
Demolition of Old Harrah’s Hotel Site Parking Lot
And Building Foundation
City of Lake Charles, LA ~
The general scope of work is the demolition of the existing building foundation, pool, and concrete slabs. Also included is the placement of fill material to level the site.
Alternate Bid #1 includes those bid form items for the demolition of the concrete parking lot, light poles, and boardwalk sidewalks, along with required fill material to level the site.
| 07/15/2014 07:45 PM UTC |
Capital Project No. CP3089
Capital Project No. CP3089
New Transit Bus Wash
City of Lake Charles, LA ~
The project is to provide a 2,270 square foot facility to house a new automated bus wash system. The building will be a metal building with concrete block infill. The project will be complete with concrete drives and security fencing. The facility will be located on city owned property along Goodman Road.
| 06/17/2014 07:45 PM UTC |
Project No. CP3147
Capital Project No. CP3147
LCPD Annex Renovations
City of Lake Charles, LA ~
Upgrade and improve the existing building through renovations. The renovations will include major renovations to the Men and Women’s restrooms (4 total); renovations to the existing breakroom; revise the entry lobby area; and upgrade the open office area with solid wall offices.
| 05/20/2014 07:45 PM UTC |
Project No. CP3152
Capital Project No. CP3152
Lake Charles CDBG FY-2013 Sidewalk Improvements
City of Lake Charles, LA ~
I. Scope of Work:
• The City of Lake Charles desires to provide new sidewalks or repair existing sidewalks in the following locations as funds permit:
i. North Blake Steet, West Side (Moeling St.-Existing Sidewalk to Commercial St.)
ii. Commercial Street, North Side (North Shattuck St. to North Prater St.)
iii. Katherine Street, North Side (North Prater St. to Jr. Street)
iv. Martha Street, South Side (N. Shattuck to N. Prater Street)
v. Martha Street, North Side (N. Shattuck to N. Prater Street)
vi. Medora Street, North Side (Graham Street to MLK Hwy)
vii. Fournet Street, North Side ( N. 1st Avenue to N. Lyons Street)
| 05/06/2014 07:45 PM UTC |
Project No. CP3167
Capital Project No. CP3167
Lift Station Improvements OCD-DRU
City of Lake Charles, LA ~
I. Scope of Services:
Due to flooding from previous storm events, the City of Lake Charles evaluated several lift stations that were unable to properly pump the collected wastewater flows into the stations. The existing mechanical and electrical design configurations of these lift stations were the limiting factor of proper operation during the flooding. Proposed mechanical improvements include installation of new dry-pit submersible pumps that would enable the pumping of wastewater during flood events. Proposed electrical improvements include elevating the lift station’s control panels and switchgear above the 100-year base flood elevation.
A. Mechanical Evaluation – Mechanical improvements include installation of new dry-pit submersible pumps and the replacement of all suction and discharge valves and header piping to enable the pumping of wastewater during flood events at the following pump stations:
1. 7th Avenue
2. Colletta
3. Cline
4. Goos
5. Holly Hill
6. St. John
7. Creole
B. Electrical Evaluation – Electrical improvements include elevating the control panel(s)and switchgear above flood levels at the following pump stations:
1. Colletta
2. Goos
3. Holly Hill
4. Creole
| 05/06/2014 07:45 PM UTC |
Capital Project No. CP3176, LEI Project No. 13-023
Capital Project No. CP3176
LEI Project No. 13-023
East McNeese Utility Extension
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
This project generally consists of extending the existing 16″ PVC water line and 24″ PVC gravity waste water line on East McNeese Street to the east approximately 2,143 linear feet and 1,836 linear feet respectively.
The project will include the following items of work:
1. Clearing and grubbing;
2. Construction of a new water line and gravity waste water lines and appurtenances;
3. Removal and construction of permanent fencing;
4. Site grading and hydroseeding;
5. Pressure and leak testing of new waste water facilities and water lines and disinfection and Health Department water testing of the new water line.
| 05/06/2014 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.